100 ALDRICH STREET · Co-op City · BIN 2095395
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized4,925 Active Violations 4,919 unresolved · 6 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Riverbay · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and balcony restoration1 filing
Floor 1Temporary chain link fence installation2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay3807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services109/23/2022
Enthink Engineers109/22/2022
Merritt Engineering Consultants108/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exo IndustriesScaffold807/08/2026
Star Electrical ContractorsElectrical103/22/2026
Exo IndustriesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Merritt Engineering Consulting460108/04/2022
Building Lifecycle
All (90)Filed (3)Permit Issued (5)Signed Off (3)Facade (FISP) (13)Violation (60)Special Inspection (6)
07/14/2025
Violation issued (HPD, open)
A
07/14/2025
Violation issued (HPD, open)
B
07/14/2025
Violation issued (HPD, open)
B
07/14/2025
Violation issued (HPD, open)
B
07/14/2025
Violation issued (HPD, open)
C
07/14/2025
Violation issued (HPD, open)
B
07/14/2025
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
02/12/2024
Cycle 9 facade report submitted
02/07/2024
Signed off — Alteration
X07997277-I1
02/07/2024
Signed off — Alteration
X07997250-I1
02/02/2024
Cycle 9 facade inspection completed
02/01/2024
Cycle 9 facade report signed — SAFE
01/16/2024
Signed off — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619118-I1
09/06/2023
Permit issued — Construction Fence
X07997277-I1-FN
09/06/2023
Permit issued — Sidewalk Shed
X07997250-I1-SH
04/17/2023
Permit issued — General Construction
X00619118-I1-GC
01/23/2023
Violation issued (HPD, open)
C
11/14/2022
Violation issued (HPD, open)
C
11/14/2022
Violation issued (HPD, open)
B
11/14/2022
Violation issued (HPD, open)
B
11/14/2022
Violation issued (HPD, open)
C
09/27/2022
Permit issued — Sidewalk Shed
X07997250-I1-SH
09/27/2022
Permit issued — Construction Fence
X07997277-I1-FN
09/23/2022
Filed — Alteration
X07997250-I1
09/22/2022
Filed — Alteration
X07997277-I1
08/04/2022
Filed — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619118-I1
06/28/2022
Violation issued (HPD, open)
C
05/11/2022
Special inspection requirement — Masonry
Christopher Krepcio
05/11/2022
Special inspection requirement — Post-installed Anchors
Christopher Krepcio
05/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
05/11/2022
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
05/11/2022
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
10/26/2021
Special inspection requirement — Final
Christopher Krepcio
08/04/2021
Violation issued (HPD, open)
B
08/04/2021
Violation issued (HPD, open)
B
08/04/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2019
Cycle 8 facade report signed — SWARMP
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2019
Cycle 8 facade report submitted
02/22/2019
Cycle 8 facade inspection completed
10/24/2018
Violation issued (HPD, closed)
I
08/23/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/23/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/26/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/09/2013
Violation issued (HPD, open)
B
09/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/25/2013
Violation issued (HPD, open)
B
06/25/2013
Violation issued (HPD, open)
B
06/19/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/17/2011
Violation issued (HPD, open)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offExo Industries09/06/2023
DOB NOWSidewalk ShedSigned-offExo Industries09/06/2023
DOB NOWGeneral ConstructionSigned-offExo Industries04/17/2023
DOB NOWSidewalk ShedSigned-offExo Industries09/27/2022
DOB NOWConstruction FenceSigned-offExo Industries09/27/2022
BISEQISSUEDProto Construction & DVLP09/19/2009
BISOTISSUEDProto Construction & DVLP09/18/2009
BISEQISSUEDProto Construction & DVLP05/22/2009
BISEQISSUEDRiverbay05/05/2009
BISEQISSUEDRiverbay05/05/2009
BISOTISSUEDProto Construction & Development09/12/2008
BISEQISSUEDProto Construction & Development05/10/2008
BISEQISSUEDRiverbay03/21/2008
BISOTISSUEDProto Construction & Development01/28/2008
BISEQISSUEDRiverbay01/18/2008
BISOTISSUEDProto Construction & Development04/05/2007
BISEQISSUEDProto Construction & Development03/08/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDProto Construction & Development01/19/2006
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay02/24/2003
BISEQISSUEDRiverbay02/24/2003
BISPLISSUEDS & L Plumbing02/03/2003
BISEQISSUEDRiverbay08/15/2002
BISOTISSUEDNab Construction05/22/1998
BISMHISSUEDNab Construction04/29/1997
BISOTISSUEDNab Construction09/26/1996
3 projects · most recent 09/26/2022
FiledStatusContractorScope
09/26/2022CompleteRichard Neu—
11/14/2018CompleteStar Electrical Contractors—
11/14/2018CompleteStar Electrical Contractors—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/11/2022MasonryChristopher Krepciospecial
05/11/2022Post-installed AnchorsChristopher Krepciospecial
05/11/2022Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
05/11/2022Air barrier - visual inspectionChristopher Krepcioenergy_progress
05/11/2022Fenestration air leakageChristopher Krepcioenergy_progress
10/26/2021FinalChristopher Krepcioprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026X07997277-I1Request digital key ↗
08/24/2026X07997250-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026X07997277-I1Open ↗
08/24/2026X07997250-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026X00619118-I1Open ↗
09/02/2026X00619118-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026X00619118-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00619118-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X07997250-I1Open ↗