← Back
BuildNYC
Two stories - detached, small or mid-size
100 MONTGOMERY AVENUE
STATEN ISLAND · BIN 5000279
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R5Zoning
1,160 sfGross Floor Area
1Units
9 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,125 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorTemporary construction fence1p · 1 filing · 2 docs
Filed — no permit issued25p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 Brook St Property609/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Baalbaki & Associates Engineering204/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A Inspections203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D. Alpha ConstructionScaffold303/21/2026
Building Lifecycle
09/19/2026
Objection resolved — Addressed
09/15/2026
Objection raised — Cost
08/18/2026
Objection resolved — Addressed
08/18/2026
Special inspection requirement — Metering
08/18/2026
Special inspection requirement — Maintenance information
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedA.D. Alpha Construction01/08/2026
1 project · most recent 04/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/24/2026——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 04/24/2026
Wood
FiledStatusContractorScope
04/24/2026——Wood
1 project · most recent 11/05/2025
Fence
FiledStatusContractorScope
11/05/2025Permit IssuedA.D. Alpha ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/18/2026Metering—energy_progress
08/18/2026Maintenance information—energy_progress
08/18/2026Interior lighting power—energy_progress
04/20/2026Subgrade Inspections—special
04/20/2026Fire-Resistance Rated Construction—progress
04/20/2026Energy Code Compliance Inspections—progress
04/20/2026Insulation placement and R values—energy_progress
04/20/2026Concrete - Cast-In-Place—special
04/20/2026Fire-Resistant Penetrations and Joints—special
04/20/2026HVAC-R and service water piping design and insulation—energy_progress
04/20/2026Ventilation and air distribution system—energy_progress
04/20/2026Structural Stability – Alterations of existing buildings—special
04/20/2026Air barrier — testing —energy_progress
04/20/2026Air barrier - visual inspection—energy_progress
04/20/2026Fenestration and door U-factor and product ratings—energy_progress
04/20/2026HVAC-R and service water heating system controls—energy_progress
04/20/2026Fenestration areas—energy_progress
04/20/2026Permanent certificate—energy_progress
04/20/2026Fenestration air leakage—energy_progress
04/20/2026HVAC-R and service water heating equipment—energy_progress
04/02/2026Footing and Foundation—progress
04/02/2026Mechanical Systems—special
04/02/2026Final—progress
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account