One family attached or semi-detached
100 MONAHAN AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5175393
💬 Discuss this project
2024Year Built
2Stories
A5Building Class
R3-1Zoning
1,383 sfGross Floor Area
1Units
One family attached or semi-detached · 2,323 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 211p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Basement11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT408/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor603/21/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264103/17/2023
Building Lifecycle
All (45)Filed (4)Permit Issued (5)Signed Off (2)Inspection (8)Special Inspection (26)
01/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2024
Signed off — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-S2
09/05/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2024
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-P1
08/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2024
Signed off — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-S1
07/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2024
Permit issued — Structural
S00844146-I1-GC-CX
03/04/2024
Permit issued — Plumbing
S00844146-S2-PL
12/12/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/22/2023
Permit issued — Plumbing
S00844146-S2-PL
08/02/2023
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-S2
06/28/2023
Permit issued — Curb Cut
S00844146-S1-CC
06/14/2023
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-S1
05/08/2023
Permit issued — General Construction
S00844146-I1-GC-CX
03/17/2023
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00844146-I1
03/17/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
03/16/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
03/14/2023
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
03/14/2023
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
03/14/2023
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC05/07/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/22/2023
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC06/28/2023
DOB NOWGeneral ConstructionPermit IssuedWALLACE AVENUE CONSTR LLC05/08/2023
1 project · most recent 03/03/2024
General Wiring
FiledStatusContractorScope
03/03/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
03/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
03/16/2023Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
03/16/2023Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
03/16/2023Subgrade InspectionsWILLIAM DURDEN, P.E.special
03/16/2023Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
03/16/2023Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
03/16/2023Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
03/16/2023Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
03/16/2023Fenestration areasWILLIAM DURDEN, P.E.energy_progress
03/16/2023Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
03/16/2023Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
03/16/2023Structural Wood FrameWILLIAM DURDEN, P.E.progress
03/16/2023HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
03/16/2023Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
03/16/2023Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
03/16/2023Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
03/16/2023Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
03/16/2023Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
03/16/2023Maintenance informationWILLIAM DURDEN, P.E.energy_progress
03/16/2023HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
03/16/2023HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
03/16/2023Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
03/16/2023Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
03/14/2023FinalWILLIAM DURDEN, P.E.progress
03/14/2023Footing and FoundationWILLIAM DURDEN, P.E.progress
Latest 25 of 26.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026S00844146-I1Request digital key ↗
08/22/2026S00844146-S2Request digital key ↗
08/22/2026S00844146-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00844146-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00844146-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00844146-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026S00844146-I1Open ↗
08/22/2026S00844146-S2Open ↗
08/22/2026S00844146-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026S00844146-I1Open ↗
08/24/2026S00844146-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S00844146-I1Open ↗
08/24/2026S00844146-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00844146-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00844146-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/22/2026S00844146-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00844146-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00844146-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00844146-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00844146-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00844146-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/22/2026S00844146-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00844146-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00844146-I1Open ↗