Silver Center / Main Building
100 WASHINGTON SQUARE EAST · Greenwich Village · BIN 1008820
💬 Discuss this project
1900Year Built
10Stories
W6Building Class
R7-2Zoning
180,000 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Other college and university · Owner of record: New York University · 17,859 sf lot · 10.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNew York University2 filings
RoofNew York UniversityUnder Construction20p · 10 filings · 17 docs
Floor 12New York University1 filing · 16 docs
Floor 11New York University5p · 7 filings · 11 docs
Floor 10New York UniversityUnder Construction16p · 14 filings · 17 docs
Floor 9New York UniversityUnder Construction19p · 14 filings · 17 docs
Floor 8New York University2p · 3 filings · 9 docs
Floor 7
Floor 6
Floor 5New York University2p · 1 filing · 7 docs
Floor 4
Floor 3
Floor 2
Floor 1New York UniversityUnder Construction2 filings · 15 docs
CellarNew York University, Nyu Silver Science ComplexUnder Construction6p · 5 filings · 15 docs
BasementNew York UniversityUnder Construction1p · 1 filing · 15 docs
Sub-BasementNew York UniversityUnder Construction1p · 1 filing · 15 docs
Site & exteriorNew York UniversityUnder Construction6 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York University28910/20/2026
NYU703/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec3603/21/2026
Superstructures Engineering + Architects403/21/2026
New York University603/21/2026
AE Design Solution803/21/2026
Burnham Nationwide4303/21/2026
Cornerstone Consulting103/21/2026
Codegreen303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gilbane Building CompanyGeneral Contractor2606/28/2026
DNA ContractingGeneral Contractor1307/08/2026
PJP InstallersScaffold1107/08/2026
Power CoolingGeneral Contractor904/09/2026
PRP Mechanical ContractorGeneral Contractor507/08/2026
Beyond CoolingGeneral Contractor410/20/2026
Brosna ConstructionGeneral Contractor403/21/2026
Eagle Scaffolding ServicesScaffold307/08/2026
Penguin Maintenance & ServicesGeneral Contractor303/21/2026
Alliance PlumbingPlumbing307/08/2026
Welkin Fire ProtectionFire Protection207/08/2026
DNA ContractingScaffold204/09/2026
Cardoza PlumbingPlumbing207/08/2026
Manengeering BureauFire Protection207/08/2026
Smart Plumbing & HeatingPlumbing207/08/2026
247 ElectricalElectrical203/21/2026
Jam ElectricalElectrical203/21/2026
SPK/Lewis ConstructionGeneral Contractor107/08/2026
East Coast MechanicalPlumbing107/08/2026
Hugh O'Kane Electric CoElectrical103/22/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Roberts Electric CoElectrical103/21/2026
Archer Consultants GroupFire Protection107/08/2026
Delta Star ElectricElectrical103/21/2026
N.Y. UniversityElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD Engineering9859210/09/2026
McHenery Testing Lab9181110/06/2026
Richmond Testing Lab2631205/22/2026
Kline Engineering10072105/27/2025
Cole Technologies/Control1290405/02/2025
Alan Margolin & Associates423304/15/2024
Skyline Engineering267211/01/2023
360 Engineering7496105/16/2022
Atlas ATC Engineering8011504/19/2022
Building Lifecycle
All (294)Filed (72)Permit Issued (70)Signed Off (25)Facade (FISP) (11)Violation (60)Inspection (18)Objection (8)Special Inspection (30)
10/19/2026
Permit issued — Mechanical Systems
M01401630-I1-MS
10/09/2026
Filed — Alteration
INSTALL NEW SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01401630-I1
10/06/2026
Filed — Alteration
M01466277-S4
10/06/2026
Filed — Alteration
M01466277-S3
10/06/2026
Filed — Alteration
M01466277-S1
10/05/2026
Filed — Alteration
M01466277-S2
10/05/2026
Filed — Alteration
M01466277-I1
10/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
10/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/28/2026
Special inspection requirement — Final
09/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/28/2026
Special inspection requirement — Final
09/28/2026
Special inspection requirement — Energy Code Compliance Inspections
09/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/28/2026
Special inspection requirement — Structural Steel - Welding
09/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/28/2026
Special inspection requirement — Shutoff dampers
09/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/28/2026
Special inspection requirement — Lighting controls
09/28/2026
Special inspection requirement — Energy Code Compliance Inspections
09/28/2026
Special inspection requirement — Post-installed Anchors
09/28/2026
Special inspection requirement — Structural Steel - Details
09/28/2026
Special inspection requirement — Sprinkler Systems
09/28/2026
Special inspection requirement — Interior lighting power
09/28/2026
Special inspection requirement — Mechanical Systems
09/28/2026
Special inspection requirement — Maintenance information
09/28/2026
Special inspection requirement — Concrete - Cast-In-Place
09/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/28/2026
Special inspection requirement — Post-installed Anchors
09/28/2026
Special inspection requirement — Post-installed Anchors
09/28/2026
Special inspection requirement — Final
09/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/28/2026
Special inspection requirement — Sprayed fire-resistant materials
08/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2026
Objection resolved — Open
08/03/2026
Objection resolved — Open
06/25/2026
Permit issued — Mechanical Systems
M00668205-I1-MS
06/25/2026
Permit issued — Structural
M00606615-I1-ST
06/23/2026
Permit issued — General Construction
M00660277-I1-GC
06/17/2026
Objection raised — Energy
06/17/2026
Objection raised — Mechanical
05/22/2026
Filed — Alteration
Installation of rated enclosure to an existing gas service line in the rear yard of the property , as per plans.
M01378117-I1
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Permit issued — Sprinklers
M00668433-I1-EW-SP
03/17/2026
Signed off — Alteration
Remove existing pitched skylight system and replace with new steel beams & composite steel floor slabs at roof level as per the Structural plans filed.
M00705811-I1
03/17/2026
Permit issued — General Construction
M00943301-I1-ST
01/27/2026
Signed off — Alteration
INSTALL NEW A/C UNIT, NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01305739-I1
01/12/2026
Signed off — Alteration
Filing herewith application for vault repair as per plans submitted.
M00943301-S1
12/24/2025
Permit issued — Structural
M00606615-I1-ST
12/23/2025
Permit issued — Mechanical Systems
M00668205-I1-MS
12/23/2025
Permit issued — General Construction
M00660277-I1-GC
10/29/2025
Signed off — Alteration
M08006724-I1
10/28/2025
Signed off — Alteration
replacement of vivarium air handling units at roof servicing 11th floor with associated duct and piping work
M00606602-I1
10/28/2025
Permit issued — Mechanical Systems
M01305739-I1-MS
10/23/2025
Filed — Alteration
INSTALL NEW A/C UNIT, NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01305739-I1
Latest 60 of 294 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBeyond Cooling10/19/2026
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company06/25/2026
DOB NOWStructuralPermit IssuedGilbane Building Company06/25/2026
DOB NOWGeneral ConstructionPermit IssuedGilbane Building Company06/23/2026
DOB NOWSprinklersPermit IssuedArcher Consultants Group04/21/2026
DOB NOWGeneral ConstructionPermit IssuedPaul Charlton03/17/2026
DOB NOWStructuralPermit IssuedGilbane Building Company12/24/2025
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company12/23/2025
DOB NOWGeneral ConstructionPermit IssuedGilbane Building Company12/23/2025
DOB NOWMechanical SystemsSigned-offBeyond Cooling10/28/2025
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company06/23/2025
DOB NOWStructuralPermit IssuedGilbane Building Company06/23/2025
DOB NOWGeneral ConstructionPermit IssuedGilbane Building Company06/23/2025
DOB NOWGeneral ConstructionPermit IssuedPaul Charlton05/07/2025
DOB NOWGeneral ConstructionPermit IssuedPaul Charlton02/27/2025
DOB NOWConstruction FenceSigned-offPaul Charlton02/27/2025
DOB NOWGeneral ConstructionSigned-offPaul Charlton02/27/2025
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe01/10/2025
DOB NOWGeneral ConstructionPermit IssuedGilbane Building Company09/20/2024
DOB NOWStructuralPermit IssuedGilbane Building Company06/28/2024
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company06/28/2024
DOB NOWSupported ScaffoldSigned-offEagle Scaffolding Services06/24/2024
DOB NOWConstruction FenceSigned-offPaul Charlton04/11/2024
DOB NOWMechanical SystemsSigned-offPower Cooling04/10/2024
DOB NOWBoiler EquipmentSigned-offSmart Plumbing & Heating04/10/2024
DOB NOWSupported ScaffoldSigned-offEagle Scaffolding Services03/28/2024
DOB NOWGeneral ConstructionPermit IssuedPaul Charlton03/27/2024
DOB NOWPlumbingSigned-offSmart Plumbing & Heating03/08/2024
DOB NOWGeneral ConstructionSigned-offPaul Charlton03/01/2024
DOB NOWStructuralSigned-offBrosna Construction12/14/2023
DOB NOWGeneral ConstructionSigned-offBrosna Construction11/17/2023
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company09/25/2023
DOB NOWGeneral ConstructionPermit IssuedGilbane Building Company09/25/2023
DOB NOWStructuralPermit IssuedGilbane Building Company09/25/2023
DOB NOWSprinklersPermit IssuedManengeering Bureau08/17/2023
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe07/28/2023
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe07/28/2023
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction06/13/2023
DOB NOWSprinklersSigned-offAggressive Fire Protection06/13/2023
DOB NOWPlumbingSigned-offCardoza Plumbing06/13/2023
+ 60 more permits on file
2 projects · most recent 10/09/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/09/2026Permit IssuedBeyond CoolingHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUZ-AH24NL 24,000 BTU · Heat Pump Outdoor ×1
06/13/2024Permit IssuedGilbane Building CompanyAir Conditioning Systems
Cooling
Daikin FTX24NMVJU 600 CFM · Split System ×2
2 projects · most recent 06/12/2024
FiledStatusContractorScope
06/12/2024Permit IssuedArcher Consultants Group—
02/25/2020Permit IssuedWelkin Fire Protection—
2 projects · most recent 05/27/2025
Water/Sanitary Gas Medical Gas
FiledStatusContractorScope
05/27/2025Permit IssuedAlliance PlumbingGas, Medical Gas, Water/Sanitary
02/25/2020——Water/Sanitary
16 projects · most recent 03/24/2025
General Wiring Boiler Controls
FiledStatusContractorScope
03/24/2025CompleteHugh O'Kane Electric CoGeneral Wiring
11/08/2024CompleteR. Donovan & Son Electric—
06/14/2024Permit IssuedRigid Electric—
01/19/2024CompleteCaputek Electrical Services—
08/16/2023Permit IssuedRigid ElectricGeneral Wiring
07/25/2023CompleteConductor Electrical ServicesGeneral Wiring
01/18/2023CompleteRigid ElectricGeneral Wiring
01/11/2023CompleteR. Donovan & Son ElectricGeneral Wiring
01/11/2023CompleteMatros Automated ElectricalGeneral Wiring
01/06/2023CompleteR. Donovan & Son ElectricGeneral Wiring
05/13/2022Permit IssuedTop Shelf Electric—
04/06/2022CompleteMho's ElectricGeneral Wiring
11/09/2021CompleteCaputek Electrical Services—
06/17/2020CompleteTop Shelf Electric—
11/14/2018CompleteNY Electric Maintenance & DataGeneral Wiring
5 projects · most recent 05/22/2026
Steel Concrete
FiledStatusContractorScope
05/22/2026——1 scope_items
07/28/2025Signed-offDNA ContractingSteel, Concrete
05/02/2025Permit IssuedDNA ContractingSteel
06/12/2024Permit IssuedGilbane Building CompanySteel, Concrete
04/11/2024Permit IssuedDNA ContractingSteel, Concrete
1 project · most recent 04/11/2024
Fence
FiledStatusContractorScope
04/11/2024Permit IssuedDNA ContractingFence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/18/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/05/2026Duct leakage testing, insulation and design—energy_progress
10/01/2026Fire-Resistant Penetrations and Joints—special
09/28/2026Interior lighting power—energy_progress
09/28/2026Post-installed Anchors—special
09/28/2026HVAC-R and service water piping design and insulation—energy_progress
09/28/2026HVAC-R and service water heating system controls—energy_progress
09/28/2026Maintenance information—energy_progress
09/28/2026HVAC-R and service water heating equipment—energy_progress
09/28/2026Final—progress
09/28/2026Energy Code Compliance Inspections—progress
09/28/2026Post-installed Anchors—special
09/28/2026Fire-Resistant Penetrations and Joints—special
09/28/2026Mechanical Systems—special
09/28/2026Sprinkler Systems—special
09/28/2026Lighting controls—energy_progress
09/28/2026Energy Code Compliance Inspections—progress
09/28/2026Final—progress
09/28/2026Post-installed Anchors—special
09/28/2026Fire-Resistant Penetrations and Joints—special
09/28/2026Final—progress
09/28/2026Structural Steel - Welding—special
09/28/2026Structural Steel - High Strength Bolting—special
09/28/2026Structural Steel - Details—special
09/28/2026Structural Stability – Alterations of existing buildings—special
09/28/2026Sprayed fire-resistant materials—special
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nyu Silver Science ComplexEducationCellar
Project M01466277 Alteration · Approved · 10/05/2026
New York UniversityEducationEntire building
Project M01378117 Alteration · Approved · 05/22/2026
Project M01305739 Alteration · LOC Issued · 10/23/2025
Project M01175614 Alteration · Permit Entire · 03/04/2025
Project M01065593 Alteration · LOC Issued · 06/21/2024
Project M01023785 Alteration · LOC Issued · 03/28/2024
Project M00943301 Alteration · Permit Issued · 10/25/2023
Project M00904565 Alteration · LOC Issued · 09/11/2023
Project M00903084 Alteration · LOC Issued · 07/20/2023
Project M00879628 Alteration · LOC Issued · 06/07/2023
Project M00872691 Alteration · Approved · 06/05/2023
Project M00879611 Alteration · LOC Issued · 06/05/2023
Project M00879683 Alteration · LOC Issued · 06/02/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,306 on file (BIS + DOB NOW)
▸Plans & Drawings72
▸DOB NOWPlans/Sketch64
10/06/2026M01466277-S4Request digital key ↗
10/06/2026M01466277-S3Request digital key ↗
10/06/2026M01466277-S1Request digital key ↗
Showing 3 of 64 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00304155-I1Request digital key ↗
09/04/2026M00264694-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00304187-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00304195-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00363516-I1Request digital key ↗
▸Applications & Permits213
▸BISPLAN / WORK APPROVAL APPLICATION105
05/22/2024123854061Open ↗
06/07/2023123584567Open ↗
03/01/2022123854061Open ↗
Showing 3 of 105 on file for this type
▸BISWORK PERMIT APPLICATION104
09/15/2022123854061Open ↗
07/16/2020140901246Open ↗
02/20/2019123424339Open ↗
Showing 3 of 104 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
07/15/2020140901246Open ↗
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE DEPARTMENT SIGN OFF FOR RELATEDAPPLICATION, F.P.INDEX # 1806059,FPIMS #38197687.1
08/19/2022123584567Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications392
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION141
02/19/2020123854061Open ↗
11/07/2019123424339Open ↗
11/07/2019123424339Open ↗
Showing 3 of 141 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature73
10/13/2026M01401630-I1Open ↗
10/06/2026M01466277-S2Open ↗
10/06/2026M01466277-S4Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWProgress Inspector Seal & Signature53
10/13/2026M01401630-I1Open ↗
10/13/2026M01401630-I1Open ↗
09/29/2026M00904565-P5Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
10/13/2026M01401630-I1Open ↗
09/30/2026M00668223-P2Open ↗
09/29/2026M00904565-P5Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST30
06/08/2018123588251Open ↗
08/15/2017123106183Open ↗
Showing 2 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
05/14/2020140901246Open ↗
09/24/2018140801390Open ↗
06/08/2018123588251Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/14/2020140901246Open ↗
09/24/2018140801390Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/14/2020140901246Open ↗
09/24/2018140801390Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment97
▸BISSELF-CERT PLUMBING NOTICE48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA19
02/23/2021123577094Open ↗
03/06/2020123427238Open ↗
01/07/2020123427238Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSPRINKLER INSP REPORT : FP-859
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/05/2019122678726Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos100
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
10/13/2026M01401630-I1Open ↗
09/05/2026M00304195-I1Open ↗
09/04/2026M00264694-P1Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
05/14/2020140901246Open ↗
02/19/2020123854061Open ↗
09/24/2018140801390Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS INSPECTION REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
02/19/2020123854061Open ↗
11/07/2019123424339Open ↗
11/07/2019123424339Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
10/15/2020140901246Open ↗
11/07/2019123424339Open ↗
09/11/2019140801390Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/14/2020140901246Open ↗
09/24/2018140801390Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
03/02/2022123854061Open ↗
06/19/2020140901246Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/26/2018140801390Open ↗
09/24/2018140801390Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/01/2026M00705811-I1Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/15/2020140901246Open ↗
05/14/2020140901246Open ↗
09/26/2018140801390Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs170
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter73
10/13/2026M01401630-I1Open ↗
10/06/2026M01466277-S4Open ↗
10/06/2026M01466277-S2Open ↗
Showing 3 of 73 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST48
06/08/2023123584567Open ↗
07/27/2021123584567Open ↗
02/23/2021123577094Open ↗
Showing 3 of 48 on file for this type
▸BISADMINISTRATIVE OBJECTIONS30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/19/2020123854061Open ↗
02/20/2019123424339Open ↗
08/23/2018123584567Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter7
08/27/2026M00943301-I1Open ↗
Showing 1 of 7 on file for this type
▸BISFINAL1
03/02/2022123854061Open ↗
▸BISSHED LETTER1
08/16/2018123089923Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT79
02/23/2021123577094Open ↗
10/15/2020140901246Open ↗
09/25/2020123584567Open ↗
Showing 3 of 79 on file for this type
▸Filing & Intake Forms102
▸BISEFILING COVER SHEET70
02/19/2020123854061Open ↗
10/23/2018122852289Open ↗
06/08/2018123588251Open ↗
Showing 3 of 70 on file for this type
▸BISBOROUGH INTAKE FORM17
03/26/2020123584567Open ↗
03/06/2020123427238Open ↗
12/12/2019122678726Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION11
07/15/2024123854061Open ↗
07/27/2018123424339Open ↗
07/25/2018123424339Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/14/2020140901246Open ↗
09/24/2018140801390Open ↗
Showing 2 of 4 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
10/23/2018122852289Open ↗
10/23/2018122852289Open ↗
08/23/2018123584567Open ↗
Showing 3 of 22 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type