← Back
BuildNYC
Elevator cooperative
100 CO-OP CITY BOULEVARD
BRONX · Co-op City · BIN 2096810
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized4,925 Active Violations 4,919 unresolved · 6 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Riverbay · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacades and roof construction1 filing
Floor 1EXO INDUSTRIES CORP temporary chain link fence installation2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay3803/22/2026
E-Z Permit NY903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers208/04/2021
Merritt Engineering Consultants102/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hovann203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exo IndustriesScaffold603/21/2026
Exo IndustriesGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Merritt Engineering Consulting460102/05/2021
Building Lifecycle
All (82)Filed (3)Permit Issued (3)Signed Off (3)Facade (FISP) (13)Violation (60)
08/16/2025
Violation issued (HPD, open)
B
08/16/2025
Violation issued (HPD, open)
A
08/16/2025
Violation issued (HPD, open)
A
08/16/2025
Violation issued (HPD, closed)
B
08/16/2025
Violation issued (HPD, closed)
A
08/16/2025
Violation issued (HPD, closed)
B
08/16/2025
Violation issued (HPD, open)
B
11/25/2024
Violation issued (HPD, closed)
I
10/22/2024
Violation issued (HPD, open)
B
10/22/2024
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
01/09/2024
Violation issued (HPD, open)
B
01/09/2024
Violation issued (HPD, open)
B
01/09/2024
Violation issued (HPD, open)
A
01/09/2024
Violation issued (HPD, open)
B
01/09/2024
Violation issued (HPD, open)
B
01/03/2024
Violation issued (HPD, open)
A
12/27/2023
Violation issued (HPD, open)
A
12/27/2023
Violation issued (HPD, open)
A
12/27/2023
Violation issued (HPD, open)
A
12/27/2023
Violation issued (HPD, open)
A
09/12/2023
Violation issued (HPD, open)
B
09/12/2023
Violation issued (HPD, open)
B
04/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00563290-I1
04/28/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00471192-I1
03/28/2023
Cycle 9 facade report submitted
03/20/2023
Cycle 9 facade report signed — SAFE
03/10/2023
Cycle 9 facade inspection completed
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
01/05/2022
Signed off — Alteration
X00461468-I1
09/28/2021
Violation issued (HPD, open)
B
08/05/2021
Permit issued — Construction Fence
X00563290-I1-FN
08/04/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00563290-I1
05/01/2021
Permit issued — General Construction
X00461468-I1-GC
04/16/2021
Violation issued (HPD, closed)
A
03/08/2021
Permit issued — Sidewalk Shed
X00471192-I1-SH
03/05/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00471192-I1
02/05/2021
Filed — Alteration
X00461468-I1
08/13/2020
Violation issued (HPD, open)
C
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, open)
C
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, open)
B
09/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/10/2019
Violation issued (HPD, closed)
A
09/10/2019
Violation issued (HPD, open)
B
09/10/2019
Violation issued (HPD, open)
B
09/10/2019
Violation issued (HPD, closed)
A
07/22/2019
Violation issued (HPD, open)
A
07/22/2019
Violation issued (HPD, open)
A
07/22/2019
Violation issued (HPD, open)
A
06/30/2019
Violation issued (HPD, open)
B
06/30/2019
Violation issued (HPD, closed)
A
06/30/2019
Violation issued (HPD, open)
A
06/13/2019
Cycle 8 facade report signed — SWARMP
05/31/2019
Cycle 8 facade inspection completed
02/21/2019
Cycle 8 facade report submitted
02/21/2019
Violation issued (HPD, open)
A
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offExo Industries08/05/2021
DOB NOWGeneral ConstructionSigned-offExo Industries05/01/2021
DOB NOWSidewalk ShedSigned-offExo Industries03/08/2021
BISOTISSUEDDurablis Solutions09/15/2021
BISOTISSUEDDurablis Solutions10/02/2020
BISOTISSUEDProto Construction03/16/2007
BISEQISSUEDProto Construction & Development03/08/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDProto Construction & Development04/11/2006
BISOTISSUEDProto Construction03/14/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay02/08/2005
BISEQISSUEDRiverbay02/08/2005
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay02/26/2003
BISEQISSUEDRiverbay02/26/2003
BISEQISSUEDRiverbay08/15/2002
BISEQISSUEDRiverbay08/15/2002
BISSDISSUEDGino's PLG & Heating03/11/2002
BISSDISSUEDHigraban12/01/2001
BISSDISSUEDHigraban12/01/2001
BISPLISSUEDHigraban09/21/2001
BISMHISSUEDNab Construction05/22/1998
BISOTISSUEDNab Construction04/29/1997
BISOTISSUEDInterstate Industrial04/16/1997
BISOTISSUEDInterstate Industrial01/07/1997
BISOTISSUEDNab Construction04/29/1996
BISMHISSUEDNab Construction04/26/1996
BISSDISSUEDF&V Mechanical Plumbing & Heating01/25/1996
BISPLISSUEDF&V Mechanical Plumbing & Heating01/25/1996
BISOTISSUEDNab Construction09/18/1995
BISPLISSUEDF&V Mechanical Plumbing & Heating09/18/1995
4 projects · most recent 03/08/2021
General Wiring
FiledStatusContractorScope
03/08/2021Permit IssuedRichard Neu—
09/30/2020Permit IssuedJoseph Weinstein ElectricGeneral Wiring
10/31/2019Permit IssuedStar Electrical Contractors—
05/30/2019Permit IssuedStar Electrical Contractors—
Nothing on file for this building.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00471192-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026X00563290-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00461468-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
09/22/2022240283965Open ↗
09/13/2022240283965Open ↗
08/28/2020240283965Open ↗
▸BISWORK PERMIT APPLICATION2
09/17/2021240283965Open ↗
10/02/2020240283965Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00461468-I1Open ↗
08/25/2026X00471192-I1Open ↗
08/25/2026X00563290-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/28/2020240283965Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/28/2020240283965Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/28/2020240283965Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/28/2020240283965Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026X00461468-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
10/31/2023240283965Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/28/2020240283965Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00461468-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/31/2023240283965Open ↗
10/02/2020240283965Open ↗
08/28/2020240283965Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/31/2023240283965Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/31/2023240283965Open ↗
08/28/2020240283965Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/28/2020240283965Open ↗
▸BISADDITIONAL INFORMATION1
09/22/2022240283965Open ↗