← Back
BuildNYC
Elevator cooperative
Coop City
100 DONIZETTI PLACE · Co-op City · BIN 2095390
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized4,925 Active Violations 4,919 unresolved · 6 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Riverbay · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and balcony restoration1 filing
Floor 1EXO INDUSTRIES CORP temporary chain link fence installation2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay3807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Merritt Engineering Consultants104/22/2022
Enthink Engineers104/15/2022
Mje Professional Services112/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exo IndustriesScaffold607/08/2026
Exo IndustriesGeneral Contractor207/08/2026
Star Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Merritt Engineering Consulting460104/22/2022
Building Lifecycle
All (85)Filed (3)Permit Issued (6)Signed Off (3)Facade (FISP) (13)Violation (60)
08/20/2025
Violation issued (HPD, closed)
C
07/25/2025
Violation issued (ECB, closed)
Elevators
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
02/16/2024
Cycle 9 facade report submitted
02/14/2024
Cycle 9 facade report signed — SAFE
02/09/2024
Signed off — Alteration
X00618975-I1
02/09/2024
Cycle 9 facade inspection completed
02/09/2024
Violation issued (HPD, open)
B
02/07/2024
Signed off — Alteration
X00716711-I1
02/07/2024
Signed off — Alteration
X00649155-I1
10/18/2023
Violation issued (HPD, open)
C
10/18/2023
Violation issued (HPD, open)
B
10/18/2023
Violation issued (HPD, open)
B
10/18/2023
Violation issued (HPD, open)
B
06/14/2023
Permit issued — General Construction
X00618975-I1-GC
04/05/2023
Permit issued — Construction Fence
X00716711-I1-FN
01/20/2023
Permit issued — Sidewalk Shed
X00649155-I1-SH
08/19/2022
Violation issued (HPD, open)
B
07/07/2022
Permit issued — General Construction
X00618975-I1-GC
04/22/2022
Filed — Alteration
X00618975-I1
04/15/2022
Filed — Alteration
X00716711-I1
04/15/2022
Permit issued — Construction Fence
X00716711-I1-FN
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
12/29/2021
Permit issued — Sidewalk Shed
X00649155-I1-SH
12/28/2021
Filed — Alteration
X00649155-I1
04/16/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, open)
C
04/01/2021
Violation issued (HPD, open)
B
04/01/2021
Violation issued (HPD, closed)
A
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, open)
A
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, open)
A
08/13/2020
Violation issued (HPD, open)
A
08/13/2020
Violation issued (HPD, open)
A
08/13/2020
Violation issued (HPD, open)
A
08/13/2020
Violation issued (HPD, closed)
A
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, closed)
A
08/13/2020
Violation issued (HPD, open)
B
08/13/2020
Violation issued (HPD, closed)
A
12/30/2019
Violation issued (HPD, open)
B
12/30/2019
Violation issued (HPD, open)
B
12/30/2019
Violation issued (HPD, open)
A
09/28/2019
Violation issued (HPD, open)
A
09/28/2019
Violation issued (HPD, open)
A
09/28/2019
Violation issued (HPD, open)
A
09/28/2019
Violation issued (HPD, open)
A
09/28/2019
Violation issued (HPD, open)
A
02/21/2019
Cycle 8 facade report submitted
01/18/2019
Cycle 8 facade inspection completed
12/30/2018
Cycle 8 facade report signed — SWARMP
10/24/2018
Violation issued (HPD, closed)
I
04/04/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/25/2018
Violation issued (HPD, open)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offExo Industries06/14/2023
DOB NOWConstruction FenceSigned-offExo Industries04/05/2023
DOB NOWSidewalk ShedSigned-offExo Industries01/20/2023
DOB NOWGeneral ConstructionSigned-offExo Industries07/07/2022
DOB NOWConstruction FenceSigned-offExo Industries04/15/2022
DOB NOWSidewalk ShedSigned-offExo Industries12/29/2021
BISEQISSUEDProto Construction & Development05/10/2008
BISEQISSUEDRiverbay03/17/2008
BISOTISSUEDProto Constructiin & Development01/28/2008
BISEQISSUEDRiverbay01/18/2008
BISOTISSUEDProto Constructiin & Development03/16/2007
BISEQISSUEDProto Construction & Development03/08/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/29/2007
BISOTISSUED¢Roto Constructiin & Development03/03/2006
BISEQISSUEDProto Construction & Development02/28/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDProto Construction & Development07/22/2005
BISEQISSUEDRiverbay01/04/2005
BISEQISSUEDRiverbay01/04/2005
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay02/24/2003
BISEQISSUEDRiverbay02/24/2003
BISEQISSUEDRiverbay08/27/2002
BISMHISSUEDNab Construction04/29/1997
BISOTISSUEDNab Construction10/07/1996
BISEQISSUEDRegional Scaffold and Hoisting04/07/1992
4 projects · most recent 02/08/2022
FiledStatusContractorScope
02/08/2022Permit IssuedStar Electrical Contractors—
02/07/2022Permit IssuedStar Electrical Contractors—
12/28/2021CompleteRichard Neu—
11/01/2018CompleteStar Electrical Contractors—
Nothing on file for this building.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026X00649155-I1Request digital key ↗
08/24/2026X00716711-I1Request digital key ↗
08/24/2026X00618975-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00716711-I1Open ↗
08/24/2026X00618975-I1Open ↗
08/13/2026X00649155-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00618975-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00618975-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00716711-I1Open ↗
08/13/2026X00649155-I1Open ↗