← Back
QUEENS
100 BEACH 25 STREET
QUEENS · BIN 4623278
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Open Violations 1 unresolved · 2 paperwork only ▸
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 07/05/2022
Concrete
FiledStatusContractorScope
07/05/2022Signed-offINNOVATIVE CONSTRUCTION &Concrete
08/31/2020——Concrete
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Signed Off (1)Violation (4)Inspection (1)Special Inspection (10)
02/25/2026
Violation issued (ECB, open)
Construction
01/30/2026
Signed off — Alteration
Removal of 2 existing concrete & recycled plastic lumber stairs & replace with 2 steel pipe pile supported concrete and recycled plastic lumber ADA Accessible ramps. The ramps are replacing stairs to Rockaway Boardwalk at the ends of Beach 24 & 25 Streets
Q00462268-S2
01/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/26/2025
Permit issued — Foundation
Q00462268-S2-GC-CX
02/07/2024
Permit issued — General Construction
Q00462268-S2-GC-CX
04/26/2023
Violation issued (ECB, closed)
Construction
04/24/2023
Permit issued — General Construction
Q00462268-S2-GC-CX
10/28/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/12/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JAMES WILSON
07/05/2022
Filed — Alteration
Removal of 2 existing concrete & recycled plastic lumber stairs & replace with 2 steel pipe pile supported concrete and recycled plastic lumber ADA Accessible ramps. The ramps are replacing stairs to Rockaway Boardwalk at the ends of Beach 24 & 25 Streets
Q00462268-S2
06/29/2022
Special inspection requirement — Concrete - Cast-In-Place
JAMES WILSON
06/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
06/29/2022
Special inspection requirement — Subgrade Inspections
JAMES WILSON
06/29/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JAMES WILSON
06/29/2022
Special inspection requirement — Deep Foundation Elements
JAMES WILSON
06/20/2022
Special inspection requirement — Final
JAMES WILSON
06/20/2022
Special inspection requirement — Footing and Foundation
JAMES WILSON
02/17/2022
Violation issued (ECB, open)
Construction
02/23/2021
Filed — Alteration
Removal of 2 existing concrete & recycled plastic lumber stairs & replace with 2 steel pipe pile supported concrete and recycled plastic lumber ADA Accessible ramps. The ramps are replacing stairs to Rockaway Boardwalk at the ends of Beach 24 & 25 Streets
Q00462268-I1
01/28/2021
Special inspection requirement — Energy Code Compliance
Joseph Menzer
01/28/2021
Special inspection requirement — Final
Joseph Menzer
08/31/2020
Filed — Alteration
Removal of 2 existing concrete & recycled plastic lumber stairs & replace with 2 steel pipe pile supported concrete and recycled plastic lumber ramps. The ramps are replacing stairs to Rockaway Boardwalk at the ends of Beach 24 & 25 Streets
Q00380340-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INNOVATIVE CONSTRUCTION203/22/2026
OCEANFRONT PALACE LLC GOL103/22/2026
BEACHWAY EQUITIES203/21/2026
BOX PLACE REALTY1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE RBA GROUP307/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SAM ARCHITECTURE P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTRUCTION &General Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438107/05/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offINNOVATIVE CONSTRUCTION &12/26/2025
DOB NOWGeneral ConstructionSigned-offINNOVATIVE CONSTRUCTION &02/07/2024
DOB NOWGeneral ConstructionSigned-offINNOVATIVE CONSTRUCTION &04/24/2023
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/12/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)JAMES WILSONspecial
06/29/2022Concrete - Cast-In-PlaceJAMES WILSONspecial
06/29/2022Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
06/29/2022Subgrade InspectionsJAMES WILSONspecial
06/29/2022Subsurface Conditions – Fill Placement & In-Place DensityJAMES WILSONspecial
06/29/2022Deep Foundation ElementsJAMES WILSONspecial
06/20/2022FinalJAMES WILSONprogress
06/20/2022Footing and FoundationJAMES WILSONprogress
01/28/2021Energy Code ComplianceJoseph Menzerprogress
01/28/2021FinalJoseph Menzerprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00380340-I1Request digital key ↗
08/26/2026Q00462268-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026Q00462268-S1Request digital key ↗
08/26/2026Q00462268-S2Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00462268-S2Open ↗
09/01/2026Q00462268-S2Open ↗
09/01/2026Q00462268-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00462268-I1Open ↗
08/26/2026Q00462268-S1Open ↗
08/26/2026Q00462268-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00462268-S2Open ↗
09/01/2026Q00462268-S2Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026Q00462268-S2Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026Q00462268-I1Open ↗
08/13/2026Q00462268-S1Open ↗
08/13/2026Q00462268-S2Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
11/15/2007410028973Open ↗