HPD06/21/2023§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD06/21/2023§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
ECB10/10/2023FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION ON 2ND AND 3RD FLOOR I OBSERVED GAS PIPING IN PUBLIC CORRIDOR, STAIR ENCLOSURE- PROHIBITED BY 404.3 OF NYC FGC, REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB10/10/2023WORK WITHOUT PERMIT. AT TIME OF INSPECTION I OBSERVED NEW GAS PIPING FOR APARTMENT 3R. NO PERMIT ON DOB RECORDS TO PERFORM THIS WORK., OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
Primarily 5-6 family with 1 store or office · 2,451 sf lot · 1.63 FAR built · Flood zone X