← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Normandie Condominium
100 WEST 119TH STREET · BIN 1057494
💬 Discuss this project
1900Year Built
7Stories
RMBuilding Class
R7-2Zoning
39,080 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized7 Active Violations 6 unresolved · 1 paperwork only 1 likely answered 4 old, status unconfirmed ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Normandie Condominium · 7,569 sf lot · 5.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDaisy Management LLCUnder Construction1p · 1 filing · 16 docs
PenthouseUnit PHA1 filing · 6 docs
Floor 4Unit 4B3p · 1 filing · 10 docs
Floor 3Unit 3C2p · 2 filings · 11 docs
Floor 2Unit 2A7p · 2 filings · 20 docs
Floor 1El Encanto De LolaUnder Construction28p · 4 filings · 20 docs
CellarDaisy Management LLC2 filings · 9 docs
Site & exteriorDaisy Management LLCUnder Construction24p · 3 filings · 13 docs
Filed — no permit issuedEl Encanto De Lola 2 LLC1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
167-177 Lenox Avenue2103/21/2026
167-77 Lenox1803/21/2026
Normandie Condominium1103/21/2026
175 Lenox Residence603/21/2026
Tahl Propp Equities403/21/2026
100 W 119 ST403/21/2026
EL Encanto de Lola 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rel Engineering207/22/2026
Rigid Structural Design111/20/2025
Fmo Engineering107/31/2025
Moore Associates105/14/2025
SW Engineering Company108/01/2023
EG Architecture601/19/2023
Audra Manzano Architect212/19/2022
Niza Works of Architecture307/04/2022
Stephen K. Chin, Architect211/13/2020
Technemotion Design108/05/2020
Asif Jamil, RA206/22/2018
Pace Engineering205/08/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Edward F Zevallos Architect1203/21/2026
Synchron Expediting403/21/2026
Niza Works of Architecture203/21/2026
Green Light Expediting203/21/2026
Municipal Building Consultants103/21/2026
Maryclare Nepogoda203/21/2026
Highrise Group103/21/2026
Rigid Structural Design203/21/2026
Green Studio403/21/2026
Simplifile403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold603/21/2026
Traditional WaterproofingScaffold403/21/2026
New Amsterdam RestorationScaffold409/26/2026
Loyola Painting & ConstructionGeneral Contractor303/21/2026
No Limit ContractingGeneral Contractor303/21/2026
Attic to Basement HomeGeneral Contractor303/21/2026
So Plumbing & HeatingPlumbing207/08/2026
Avarga ConstructionScaffold209/18/2026
Glendale Electl ContngElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
E.S.B. ElectricElectrical103/21/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Bent MechanicalPlumbing107/08/2026
G. & S. Plumbing & Heating CoPlumbing107/08/2026
Y.S. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rel Engineering9705107/22/2026
Fmo Engineering1798107/31/2025
Moore Engineering of NY9134105/14/2025
Niza Works of Architects6101307/04/2022
Building Lifecycle
All (196)Filed (25)Permit Issued (19)Signed Off (5)Facade (FISP) (16)Violation (60)Inspection (6)Objection (35)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
M01320076-I1-SH
09/17/2026
Permit issued — Supported Scaffold
M01214903-S3-SF
09/14/2026
Objection resolved — Addressed
09/11/2026
Objection raised — Other
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
A
08/06/2026
Objection raised — Other
08/06/2026
Objection raised — Other
08/06/2026
Objection raised — Other
07/30/2026
Permit issued — Protection and Mechanical Methods
M01214903-S1-PMM
07/22/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND INSPECTION AS PER PLANS FILED HEREWITH NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01214903-S3
07/15/2026
Objection resolved — Addressed
06/23/2026
Permit issued — Suspended Scaffold
M01214903-S2-SC
06/18/2026
Objection raised — Other
06/15/2026
Permit issued — Sidewalk Shed
M01320076-I1-SH
06/10/2026
Objection resolved — Addressed
06/10/2026
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
06/05/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND INSPECTION AS PER PLANS FILED HEREWITH NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01214903-S1
06/05/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND INSPECTION AS PER PLANS FILED HEREWITH NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01214903-S2
06/02/2026
Objection resolved — Addressed
05/20/2026
Objection raised — Cost
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
04/20/2026
Violation issued (ECB, open)
Local Law
03/13/2026
Permit issued — Sidewalk Shed
M01320076-I1-SH
01/28/2026
Cycle 9 facade report submitted
01/09/2026
Cycle 9 facade report signed — UNSAFE
12/10/2025
Cycle 9 facade inspection completed
11/21/2025
Permit issued — Sidewalk Shed
M01320076-I1-SH
11/20/2025
Filed — Alteration
M01320076-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2025
Objection raised — Scope
08/12/2025
Objection raised — Admin
08/12/2025
Objection raised — Scope
08/12/2025
Objection raised — Scope
08/11/2025
Objection raised — Energy
08/11/2025
Objection raised — Inspections
08/11/2025
Objection raised — Scope
07/31/2025
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND INSPECTION AS PER PLANS FILED HEREWITH NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01214903-I1
06/26/2025
Objection raised — Admin
06/26/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Cost
05/29/2025
Objection resolved — Addressed
05/14/2025
Filed — Alteration
SIDEWALK VAULT RECONSTRUCTION AND REPAIR. WORK SHALL INCLUDE REPLACEMENT OF CORRODED METAL DECKING, INSTALLATION OF NEW BEARING WALL AND SIDEWALK FLAG AND STRUCTURAL SLAB REPLACEMENT.
M01188397-I1
05/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/05/2025
Special inspection requirement — Structural Steel - Welding
Christine Hobson
05/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Christine Hobson
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Christine Hobson
05/05/2025
Special inspection requirement — Masonry
05/05/2025
Special inspection requirement — Structural Steel - Details
04/23/2025
Special inspection requirement — Final
FRANCESCO MO
04/23/2025
Special inspection requirement — Masonry
FRANCESCO MO
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration09/25/2026
DOB NOWSupported ScaffoldPermit IssuedAvarga Construction09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAvarga Construction07/30/2026
DOB NOWSuspended ScaffoldPermit IssuedAvarga Construction06/23/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration06/15/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration03/13/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration11/21/2025
DOB NOWGeneral ConstructionSigned-offAttic to Basement Home02/07/2023
DOB NOWPlumbingPermit IssuedArco Plumbing and Heating01/05/2023
DOB NOWGeneral ConstructionSigned-offNo Limit Contracting12/21/2022
DOB NOWPlumbingSigned-offBent Mechanical01/25/2022
DOB NOWGeneral ConstructionSigned-offLoyola Painting & Construction01/20/2022
DOB NOWPlumbingPermit IssuedG. & S. Plumbing & Heating Co04/30/2021
DOB NOWPlumbingPermit IssuedNicholas Suida02/01/2021
DOB NOWPlumbingPermit IssuedNicholas Suida09/25/2020
DOB NOWSupported ScaffoldPermit IssuedTraditional Waterproofing01/16/2019
DOB NOWSidewalk ShedSigned-offRock Group NY12/20/2018
DOB NOWSidewalk ShedSigned-offRock Group NY05/11/2018
DOB NOWSupported ScaffoldPermit IssuedTraditional Waterproofing05/04/2018
BISOTISSUEDEnvision Design & Construction08/11/2020
BISOTISSUEDTraditional Waterproofing01/14/2019
BISOTISSUEDLYNX Builders09/22/2018
BISOTISSUEDTraditional Waterproofing07/17/2018
BISPLISSUEDG. & S. Plumbing & Heating Co04/13/2018
BISMHISSUEDSolution Fire Prevention04/12/2018
BISFPISSUEDFire Command Co03/22/2018
BISOTISSUEDBuild Now NYC04/08/2016
BISEQISSUEDSilver Fox Associates03/02/2016
BISOTISSUEDSilver Fox Associates03/02/2016
BISPLISSUEDCape Plumbing10/26/2015
BISEQISSUEDSilver Fox Associates09/09/2015
BISOTISSUEDSilver Fox Associates09/09/2015
BISPLISSUEDRom Piping & Heating08/24/2015
BISEQISSUEDBlue Water Construction & Restoration06/23/2015
BISOTISSUEDBlue Water Construction & Restoration06/23/2015
BISOTISSUEDXinos Construction02/25/2015
BISEQISSUEDXinos Construction02/24/2015
BISMHISSUEDCentral Construction Management01/16/2015
BISOTISSUEDBlue Water Construction & Restoration12/31/2014
BISEQISSUEDBlue Water Construction & Restoration12/31/2014
+ 29 more permits on file
3 projects · most recent 12/19/2022
Water/Sanitary Gas
FiledStatusContractorScope
12/19/2022Permit IssuedArco Plumbing and HeatingGas, Water/Sanitary
04/19/2021Permit IssuedG. & S. Plumbing & Heating CoWater/Sanitary
11/13/2020Permit IssuedTak Plumbing & Heating CoWater/Sanitary
6 projects · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025Permit IssuedGlendale Electl Contng—
09/24/2020Permit IssuedValley Electric of NYGeneral Wiring
08/20/2020CompleteKings Electric CoGeneral Wiring
02/10/2020CompleteSafetech Electrical Contng—
02/10/2020CompleteSafetech Electrical Contng—
03/19/2019CompleteEnterprise Electrical SystemsGeneral Wiring
2 projects · most recent 07/22/2026
Steel Masonry Concrete
FiledStatusContractorScope
07/22/2026Permit IssuedAvarga ConstructionSteel, Masonry
05/14/2025——Steel, Concrete, Masonry
1 project · most recent 07/22/2026
Scaffold
FiledStatusContractorScope
07/22/2026Permit IssuedAvarga ConstructionScaffold
1 project · most recent 07/22/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2026Permit IssuedAvarga ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/10/2026Structural Steel - DetailsFRANCESCO MOspecial
05/05/2025Structural Stability – Alterations of existing buildings—special
05/05/2025Structural Steel - WeldingChristine Hobsonspecial
05/05/2025Structural Steel - High Strength BoltingChristine Hobsonspecial
05/05/2025Tenant Protection Plan Compliance—special
05/05/2025Concrete - Cast-In-PlaceChristine Hobsonspecial
05/05/2025Masonry—special
05/05/2025Structural Steel - Details—special
04/23/2025FinalFRANCESCO MOprogress
04/23/2025MasonryFRANCESCO MOspecial
04/23/2025Construction Operations Influencing Adjacent StructuresFRANCESCO MOspecial
04/23/2025Post-installed AnchorsFRANCESCO MOspecial
04/23/2025Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
04/23/2025Tenant Protection Plan Compliance—special
02/28/2025Final—progress
02/28/2025Footing and Foundation—progress
12/05/2023Fire-Resistance Rated ConstructionYakov Weinsteinprogress
05/22/2023FinalYakov Weinsteinprogress
05/22/2023Tenant Protection Plan Compliance—special
01/12/2023Lighting in dwelling unitsKeith Greenwaldenergy_progress
01/12/2023FinalKeith Greenwaldprogress
11/22/2022FinalAUDRA MANZANOprogress
10/11/2022Energy Code Compliance InspectionsKeith Greenwaldprogress
09/12/2022Energy Code Compliance InspectionsKeith Greenwaldprogress
08/08/2022Energy Code Compliance InspectionsKeith Greenwaldprogress
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
El Encanto De LolaRestaurant / Food ServiceFloor 1
Project M00736417 Alteration · QA Failed · 07/04/2022
Project M00506126 Alteration · Permit Entire · 04/19/2021
Project M00436925 Alteration · Objections · 02/10/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 373 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch22
09/06/2026M00034048-I1Request digital key ↗
09/06/2026M00034048-P1Request digital key ↗
09/06/2026M00033043-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00349294-I1Request digital key ↗
09/04/2026M00436925-I1Request digital key ↗
08/15/2026M00349294-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00289232-I1Request digital key ↗
▸Applications & Permits78
▸BISWORK PERMIT APPLICATION33
08/11/2020140911850Open ↗
01/14/2019123191955Open ↗
09/19/2018140801504Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
07/12/2023140801504Open ↗
07/03/2023140801504Open ↗
04/17/2023140801504Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit17
09/02/2026M00650879-I1Open ↗
08/16/2026M01214903-I1Open ↗
08/13/2026M00878624-I1Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
03/04/2019140748948Open ↗
03/01/2019123191955Open ↗
08/31/2018140743569Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00034048-I1Open ↗
09/06/2026M00034048-P1Open ↗
09/06/2026M00033043-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026M00033043-I1Open ↗
09/27/2026M00033043-I1Open ↗
09/23/2026M00506126-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/21/2018140748948Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/14/2016122753387Open ↗
09/19/2013121768630Open ↗
01/10/2013121461248Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/21/2018140748948Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/21/2018140748948Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/10/2013121461248Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00506126-I1Open ↗
09/01/2026M01214903-I1Open ↗
09/01/2026M01214903-I1Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE6
12/21/2015121461248Open ↗
03/04/2014121461248Open ↗
07/15/2013121461248Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING6
03/16/2018140743569Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/04/2015122194856Open ↗
11/21/2014122194856Open ↗
▸Safety & Tenant Protection10
▸BISTENANT PROTECTION PLAN AND NOTES6
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/21/2018140748948Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00349294-I1Open ↗
08/13/2026M00349294-P1Open ↗
08/13/2026M00289232-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/01/2018123191955Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/04/2026M00436925-I1Open ↗
09/02/2026M00736417-I1Open ↗
09/02/2026M00650879-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/16/2018140743569Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/17/2018123191955Open ↗
05/06/2014120852050Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
09/26/2013121696860Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/24/2021140911850Open ↗
07/29/2020140911850Open ↗
07/15/2020140911850Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/01/2019123191955Open ↗
06/26/2018123191955Open ↗
01/10/2013121461248Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/24/2021140911850Open ↗
03/01/2019123191955Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/13/2023140801504Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00650879-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/11/2023140801504Open ↗
06/30/2023140801504Open ↗
02/24/2021140911850Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs31
▸BISLANDMARKS APPROVAL8
07/15/2020140911850Open ↗
03/01/2019123191955Open ↗
09/19/2018140801504Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
07/03/2013121696860Open ↗
01/10/2013121461248Open ↗
Showing 2 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/24/2021140911850Open ↗
03/04/2019140748948Open ↗
03/01/2019123191955Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/17/2018123191955Open ↗
03/21/2018140748948Open ↗
09/22/2015122194856Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF2
07/18/2023140801504Open ↗
02/24/2021140911850Open ↗
▸BISSHED LETTER1
07/19/2013140067102Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01214903-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/20/2026M01320076-I1Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
02/24/2021140911850Open ↗
07/15/2020140911850Open ↗
03/04/2019140748948Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/13/2023140801504Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET11
02/01/2018123191955Open ↗
04/14/2016122753387Open ↗
12/30/2014122194856Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION9
03/04/2019140748948Open ↗
08/27/2018140743569Open ↗
07/17/2018123191955Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM6
03/04/2019140748948Open ↗
03/01/2019123191955Open ↗
08/31/2018140743569Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
07/15/2020140911850Open ↗
09/19/2018140801504Open ↗
03/21/2018140748948Open ↗
Showing 3 of 6 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/15/2020140911850Open ↗
08/02/2013121696860Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M08044526-I1Open ↗
08/13/2026M08044529-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
03/04/2019140748948Open ↗
▸DOB NOWCalculations1
08/16/2026M01214903-S2Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01214903-S2Open ↗