100 OVERLOOK TERRACE
MANHATTAN · BIN 1064452
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R7-2Zoning
142,470 sfGross Floor Area
172Units
LL97 CoveredRent Stabilized8 Active Violations 6 unresolved · 2 paperwork only 2 likely answered ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Overlook Towers · 56,450 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBlue Woods Management2p · 1 filing · 3 docs
Floor 7Unit 722, Unit 7234p · 2 filings · 7 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Blue Woods Management Group, INC.Under Construction1 filing · 3 docs
Floor 1Blue Woods Management Group, INC.Under Construction7p · 4 filings · 12 docs
CellarBlue Woods Management Group, INC.Under Construction2p · 1 filing · 3 docs
Sub-CellarBlue Woods Management6p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Overlook Towers5703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Conlon Engineering201/10/2025
KMB Design Group110/10/2022
Kimoy Studios Architecture208/25/2021
Enthink Engineers208/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rimkus New York403/21/2026
Construction Permit Services103/21/2026
Hierarch-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Two-Tone ContractingGeneral Contractor307/08/2026
Neuehaus StudiosGeneral Contractor303/21/2026
Bask Construction ServicesScaffold207/08/2026
Perspective General ConstructionScaffold207/08/2026
TristruxGeneral Contractor203/21/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
Approved ElectricElectrical103/21/2026
Patrick ConlonGeneral Contractor103/21/2026
RPJ ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chen Engineering Services1826101/10/2025
Conlon Engineering4722301/10/2025
KMB Design Group513110/10/2022
Kimoy Studios3572208/25/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
06/15/2026
Elevator Category 1 inspection report filed
06/12/2026
Co-op apartment 224 sold for $480,150
04/17/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/30/2026
Elevator Category 5 inspection report filed
244 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting03/17/2026
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting03/27/2025
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting02/06/2024
DOB NOWStructuralSigned-offTwo-Tone Contracting12/12/2023
DOB NOWPlumbingSigned-offAqua Plumbing & Heating05/17/2023
DOB NOWAntennaSigned-offTristrux12/05/2022
DOB NOWSidewalk ShedSigned-offPerspective General Construction06/20/2022
DOB NOWGeneral ConstructionSigned-offNeuehaus Studios10/21/2021
DOB NOWSidewalk ShedSigned-offPerspective General Construction04/08/2021
DOB NOWSupported ScaffoldSigned-offBask Construction Service08/14/2020
DOB NOWSidewalk ShedSigned-offBask Construction Service06/17/2020
BISOTISSUEDBest Energy Power 201504/24/2024
BISPLISSUEDG.bassolino Plumbing04/23/2024
BISOTISSUEDBest Energy Power 201509/29/2023
BISOTISSUEDTraditional Waterproofing12/30/2022
BISOTISSUEDTraditional Waterproofing12/30/2021
BISPLISSUEDWard Plumbing01/22/2021
BISOTISSUEDTraditional Waterproofing12/30/2020
BISOTISSUEDTraditional Waterproofing08/03/2020
BISPLISSUEDWard Plumbing07/06/2020
BISMHISSUEDCesmic05/23/2019
BISOTISSUEDAggressive Heating05/22/2019
BISPLISSUEDApollo Plumbing & Heating09/25/2018
BISOTISSUEDA & B Contracting08/13/2018
BISPLISSUEDPremier Flow Plumbing and Heating04/30/2018
BISOTISSUEDABC Interior Exterior Services04/17/2018
BISOTISSUEDSteel Tone Construction06/01/2017
BISPLISSUEDWard Plumbing01/04/2017
BISPLISSUEDWard Plumbing11/01/2016
BISOTISSUEDRomo Construction09/28/2016
BISBLISSUEDAggressive Heating08/15/2016
BISPLISSUEDWard Plumbing10/08/2015
BISOTISSUEDAggressive Heating10/08/2015
BISEQISSUEDBrenmac08/21/2015
BISOTISSUEDRomo Construction04/22/2015
BISOTISSUEDRomo Construction03/09/2015
BISEQISSUEDRock Group NY08/12/2013
BISOTISSUEDAwr Group07/17/2013
BISOTISSUEDMZZ Waldolowski04/09/2013
BISPLISSUEDA.M.N01/23/2013
+ 21 more permits on file
10 projects · most recent 11/06/2026
General Wiring
FiledStatusContractorScope
11/06/2026CompleteA & S Master Electrical—
03/04/2024CompleteBertram Electric Contng—
12/14/2023CompleteCRM ElectricGeneral Wiring
08/31/2023CompleteJem Electrical ContractingGeneral Wiring
04/01/2023CompleteCRM ElectricGeneral Wiring
03/07/2023CompleteLeone Electric Co—
08/11/2020CompleteMontgomery Electrical ContractingGeneral Wiring
07/30/2020Permit IssuedAgir Electl SolutionGeneral Wiring
07/08/2020CompleteRichard Neu—
07/17/2018CompleteDenmar ElectricGeneral Wiring
1 project · most recent 11/08/2023
Steel
FiledStatusContractorScope
11/08/2023Signed-offTwo-Tone ContractingSteel
1 project · most recent 02/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/05/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/29/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/17/2023Structural Stability – Alterations of existing buildingsPATRICK CONLONspecial
10/17/2023Structural Steel - DetailsPATRICK CONLONspecial
10/17/2023Structural Steel - High Strength BoltingPATRICK CONLONspecial
10/17/2023Structural Steel - WeldingPATRICK CONLONspecial
10/17/2023Tenant Protection Plan CompliancePATRICK CONLONspecial
10/17/2023FinalPATRICK CONLONprogress
414 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account