← Back
BuildNYC
MANHATTAN
100 WEST 114TH STREET
MANHATTAN · BIN 1055019
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
17 Active Violations 16 unresolved · 1 paperwork only ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGenesis Tpt Harlem LLCUnder Construction48p · 7 filings · 20 docs
BulkheadStructural workUnder Construction1p · 1 filing · 10 docs
Floor 5Structural workUnder Construction44p · 5 filings · 20 docs
Floor 4Structural workUnder Construction43p · 5 filings · 20 docs
Floor 3Structural workUnder Construction43p · 5 filings · 20 docs
Floor 2Structural workUnder Construction44p · 5 filings · 20 docs
Floor 1Structural workUnder Construction50p · 7 filings · 20 docs
CellarStructural workUnder Construction44p · 6 filings · 20 docs
Site & exteriorInstallation of Temporary Pipe ScaffoldUnder Construction5p · 1 filing · 2 docs
Filed — no permit issuedSewer service repair and relay1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wellworth Consulting110/08/2026
Emtg Consultants709/23/2026
Romines Architecture409/16/2026
McHenery Testing Lab207/02/2026
Gace106/09/2026
Kce Consulting Engineering204/20/2026
McLaren Engineering Group111/03/2023
Enthink Engineers109/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147803/21/2026
JM Zoning803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Summit JVGeneral Contractor204/09/2026
Alpha Group NY1Scaffold207/08/2026
Touchstone RenovationsGeneral Contractor109/09/2026
Mark Contracting NYScaffold107/08/2026
Spring ScaffoldingScaffold110/10/2026
Advanced PlumbingFire Protection108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Kce Consulting Engineering37121009/16/2026
Building Lifecycle
All (122)Filed (20)Permit Issued (9)Signed Off (1)Violation (39)Objection (23)Special Inspection (30)
10/09/2026
Permit issued — Protection and Mechanical Methods
M01466640-I1-PMM
10/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01466640-I1
09/23/2026
Filed — Alteration
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517401-P2
09/16/2026
Filed — Alteration
HEREWITH FILING DEMO & CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00517383-P3
09/08/2026
Permit issued — Structural
M00517427-I1-ST
08/19/2026
Permit issued — Sprinklers
M01424107-I1-EW-SP
08/17/2026
Special inspection requirement — Insulation placement and R values
Kemba Walcott
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Kemba Walcott
08/17/2026
Special inspection requirement — Masonry
Kemba Walcott
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
08/17/2026
Special inspection requirement — Sprayed fire-resistant materials
Kemba Walcott
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Kemba Walcott
08/17/2026
Special inspection requirement — Fenestration air leakage
Kemba Walcott
08/17/2026
Special inspection requirement — Air barrier - visual inspection
Kemba Walcott
08/17/2026
Special inspection requirement — Final
Kemba Walcott
08/13/2026
Permit issued — Suspended Scaffold
M01438550-I1-SC
08/11/2026
Filed — Alteration
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT AN EXISTING5 STORY R-2 BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01424107-I1
08/09/2026
Objection resolved — Addressed
08/07/2026
Objection raised — Other
08/03/2026
Filed — Alteration
Suspended scaffold outrigger installation for facade restoration works
M01438550-I1
07/06/2026
Permit issued — Supported Scaffold
M01421753-I1-SF
07/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01414223-I1
07/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01421753-I1
07/02/2026
Permit issued — Sidewalk Shed
M01414223-I1-SH
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
06/29/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
06/29/2026
Special inspection requirement — Sprinkler Systems
Kemba Walcott
06/11/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
06/11/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
06/11/2026
Special inspection requirement — Final
Kemba Walcott
06/11/2026
Special inspection requirement — Heating Systems
Kemba Walcott
06/09/2026
Filed — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, STUCCO REPLACEMENT AND LINTEL REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01353136-I1
04/29/2026
Violation issued (HPD, open)
A
04/20/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC
M00517427-P1
04/14/2026
Filed — Alteration
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517401-P1
04/14/2026
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517395-P1
04/13/2026
Special inspection requirement — Wood – Seismic Resistance
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
04/08/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
04/08/2026
Special inspection requirement — Final
Kemba Walcott
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
04/08/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
04/08/2026
Special inspection requirement — Heating Systems
Kemba Walcott
03/26/2026
Permit issued — General Construction
M00517383-I1-GC
01/12/2026
Permit issued — General Construction
M00517383-I1-GC
01/12/2026
Objection raised — Scope
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Plumbing
12/29/2025
Filed — Alteration
HEREWITH FILING BOILER WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01043039-I1
12/08/2025
Filed — Alteration
HEREWITH FILING DEMO & CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00517383-P2
07/08/2025
Objection raised — Scope
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/09/2026
DOB NOWStructuralPermit IssuedTouchstone Renovations09/08/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing08/19/2026
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration08/13/2026
DOB NOWSupported ScaffoldPermit IssuedAlpha Group NY107/06/2026
DOB NOWSidewalk ShedPermit IssuedAlpha Group NY107/02/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV03/26/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV01/12/2026
DOB NOWSidewalk ShedSigned-offMark Contracting NY09/29/2021
BISOTISSUEDPuar General Construction, Icn05/02/2001
1 project · most recent 04/14/2026
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026——Associated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Slant-Fin TK-90 3,584 BTU · Boiler ×48
Bell & Gossett W-60 15 kW · Pump ×4
Lochinvar FTX500N 500,000 BTU · Condensing Unit ×4
Ventilation
Greenheck C-097-VG Exhaust Fan ×6
CVE-080-VG, CVE-680-VG Kitchen Exhaust ×4
Rupp Air RARTUI-E302-15-7.5T-DOAS 102,000 BTU · Doas ×2
Ducts & Piping
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedAdvanced Plumbing113 heads
3 projects · most recent 09/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2026——Gas, Storm, Water/Sanitary
08/11/2026———
11/03/2023——Gas, Storm, Water/Sanitary
3 projects · most recent 07/02/2026
General Wiring
FiledStatusContractorScope
07/02/2026Permit IssuedRichard Neu—
04/14/2026Permit IssuedLND ElectricGeneral Wiring
09/29/2021Permit IssuedRichard Neu—
1 project · most recent 04/20/2026
Concrete Wood
FiledStatusContractorScope
04/20/2026Permit IssuedTouchstone RenovationsConcrete, Wood
2 projects · most recent 07/02/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/02/2026Permit IssuedAlpha Group NY1Sidewalk Shed
07/02/2026Permit IssuedAlpha Group NY1Scaffold
1 project · most recent 08/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/03/2026Permit IssuedM.G.R. RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
08/17/2026Fenestration and door U-factor and product ratingsKemba Walcottenergy_progress
08/17/2026Air barrier - visual inspectionKemba Walcottenergy_progress
08/17/2026Fire-Resistance Rated ConstructionKemba Walcottprogress
08/17/2026FinalKemba Walcottprogress
08/17/2026Energy Code Compliance InspectionsKemba Walcottprogress
08/17/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
08/17/2026Sprayed fire-resistant materialsKemba Walcottspecial
08/17/2026MasonryKemba Walcottspecial
08/17/2026Insulation placement and R valuesKemba Walcottenergy_progress
08/17/2026Fenestration air leakageKemba Walcottenergy_progress
06/29/2026Post-installed AnchorsKemba Walcottspecial
06/29/2026Sprinkler SystemsKemba Walcottspecial
06/29/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
06/11/2026HVAC-R and service water heating system controlsKemba Walcottenergy_progress
06/11/2026Mechanical SystemsKemba Walcottspecial
06/11/2026Heating SystemsKemba Walcottspecial
06/11/2026FinalKemba Walcottprogress
06/11/2026Energy Code Compliance InspectionsKemba Walcottprogress
06/11/2026Shutoff dampersKemba Walcottenergy_progress
06/11/2026HVAC-R and service water heating equipmentKemba Walcottenergy_progress
06/11/2026HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
04/13/2026Wood – Seismic Resistance—special
04/08/2026Structural Wood FrameKemba Walcottprogress
04/08/2026Heating SystemsKemba Walcottspecial
04/08/2026Mechanical SystemsKemba Walcottspecial
Latest 25 of 69.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/03/2026M00596159-I1Request digital key ↗
08/28/2026M00928919-I1Request digital key ↗
08/28/2026M00928919-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature26
10/14/2026M00517383-P3Open ↗
10/14/2026M00517383-P3Open ↗
10/14/2026M00517383-P3Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
10/13/2026M01466640-I1Open ↗
10/05/2026M00517401-P2Open ↗
08/28/2026M00928919-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/14/2026M00517383-P3Open ↗
10/14/2026M00517383-P3Open ↗
10/14/2026M00517383-P3Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/05/2026M00517401-P2Open ↗
08/27/2026M00517383-P3Open ↗
08/17/2026M00517395-P1Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
10/13/2026M01466640-I1Open ↗
10/05/2026M00517401-P2Open ↗
08/28/2026M00928919-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
10/05/2026M00517401-P2Open ↗
08/28/2026M00928919-P1Open ↗
08/27/2026M00517383-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M00928919-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/27/2026M00517383-P3Open ↗
08/13/2026M00517383-P1Open ↗
08/13/2026M00517383-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications1
08/15/2026M01438550-I1Open ↗
▸DOB NOWCalculations1
08/15/2026M01438550-I1Open ↗