Silver Tower 1
100 BLEECKER STREET · BIN 1083218
💬 Discuss this project
1967Year Built
30Stories
W6Building Class
C1-7Zoning
1,181,372 sfGross Floor Area
399Units
LL97 CoveredRent Stabilized42 Open Violations 39 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Other college and university · Owner of record: NEW YORK UNIVERSITY · 183,844 sf lot · 6.43 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingOther
Permit Issued — active, not yet Signed-off
Roof6p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 8 docs
Floor 15Under Construction21p · 2 filings · 20 docs
Floor 14
Floor 13Under Construction19p · 1 filing · 17 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 41p · 1 filing · 20 docs
Floor 3Under Construction8p · 1 filing · 15 docs
Floor 2
Floor 1
4 jobs · most recent 06/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/12/2026Permit IssuedHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
04/03/2026Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
08/27/2025Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
06/24/2025Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
16 jobs · most recent 09/14/2026
General Wiring Boiler Controls
FiledStatusContractorScope
09/14/2026Permit IssuedCONDUCTOR ELECL SVCS INCGeneral Wiring
07/22/2026Permit IssuedJUMPER ELECTRIC CORPGeneral Wiring
05/15/2026Pending PaymentGMC ELECTRICAL INCGeneral Wiring
01/22/2026CompleteJUMPER ELECTRIC CORPGeneral Wiring
06/10/2025CompleteGMC ELECTRICAL INCGeneral Wiring
04/17/2025CompleteMATROS AUTOMATED ELEC'L CGeneral Wiring
03/06/2025CompleteGMC ELECTRICAL INCGeneral Wiring
12/04/2023CompletePROSTO ELECTRIC CORPGeneral Wiring
10/17/2023Permit IssuedJAY UNITED ELECL CONTNG CBoiler Controls
01/12/2023CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
11/28/2022CompleteJUMPER ELECTRIC CORP—
03/24/2022CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
03/22/2022CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
03/01/2022CompleteTOP SHELF ELECTRIC CORP—
06/21/2021CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
1 job · most recent 08/11/2026
Concrete
FiledStatusContractorScope
08/11/2026——Concrete
1 job · most recent 08/27/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/27/2025Signed-offHUDSON PLMBING & MCH, LLCTenant Protection Plan 72 Hour
2 jobs · most recent 08/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2026Permit IssuedCOLLINS BUILDIN SVCS INCSuspended Scaffold (SC)
04/04/2025Permit IssuedCOLLINS BUILDIN SVCS INCSuspended Scaffold (SC)
Building Lifecycle
All (217)Filed (40)Permit Issued (36)Signed Off (23)Facade (FISP) (19)Violation (42)Inspection (25)Objection (2)Special Inspection (30)
09/16/2026
Permit issued — Plumbing
M01394781-S1-PL
09/15/2026
Permit issued — General Construction
M01394781-I1-GC
08/24/2026
Permit issued — Suspended Scaffold
M01429788-I1-SC
08/13/2026
Signed off — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01174302-I1
08/11/2026
Filed — Alteration
NYU Silver Towers, PIPS 1A Parking Garage repairs as per the plans filed including: Repair of spalled concrete, cracked concrete, and deteriorated reinforcement of parking structure ceiling.
M01420276-I1
08/11/2026
Filed — Alteration
Use of Suspended scaffold for window washing
M01429788-I1
08/10/2026
Signed off — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01174302-S1
07/22/2026
Signed off — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01200733-S1
07/22/2026
Signed off — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01200733-I1
06/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/22/2026
Special inspection requirement — Concrete - Cast-In-Place
06/22/2026
Special inspection requirement — Final
Paul Millman
06/12/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 3E & 15F AS PER PLAN. MODIFICATIONS TO DOORS, PARTITION, MILLWORK AND FLOOR. NO CHANGE IN OCCUPANCY, USE AND EGRESS.
M01394781-I1
06/12/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 3E & 15F AS PER PLAN. MODIFICATIONS TO DOORS, PARTITION, MILLWORK AND FLOOR. NO CHANGE IN OCCUPANCY, USE AND EGRESS.
M01394781-S1
05/13/2026
Signed off — Alteration
IRA Facade Inspection
M01378166-I1
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
05/11/2026
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
05/11/2026
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
05/11/2026
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
04/24/2026
Permit issued — Plumbing
M01332874-S1-PL
04/22/2026
Permit issued — General Construction
M01332874-I1-GC
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Signed off — Alteration
Plumbing modifications to existing apartments as per plans.
M01137165-S1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Permit issued — Plumbing
M01200733-S1-PL
04/03/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 3F & 15B AS PER PLAN. MODIFICATIONS TO DOORS, PARTITION, MILLWORK AND FLOOR. NO CHANGE IN OCCUPANCY, USE AND EGRESS.
M01332874-S1
04/03/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 3F & 15B AS PER PLAN. MODIFICATIONS TO DOORS, PARTITION, MILLWORK AND FLOOR. NO CHANGE IN OCCUPANCY, USE AND EGRESS.
M01332874-I1
03/31/2026
Permit issued — General Construction
M01200733-I1-GC
03/31/2026
Permit issued — Suspended Scaffold
M01378166-I1-SC
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
03/25/2026
Filed — Alteration
IRA Facade Inspection
M01378166-I1
10/15/2025
Permit issued — General Construction
M01174302-I1-GC
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2025
Signed off — Alteration
Plumbing modifications to existing apartments as per plans.
M01137165-I1
08/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2025
Filed — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01200733-S1
08/25/2025
Filed — Alteration
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
M01200733-I1
07/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2025
Violation issued (FDNY_ORDER, closed)
07/11/2025
Permit issued — Plumbing
M01174302-S1-PL
07/01/2025
Permit issued — General Construction
M01174302-I1-GC
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
06/24/2025
Filed — Alteration
Plumbing modifications to existing apartments as per plans.
M01137165-P1
Latest 60 of 217 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIVERSITY PLAZA NURSERY103/22/2026
BROSNA CONSTRUCTION GROUP103/22/2026
NYU503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH403/21/2026
BURNHAM NATIONWIDE INC2003/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
YAO W GUO ARCHITECT, PC1203/21/2026
CONVERSANO ASSOCIATES, INC.1403/21/2026
NEW YORK UNIVERSITY103/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROSNA CONSTRUCTION CORPOGeneral Contractor1509/16/2026
HUDSON PLMBING & MCH, LLCPlumbing809/17/2026
PJP INSTALLERS INCGeneral Contractor707/08/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor403/21/2026
DNA CONTRACTING LLCGeneral Contractor407/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
A W R GROUP INCGeneral Contractor203/21/2026
GOHDE, AUGUSTElectrical103/21/2026
LUPO, CIROElectrical103/21/2026
JAN VARJANElectrical103/21/2026
JUMPER ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC69421806/12/2026
RICHMOND TESTING LAB263206/10/2024
NAPACH ARCHITECTU2945101/12/2024
SKYLINE ENGINEERING, PLLC267307/13/2022
KLINE ENGINEERING, PC1007105/04/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC09/16/2026
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO09/15/2026
DOB NOWSuspended ScaffoldPermit IssuedCOLLINS BUILDIN SVCS INC08/24/2026
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC04/24/2026
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO04/22/2026
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC04/06/2026
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO03/31/2026
DOB NOWSuspended ScaffoldSigned-offSUPERSTARS CONTRACTING IN03/31/2026
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO10/15/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC07/11/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO07/01/2025
DOB NOWSuspended ScaffoldPermit IssuedCOLLINS BUILDIN SVCS INC05/29/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC03/20/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO03/14/2025
DOB NOWGeneral ConstructionPermit IssuedPAUL CHARLTON02/27/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC01/10/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO01/09/2025
DOB NOWGeneral ConstructionSigned-offA W R GROUP INC12/04/2024
DOB NOWGeneral ConstructionPermit IssuedPAUL CHARLTON10/29/2024
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC05/21/2024
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO01/31/2024
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/12/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/29/2023
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL11/27/2023
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON04/28/2023
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/17/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/28/2022
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL07/26/2022
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC03/21/2022
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO03/16/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/13/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC12/02/2021
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC07/20/2021
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO07/13/2021
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO07/12/2021
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON03/25/2021
BISOTISSUEDTURNER CONSTRUCTION COMPANY10/29/2020
BISOTISSUEDTURNER CONSTRUCTION COMPANY11/04/2019
BISOTISSUEDBROSNA CONSTRUCTION CORPO05/07/2019
BISOTISSUEDTURNER CONSTRUCTION COMPANY11/09/2018
+ 46 more permits on file
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
06/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2024Fail-Final Spot CheckFailView ↗
07/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/24/2026Tenant Protection Plan Compliance—special
06/22/2026FinalPaul Millmanprogress
06/22/2026Concrete - Cast-In-Place—special
05/13/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
05/11/2026Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
05/11/2026Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
05/11/2026Lighting controlsAILANTO DANIEL MINAWIenergy_progress
04/29/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/29/2026FinalAILANTO DANIEL MINAWIprogress
04/29/2026Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
04/29/2026Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
04/29/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/30/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/26/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
06/26/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/26/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/26/2025Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
06/26/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
06/26/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
06/26/2025FinalAILANTO DANIEL MINAWIprogress
06/26/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
06/26/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
06/19/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/17/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
03/25/2025Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
Latest 25 of 65.
▾Documents — 639 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch38
09/03/2026M00508424-I1Request digital key ↗
09/03/2026M00511991-I1Request digital key ↗
09/03/2026M00512000-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00454813-I1Request digital key ↗
▸Applications & Permits93
▸DOB NOWLPC Approval/Permit33
09/03/2026M00512000-I1Open ↗
08/26/2026M00932715-S1Open ↗
08/18/2026M01332874-I1Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION30
11/04/2019123467747Open ↗
05/10/2019123862301Open ↗
05/08/2019123862301Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
04/25/2023123567513Open ↗
04/14/2023123567513Open ↗
04/28/2022123567513Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/25/2023123567513Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/19/2016122458116Open ↗
▸Seals & Professional Certifications164
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
10/08/2019123862301Open ↗
10/08/2019123862301Open ↗
05/06/2019123862301Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/03/2026M00512000-I1Open ↗
09/02/2026M00638769-P2Open ↗
09/02/2026M00638769-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M01137165-I1Open ↗
09/02/2026M01137165-I1Open ↗
09/02/2026M01137165-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/02/2026M01137165-I1Open ↗
09/02/2026M01137165-I1Open ↗
09/02/2026M00951723-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
04/03/2019123862301Open ↗
09/13/2018123467747Open ↗
07/13/2018123477969Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
04/03/2019123862301Open ↗
11/09/2018123467747Open ↗
07/13/2018123477969Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
04/03/2019123862301Open ↗
05/24/2018123567513Open ↗
03/02/2017122196836Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/14/2018122192536Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
04/03/2019123862301Open ↗
07/13/2018123477969Open ↗
01/19/2017122997285Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos99
▸DOB NOWOER: Notice to Proceed27
09/03/2026M00512000-I1Open ↗
08/26/2026M00932715-S1Open ↗
08/18/2026M01332874-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWOER: Notice of Satisfaction26
09/03/2026M00512000-I1Open ↗
08/18/2026M01332874-I1Open ↗
08/18/2026M01332874-S1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form17
09/03/2026M00512000-I1Open ↗
09/02/2026M00724256-I1Open ↗
09/01/2026M00731522-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/31/2026M08046758-P1Open ↗
08/31/2026M08046758-I1Open ↗
08/28/2026M00951723-I1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
11/05/2018123467747Open ↗
06/28/2018123567513Open ↗
05/25/2017122956783Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
12/29/2021123567513Open ↗
05/26/2021123467747Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/05/2018123567513Open ↗
Showing 1 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
05/08/2019123862301Open ↗
01/19/2017122997285Open ↗
01/03/2017122956783Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
10/08/2019123862301Open ↗
10/08/2019123862301Open ↗
05/06/2019123862301Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/08/2019123862301Open ↗
06/13/2018122458116Open ↗
10/18/2017122997285Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/07/2022123567513Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/22/2022123567513Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/05/2018123567513Open ↗
06/13/2018122458116Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/22/2022123567513Open ↗
10/14/2020123467747Open ↗
▸BISMECHANICAL SYSTEMS1
09/22/2022123567513Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/05/2018123567513Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/07/2022123567513Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/11/2023123567513Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/07/2022123567513Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/13/2022123567513Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/13/2022123567513Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/07/2022123567513Open ↗
▸Approvals, Objections & Sign-offs91
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/03/2026M00512000-I1Open ↗
09/02/2026M00638769-P2Open ↗
09/02/2026M00638769-I1Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
05/11/2023123567513Open ↗
05/26/2021123467747Open ↗
10/08/2019123862301Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL14
10/04/2019123862301Open ↗
04/23/2019123862301Open ↗
11/09/2018123467747Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
10/08/2019123862301Open ↗
07/13/2018123477969Open ↗
06/14/2018122458116Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
04/12/2022123567513Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
09/22/2022123567513Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT27
10/08/2019123862301Open ↗
04/03/2019123862301Open ↗
09/13/2018123467747Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/02/2022123567513Open ↗
05/26/2021123467747Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET18
04/03/2019123862301Open ↗
09/13/2018123467747Open ↗
07/13/2018123477969Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM10
10/08/2019123862301Open ↗
10/04/2019123862301Open ↗
06/25/2018122458116Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
04/25/2023123567513Open ↗
09/28/2017122997285Open ↗
02/16/2017122458116Open ↗
Showing 3 of 7 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
07/14/2020123467747Open ↗
04/02/2019123862301Open ↗
09/14/2018123467747Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026M01076837-I1Open ↗
08/13/2026M00731522-P1Open ↗
08/13/2026M00932715-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations3
09/27/2026M01429788-I1Open ↗
08/13/2026M01043983-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
09/27/2026M01429788-I1Open ↗
Showing 1 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type