← Back
BuildNYC
Elevator cooperative
Coop City
100 ASCH LOOP · Co-op City · BIN 2095396
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized4,930 Active Violations 4,924 unresolved · 6 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Riverbay · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and balcony restoration1 filing
Floor 1EXO INDUSTRIES CORP temporary chain link fence installation2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay3607/08/2026
Co-OP City Riverbay203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers309/23/2022
Merritt Engineering Consultants102/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hovann203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exo IndustriesScaffold1203/21/2026
Exo IndustriesGeneral Contractor407/08/2026
WCK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Merritt Engineering Consulting460102/08/2021
Building Lifecycle
All (92)Filed (4)Permit Issued (6)Signed Off (3)Facade (FISP) (13)Violation (60)Special Inspection (6)
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, closed)
C
03/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2024
Violation issued (HPD, closed)
A
11/30/2023
Violation issued (HPD, open)
C
04/28/2023
Signed off — Alteration
X00563201-I1
03/28/2023
Cycle 9 facade report submitted
03/20/2023
Cycle 9 facade report signed — SAFE
03/09/2023
Cycle 9 facade inspection completed
12/24/2022
Violation issued (HPD, open)
A
12/24/2022
Violation issued (HPD, open)
B
12/24/2022
Violation issued (HPD, open)
B
11/05/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00471165-I1
10/07/2022
Violation issued (ECB, closed)
Construction
09/27/2022
Special inspection requirement — Final
Sunil Saigal
09/23/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00471165-P1
08/17/2022
Signed off — Alteration
FACADE AND BALCONY RESTORATION AT 100 ASCH LOOP BIN 2095396,120 ASCH LOOP BIN 2128841 AND 140 ASCH LOOP BIN 2128842 AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00461817-I1
08/12/2022
Violation issued (HPD, open)
B
08/09/2022
Permit issued — Construction Fence
X00563201-I1-FN
05/10/2022
Permit issued — General Construction
X00461817-I1-GC
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
02/22/2022
Permit issued — Sidewalk Shed
X00471165-I1-SH
08/04/2021
Filed — Alteration
X00563201-I1
08/04/2021
Permit issued — Construction Fence
X00563201-I1-FN
07/13/2021
Violation issued (ECB, closed)
Construction
05/12/2021
Permit issued — General Construction
X00461817-I1-GC
04/16/2021
Violation issued (HPD, closed)
A
02/26/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00471165-I1
02/26/2021
Permit issued — Sidewalk Shed
X00471165-I1-SH
02/08/2021
Filed — Alteration
FACADE AND BALCONY RESTORATION AT 100 ASCH LOOP BIN 2095396,120 ASCH LOOP BIN 2128841 AND 140 ASCH LOOP BIN 2128842 AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00461817-I1
01/27/2021
Special inspection requirement — Masonry
Christopher Krepcio
01/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
01/27/2021
Special inspection requirement — Final
Christopher Krepcio
01/27/2021
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
01/27/2021
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
11/10/2020
Violation issued (HPD, open)
A
11/10/2020
Violation issued (HPD, open)
B
09/26/2020
Violation issued (HPD, closed)
A
09/26/2020
Violation issued (HPD, open)
B
09/26/2020
Violation issued (HPD, open)
B
09/26/2020
Violation issued (HPD, open)
B
07/17/2020
Violation issued (HPD, open)
A
07/17/2020
Violation issued (HPD, open)
A
07/17/2020
Violation issued (HPD, open)
A
07/17/2020
Violation issued (HPD, open)
A
07/17/2020
Violation issued (HPD, open)
C
02/27/2020
Violation issued (HPD, open)
C
02/27/2020
Violation issued (HPD, closed)
B
07/22/2019
Violation issued (HPD, open)
A
07/22/2019
Violation issued (HPD, open)
B
07/22/2019
Violation issued (HPD, open)
A
07/22/2019
Violation issued (HPD, open)
B
07/22/2019
Violation issued (HPD, open)
A
07/22/2019
Violation issued (HPD, open)
B
06/30/2019
Cycle 8 facade report signed — SWARMP
06/08/2019
Violation issued (HPD, open)
B
05/17/2019
Violation issued (HPD, closed)
B
05/17/2019
Violation issued (HPD, open)
B
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offExo Industries08/09/2022
DOB NOWGeneral ConstructionSigned-offExo Industries05/10/2022
DOB NOWSidewalk ShedSigned-offExo Industries02/22/2022
DOB NOWConstruction FenceSigned-offExo Industries08/04/2021
DOB NOWGeneral ConstructionSigned-offExo Industries05/12/2021
DOB NOWSidewalk ShedSigned-offExo Industries02/26/2021
BISEQISSUEDAdvanced Construction Equipment08/14/2017
BISEQISSUEDDynamic Installation07/24/2017
BISOTISSUEDIrw Restoration06/21/2017
BISOTISSUEDIrw Restoration06/05/2017
BISOTISSUEDRiverbay05/12/2017
BISEQISSUEDAdvanced Construction Equipment08/11/2016
BISEQISSUEDDynamic Installation07/01/2016
BISOTISSUEDRiverbay05/03/2016
BISOTISSUEDIrw Restoration04/15/2016
BISEQISSUEDAdvanced Construction Equipment09/14/2015
BISOTISSUEDRiverbay08/19/2015
BISEQISSUEDDynamic Installation07/24/2015
BISEQISSUEDAdvanced Construction Equipment09/17/2014
BISEQISSUEDDynamic Installation07/15/2014
BISOTISSUEDProto Construction & Development01/28/2008
BISOTISSUEDProto Construction & Development03/16/2007
BISEQISSUEDProto Construction & Development03/08/2007
BISEQISSUEDProto Construction & Development05/01/2006
BISOTISSUEDProto Construction & Development03/14/2006
BISOTISSUEDProto Construction & Development06/05/2003
BISEQISSUEDProto Construction & Development01/09/2002
BISOTISSUEDProto Construction & Development12/28/2001
BISOTISSUEDProto Construction & Development12/11/2001
BISEQISSUEDProto Construction05/15/2001
BISOTISSUEDProto Construction05/15/2001
BISOTISSUEDNab Construction05/21/1998
BISMHISSUEDNab Construction04/29/1997
BISOTISSUEDInterstate Industrial04/16/1997
BISOTISSUEDInterstate Industrial01/07/1997
BISOTISSUEDNab Construction04/29/1996
BISPLISSUEDF&V Mechanical PLG. & Heating02/06/1996
BISOTISSUEDNab Construction02/06/1996
4 projects · most recent 02/26/2021
FiledStatusContractorScope
02/26/2021CompleteRichard Neu—
03/04/2020Permit IssuedStar Electrical Contractors—
10/31/2019Permit IssuedStar Electrical Contractors—
05/23/2019Permit IssuedStar Electrical Contractors—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/27/2022FinalSunil Saigalprogress
01/27/2021MasonryChristopher Krepciospecial
01/27/2021Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
01/27/2021FinalChristopher Krepcioprogress
01/27/2021Air barrier - visual inspectionChristopher Krepcioenergy_progress
01/27/2021Fenestration air leakageChristopher Krepcioenergy_progress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/25/2026X00471165-I1Request digital key ↗
08/15/2026X00471165-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00461817-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026X00563201-I1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION14
08/14/2017240072693Open ↗
07/24/2017220362453Open ↗
06/29/2017220474671Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
05/24/2017220474671Open ↗
04/04/2016220524546Open ↗
08/21/2015220474671Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
11/29/2017220474671Open ↗
05/24/2017220474671Open ↗
04/18/2016220474671Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/24/2017220474671Open ↗
04/04/2016220524546Open ↗
08/21/2015220474671Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/24/2017220474671Open ↗
04/04/2016220524546Open ↗
08/21/2015220474671Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026X00461817-I1Open ↗
08/28/2026X00461817-I1Open ↗
08/28/2026X00461817-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00471165-I1Open ↗
08/25/2026X00471165-P1Open ↗
08/25/2026X00563201-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X00461817-I1Open ↗
08/28/2026X00461817-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/16/2014240072693Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/16/2014240072693Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/21/2015220474671Open ↗
09/19/2014220401991Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00461817-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/29/2017220474671Open ↗
05/24/2017220474671Open ↗
08/21/2015220474671Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/16/2014240072693Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/29/2017220474671Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00461817-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/16/2014240072693Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSHED LETTER3
08/22/2016240072693Open ↗
07/08/2016220362453Open ↗
08/17/2015220362453Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/04/2017220474671Open ↗
11/29/2017220474671Open ↗
▸BISSUPERSEDING LETTER1
06/13/2017220474671Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/01/2015240072693Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/29/2017220474671Open ↗
04/04/2016220524546Open ↗
08/21/2015220474671Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
04/04/2016220524546Open ↗
08/21/2015220474671Open ↗
09/19/2014220401991Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
05/24/2017220474671Open ↗
09/29/2014240072693Open ↗
▸BISBOROUGH INTAKE FORM1
11/29/2017220474671Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/16/2014240072693Open ↗