ECB10/20/2018Failure to maintain building in a code compliant manner. Work w/o a permit-sidewalk curb at side of property (EXP4) cut so that portions of sidewalk is lowered enabling a vehicle to drive onto an illegal off stNothing owed — awaiting certificate of correction
ECB05/04/2018Work without permit. At rear of premises erected 8' high fence. Combustible wood stage approx. 12' x 8' x 2' and combustible bar with wood frame canopy attached to building. No permits on file. Rem: obtain permNothing owed — awaiting certificate of correction
ECB04/19/2011Installation of plumbing materials per pc 102.3 27-902 after gaining access to restaurant observed in ktcn area sink connection left of stove was connected using pvc pipe not aloud in commercial also no vent seNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 2,300 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued1 filing
▾Design Consultants (Architect / Engineer of Record)