← Back
BuildNYC
Church, synagogue, chapel
100-17 32ND AVENUE
QUEENS · East Elmhurst · BIN 4041703
💬 Discuss this project
1950Year Built
2Stories
M1Building Class
R4-1Zoning
6,433 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only 1 likely answered ▸
Church, synagogue, chapel · Owner of record: The Trustees of the Estate Belonging to the Diocese of Long Island · 11,400 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe Episcapol Church of Grace1 filing · 3 docs
Floor 1The Episcapol Church of Grace1p · 1 filing · 3 docs
CellarThe Episcopal Church of Grace and Resurrection, Grace ChurchUnder Construction4p · 3 filings · 10 docs
Site & exteriorThe Episcopal Church of Grace and ResurrectionUnder Construction2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Grace and Resurrection807/08/2026
The Episcopal Church of Grace and Resurection709/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stewart305/20/2026
KDV Designs Architects107/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mayanda Home Improvement*General Contractor303/21/2026
C.Q. Electr'l ContractingElectrical103/22/2026
FS ContractingGeneral Contractor109/29/2026
Master Fire MechanicalGeneral Contractor107/08/2026
Misa PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Stewart Engineering Services2506305/20/2026
NS Engineering & Consulting3652107/13/2023
Building Lifecycle
All (20)Filed (4)Permit Issued (4)Signed Off (2)Violation (5)Inspection (3)Special Inspection (2)
09/28/2026
Permit issued — General Construction
Q01404492-I1-GC
05/20/2026
Filed — Alteration
Construct an ADA ramp from the sidewalk to the cellar in the Open Space
Q01404492-I1
04/25/2024
Signed off — Alteration
Kitchen renovation: install FRP panels.Prep all open walls/ceilings by adding insulation, fire, and sound barrier system. Repair floor tiles and grout. Replace all drop ceiling tiles. Reinstall wall cabinets.
Q08041301-I1
12/19/2023
Signed off — Alteration
Q00898033-I1
10/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/10/2023
Permit issued — Plumbing
Q08041301-I1-PL
09/12/2023
Permit issued — General Construction
Q08041183-I1-GC
07/21/2023
Permit issued — Mechanical Systems
Q00898033-I1-MS
07/13/2023
Filed — Alteration
Q00898033-I1
01/30/2023
Filed — Alteration
Kitchen renovation: install FRP panels.Prep all open walls/ceilings by adding insulation, fire, and sound barrier system. Repair floor tiles and grout. Replace all drop ceiling tiles. Reinstall wall cabinets.
Q08041301-I1
01/30/2023
Filed — Alteration
Install a grease trap, hand sink, a three-compartment sink and a back flow device
Q08041183-I1
01/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
01/28/2023
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2015
Violation issued (ECB, open)
Construction
03/26/2002
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/16/1990
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFS Contracting09/28/2026
DOB NOWPlumbingSigned-offMisa Plumbing10/10/2023
DOB NOWGeneral ConstructionSigned-offMayanda Home Improvement*09/12/2023
DOB NOWMechanical SystemsSigned-offMaster Fire Mechanical07/21/2023
BISOTISSUEDCara Contracting08/01/1995
1 project · most recent 01/30/2023
Water/Sanitary
FiledStatusContractorScope
01/30/2023Signed-offMisa PlumbingWater/Sanitary
1 project · most recent 04/02/2024
General Wiring
FiledStatusContractorScope
04/02/2024CompleteC.Q. Electr'l ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/28/2023Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
01/28/2023Energy Code Compliance InspectionsEGAR STEWARTprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Episcopal Church of Grace and ResurrectionReligiousCellar
Project Q01404492 Alteration · Permit Entire · 05/20/2026
The Episcapol Church of GraceReligiousFloor 1, Roof
Project Q00898033 Alteration · LOC Issued · 07/13/2023
Grace Church of the ResurrectionReligiousCellar
Project Q08041183 Alteration · Permit Entire · 01/30/2023
Project Q08041301 Alteration · LOC Issued · 01/30/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026Q08041301-I1Request digital key ↗
08/25/2026Q08041183-I1Request digital key ↗
08/24/2026Q00898033-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/04/2019421530935Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q00898033-I1Open ↗
08/16/2026Q01404492-I1Open ↗
08/13/2026Q08041301-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/04/2019421530935Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/04/2019421530935Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/04/2019421530935Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026Q08041301-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q08041301-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026Q00898033-I1Open ↗
08/13/2026Q08041301-I1Open ↗
08/13/2026Q08041183-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/24/2026Q00898033-I1Open ↗
08/16/2026Q01404492-I1Open ↗
08/13/2026Q08041183-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/04/2019421530935Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/04/2019421530935Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/04/2019421530935Open ↗