← Back
BuildNYC
Three families
100-18 39TH AVENUE
QUEENS · BIN 4044349
💬 Discuss this project
1965Year Built
3Stories
C0Building Class
R6BZoning
2,680 sfGross Floor Area
3Units
Rent Stabilized13 Active Violations ▸
Three families · 1,700 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Boiler and gas meter replacement for 3-family building3p · 1 filing · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/24/2021$990K—Private party → Private party$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zheng & Associates209/20/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Office of Xiao Ye Zheng7471209/20/2021
Building Lifecycle
12/11/2024
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
12/11/2024
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS…
HPD violation · open
12/11/2024
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY
HPD violation · open
12/11/2024
§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST…
HPD violation · open
12/11/2024
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st…
HPD violation · open
46 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH Plumbing & Heating07/14/2021
BISPLISSUEDJohnny's P&H Contracting06/02/1998
BIS—ISSUEDN/A04/28/1998
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/21/2021Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
09/21/2021Energy Code Compliance InspectionsXIAO ZHENGprogress
09/21/2021Maintenance informationXIAO ZHENGenergy_progress
09/21/2021HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
09/21/2021HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
09/21/2021HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
09/20/2021Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
09/20/2021Energy Code Compliance InspectionsXIAO ZHENGprogress
09/20/2021HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
09/20/2021HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
09/20/2021Maintenance informationXIAO ZHENGenergy_progress
09/20/2021HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account