← Back
Primarily 3 family with 1 store or office
100 DEKALB AVENUE
BROOKLYN · BIN 3058603
💬 Discuss this project
1925Year Built
4Stories
S3Building Class
C6-4Zoning
4,046 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 100 DK L.L.C. · 1,400 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
Roof1p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
100 DEKALB1007/08/2026
100 DK L.L.C.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2023$3.8M—100 DEKALB LLC → 100 DK L.L.C.$939/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANCORA ENGINEERING, PLLC204/19/2023
CHRISTOPHER COMPTON102/24/2023
URBAN ENGINEERING, PC106/08/2022
WSP111/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.303/21/2026
URBAN ENGINEERING, PC203/21/2026
ECC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAL ENVIRONMENTAL SAFETYGeneral Contractor707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANCORA ENGINEERING, PLLC6818304/19/2023
Building Lifecycle
All (26)Filed (5)Permit Issued (4)Signed Off (4)Violation (8)Special Inspection (5)
05/04/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/09/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
06/12/2023
Signed off — Alteration
B00616137-I1
06/09/2023
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS WALLS AT 4 STORY STRUCTURE PRIOR TO FULL BUILDING DEMOLITION UNDER SEPARATE DOB APPLICATION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B00830096-I1
06/07/2023
Signed off — Alteration
B00845433-I1
06/07/2023
Signed off — Alteration
B00583459-I1
04/22/2023
Permit issued — Structural
B00845433-I1-GC-CX
04/19/2023
Filed — Alteration
B00845433-I1
03/22/2023
Violation issued (HPD, closed)
A
03/16/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Gregory Moormann
03/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
03/16/2023
Special inspection requirement — Final
James Patterson
02/28/2023
Permit issued — General Construction
B00830096-I1-GC
02/24/2023
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS WALLS AT 4 STORY STRUCTURE PRIOR TO FULL BUILDING DEMOLITION UNDER SEPARATE DOB APPLICATION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B00830096-I1
06/08/2022
Filed — Alteration
Partial Demolition of existing three story rear extension floors and roof.
B00677156-I1
03/09/2022
Permit issued — General Construction
B00616137-I1-GC
02/24/2022
Violation issued (HPD, closed)
A
02/16/2022
Permit issued — General Construction
B00583459-I1-GC-CX
02/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
02/09/2022
Special inspection requirement — Final
Gregory Moormann
11/18/2021
Filed — Alteration
B00616137-I1
11/15/2021
Filed — Alteration
B00583459-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPAL ENVIRONMENTAL SAFETY04/22/2023
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY02/28/2023
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY03/09/2022
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY02/16/2022
BISEQISSUEDSAL MUSSO GENERAL CONTRACTOR03/21/1997
BISPLISSUEDR&A HEATING & CONTRG CO.I02/12/1997
BISFPISSUEDIDEAL FIRE CONTROL11/07/1996
BISPLISSUEDR&A HEATING & CONTRG CO.I07/10/1996
BISOTISSUEDD/B/A SAL'S CARPENTRY06/28/1996
1 project · most recent 06/08/2022
FiledStatusContractorScope
06/08/2022——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/16/2023Construction Operations Influencing Adjacent StructuresGregory Moormannspecial
03/16/2023Structural Stability – Alterations of existing buildingsGregory Moormannspecial
03/16/2023FinalJames Pattersonprogress
02/09/2022Structural Stability – Alterations of existing buildingsGregory Moormannspecial
02/09/2022FinalGregory Moormannprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00583459-I1Request digital key ↗
08/31/2026B00616137-I1Request digital key ↗
08/29/2026B00677156-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00583459-I1Open ↗
08/31/2026B00616137-I1Open ↗
08/27/2026B00845433-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B00845433-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00845433-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00830096-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026B00845433-I1Open ↗