← Back
Two stories - detached, small or mid-size
100-36 199 STREET
QUEENS · BIN 4232272
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3AZoning
1,608 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2023$700K—— → —$435/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC110/10/2025
JBA103/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING203/21/2026
ARCHITECTURAL DESIGN SOLUTIONS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963110/10/2025
WORLD DESIGN ARCHITECTURE9323103/05/2024
Building Lifecycle
All (34)Filed (2)Permit Issued (1)Signed Off (1)Objection (6)Special Inspection (24)
10/22/2025
Objection raised — Admin
10/22/2025
Objection raised — Admin
10/22/2025
Objection raised — Cost
10/22/2025
Objection raised — Zoning
10/22/2025
Objection raised — Zoning
10/22/2025
Objection raised — Zoning
10/10/2025
Filed — Alteration CO
HORIZONTAL EXTENSION AT CELLAR ,1ST & 2ND FLOOR AND OTHER REPAIR WORK AS PER PLAN. ONE TO TWO-FAMILY DWELLING EXTENSION TO OBTAIN NEW C OF O.
Q01296826-I1
10/10/2025
Special inspection requirement — Masonry
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Vertical Masonry Foundation Elements
IGOR LISOVENKO
10/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Air barrier - visual inspection
IGOR LISOVENKO
10/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Insulation placement and R values
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Fenestration air leakage
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Lighting in dwelling units
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Maintenance information
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Fenestration areas
IGOR LISOVENKO
10/10/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Subgrade Inspections
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
10/02/2025
Special inspection requirement — Concrete - Cast-In-Place
IGOR LISOVENKO
12/12/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01013284-I1
03/20/2024
Permit issued — Solar
Q01013284-I1-SL
03/05/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01013284-I1
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
03/01/2024
Special inspection requirement — Final
JEFFREY BELL
03/01/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC03/20/2024
1 project · most recent 02/28/2024
FiledStatusContractorScope
02/28/2024CompleteVILLAGE ELECTL CONTRS INC—
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/10/2025MasonryIGOR LISOVENKOspecial
10/10/2025Exterior Insulation and Finish Systems (EIFS)IGOR LISOVENKOspecial
10/10/2025Vertical Masonry Foundation ElementsIGOR LISOVENKOspecial
10/10/2025HVAC-R and service water heating equipmentIGOR LISOVENKOenergy_progress
10/10/2025Air barrier - visual inspectionIGOR LISOVENKOenergy_progress
10/10/2025HVAC-R and service water piping design and insulationIGOR LISOVENKOenergy_progress
10/10/2025Insulation placement and R valuesIGOR LISOVENKOenergy_progress
10/10/2025Fenestration air leakageIGOR LISOVENKOenergy_progress
10/10/2025Fenestration and door U-factor and product ratingsIGOR LISOVENKOenergy_progress
10/10/2025Lighting in dwelling unitsIGOR LISOVENKOenergy_progress
10/10/2025Maintenance informationIGOR LISOVENKOenergy_progress
10/10/2025Fenestration areasIGOR LISOVENKOenergy_progress
10/10/2025Excavations - Sheeting, Shoring, and BracingIGOR LISOVENKOspecial
10/02/2025Subgrade InspectionsIGOR LISOVENKOspecial
10/02/2025Fire-Resistance Rated ConstructionIGOR LISOVENKOprogress
10/02/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
10/02/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/02/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
10/02/2025Concrete - Cast-In-PlaceIGOR LISOVENKOspecial
03/01/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
03/01/2024FinalJEFFREY BELLprogress
03/01/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
03/01/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/01/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q01013284-I1Request digital key ↗
08/15/2026Q01296826-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01296826-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026Q01296826-I1Open ↗
08/28/2026Q01296826-I1Open ↗
08/28/2026Q01296826-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026Q01296826-I1Open ↗
08/28/2026Q01296826-I1Open ↗
08/28/2026Q01296826-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q01013284-I1Open ↗
08/18/2026Q01296826-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q01013284-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01013284-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01296826-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01296826-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01296826-I1Open ↗