← Back
BuildNYC
Shopping center, with or without parking
100 WEST 125TH STREET
MANHATTAN · BIN 1089325
💬 Discuss this project
2013Year Built
5.5Stories
K6Building Class
C4-4DZoning
160,501 sfGross Floor Area
6Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸
Shopping center, with or without parking · Owner of record: 125th & Lenox Owner · 32,800 sf lot · 4.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2H&M Harlem, H&M Store No. US0759 +162p · 10 filings · 20 docs
Floor 1Whole Foods Market, H&M Harlem +1Under Construction61p · 10 filings · 20 docs
CellarWhole Foods MarketUnder Construction3p · 1 filing · 6 docs
Site & exteriorWharton Properties LLC2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wharton Realty LLC Aka Carleton13110/04/2026
125th & Lenox Owner1303/22/2026
Whole Foods Market1103/21/2026
Whole Foods303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering103/21/2026
EA Design Group1403/21/2026
JP Expedite203/21/2026
National Maintenance203/21/2026
BRR Architecture103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Schimenti Construction CoGeneral Contractor807/08/2026
C.M. Richey Electrical ContractingElectrical403/21/2026
National MaintenanceSign hanger107/08/2026
Signs CadSign hanger107/08/2026
Allstate SprinklerFire Protection107/08/2026
Jag Plumbing & MechanicalPlumbing107/08/2026
Sean Coakley P & HPlumbing107/08/2026
Cas EquipmentGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423111/13/2025
AK Engineering678308/01/2023
Stratford Engineering997107/27/2023
Building Lifecycle
All (122)Filed (14)Permit Issued (11)Signed Off (10)Violation (60)Inspection (5)Objection (6)Special Inspection (16)
09/25/2026
Objection raised — Scope
09/25/2026
Objection raised — Cost
08/19/2026
Filed — Alteration
GENERAL CONSTRUCTION TO INCLUDE SEPARATION OF THE INTERIOR SPACE ON THE SECOND FLOOR. INTERIOR DEMOLITION AND REMOVAL OF NON-LOAD BEARINGWALLS, REMOVE AND REPLACE ALL INTERIOR FINISHES AND FIXTURES. ALL RELATED WORK TO BE INCLUDED AS PER DRAWINGS FILED.
M01448167-I1
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — Final
07/21/2026
Filed — Alteration
INTERIOR DEMOLITION AND REMOVAL OF NON-LOAD BEARING WALLS, REMOVE AND REPLACE ALL INTERIOR FINISHES AND FIXTURES INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: PLUMBING FIXTURES, APPLIANCES, CABINETS, DOORS, DOOR FRAMES, AND HARDWARE.
M01434419-I1
07/21/2026
Special inspection requirement — Final
05/18/2026
Filed — No Work
M01386318-I1
04/13/2026
Special inspection requirement — Public Assembly Emergency Lighting
STEVEN GAMBINO
02/27/2026
Permit issued — Mechanical Systems
M01295612-I1-MS
01/26/2026
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Energy
12/11/2025
Objection raised — Cost
11/13/2025
Filed — Alteration
REPLACE EXISTING 100% OUTSIDE AIR AIR HANDLING UNITS ALONG WITH ASSOCIATEDAPPURTENANCES TO IMPROVE STORE CONDITIONS AS SHOWN ON THE PLANS. CONNECT TOEXISTING DUCTWORK AND HOT WATER PIPING, REMOVE CHILLED WATER PIPING, PROVIDENEW CONDENSER WATER PIPING
M01295612-I1
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
09/30/2025
Special inspection requirement — Mechanical Systems
Young Suh
09/30/2025
Special inspection requirement — Final
Young Suh
12/09/2024
Signed off — Alteration
M01071527-I1
07/23/2024
Permit issued — General Construction
M01071527-I1-GC
07/16/2024
Filed — Alteration
M01071527-I1
06/24/2024
Special inspection requirement — Final
Kenneth Park
03/04/2024
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR H&M, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00926396-I1
01/29/2024
Signed off — Alteration
M00890614-I1
01/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/28/2023
Signed off — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890589-I1
11/24/2023
Signed off — Alteration
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890057-I1
11/24/2023
Signed off — Alteration
M00890050-I1
11/24/2023
Signed off — Alteration
M00890048-I1
11/13/2023
Signed off — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00864496-I1
10/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2023
Permit issued — Sign
M00926396-I1-SG
09/07/2023
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR H&M, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00926396-I1
08/31/2023
Permit issued — Plumbing
M00890589-I1-PL
08/30/2023
Special inspection requirement — Final
AHMED SHAABAN
08/08/2023
Permit issued — Mechanical Systems
M00890050-I1-MS
08/08/2023
Permit issued — Structural
M00890057-I1-ST
08/01/2023
Filed — Alteration
M00890050-I1
08/01/2023
Permit issued — General Construction
M00890048-I1-GC
07/28/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890589-I1
07/27/2023
Filed — Alteration
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890057-I1
07/26/2023
Filed — Alteration
M00890048-I1
07/06/2023
Permit issued — Sprinklers
M00890614-I1-EW-SP
06/30/2023
Filed — Alteration
M00890614-I1
06/26/2023
Special inspection requirement — Post-installed Anchors
Xianzhang Chen
06/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
06/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
06/14/2023
Permit issued — General Construction
M00864496-I1-GC
06/13/2023
Special inspection requirement — Final
Xianzhang Chen
06/06/2023
Filed — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR & 2ND FLOOR FOR STORE (H&M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00864496-I1
04/25/2023
Special inspection requirement — Final
Kenneth Park
12/05/2022
Signed off — Alteration
M00707623-I1
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2022
Filed — Alteration
M00707623-I1
04/18/2022
Permit issued — Sign
M00707623-I1-SG
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCas Equipment02/27/2026
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co07/23/2024
DOB NOWSignSigned-offNational Maintenance09/08/2023
DOB NOWPlumbingSigned-offSean Coakley P & H08/31/2023
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co08/08/2023
DOB NOWStructuralSigned-offSchimenti Construction Co08/08/2023
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co08/01/2023
DOB NOWSprinklersSigned-offAllstate Sprinkler07/06/2023
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co06/14/2023
DOB NOWSignPermit IssuedSigns Cad04/18/2022
DOB NOWPlumbingSigned-offJag Plumbing & Mechanical08/14/2020
BISPLISSUEDV & M Drain Cleaning11/26/2021
BISPLISSUEDEH Plumbing & Heating11/03/2021
BISOTISSUEDStructurecraft Contracting06/17/2020
BISPLISSUEDCopper Services02/26/2019
BISOTISSUEDLasberg Construction Associates03/28/2018
BISCCISSUEDKSK Construction Group02/12/2018
BISPLISSUEDCopper Services01/24/2018
BISSPISSUEDCopper Services10/03/2017
BISPLISSUEDCopper Services07/12/2017
BISFPISSUEDReliable Fire Protection06/30/2017
BISEQISSUEDAdvanced Scaffold Service06/20/2017
BISFPISSUEDUnited Fire Protection05/19/2017
BIS—ISSUEDCad Signs NYC04/28/2017
BIS—ISSUEDCad Signs NYC04/28/2017
BIS—ISSUEDTru-Art Sign Co03/09/2017
BIS—ISSUEDTru-Art Sign Co03/09/2017
BIS—ISSUEDTru-Art Sign Co03/09/2017
BIS—ISSUEDTru-Art Sign Co03/09/2017
BISSPISSUEDCapitol Fire Sprinkler Co01/19/2017
BISOTISSUEDDGC Capital Contracting12/20/2016
BISOTISSUEDDGC Capital Contracting12/20/2016
BISMHISSUEDDGC Capital Contracting12/20/2016
BISMHISSUEDG.B.C11/30/2016
BISOTISSUEDG.B.C11/30/2016
BISOTISSUEDG.B.C11/30/2016
BIS—ISSUEDL.S. Sign Co11/15/2016
BIS—ISSUEDL.S. Sign Co11/15/2016
BIS—ISSUEDL.S. Sign Co11/15/2016
BIS—ISSUEDL.S. Sign Co11/15/2016
+ 21 more permits on file
1 project · most recent 11/13/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2025Permit IssuedCas EquipmentHeating and Air Conditioning Systems
Heat / Cool
Addison MIOC0180AJ2ACA016 173,000 BTU · Ahu ×2
MIOC0300AJ2ACA016 284,000 BTU · Ahu ×1
5 projects · most recent 05/08/2026
General Wiring
FiledStatusContractorScope
05/08/2026CompleteC.M. Richey Electrical ContractingGeneral Wiring
08/18/2023CompleteC.M. Richey Electrical ContractingGeneral Wiring
04/18/2022CompleteSigns Cad—
09/12/2021CompleteSRM Electrical Services—
07/31/2020CompletePoc Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Final—progress
07/21/2026Final—progress
04/13/2026Public Assembly Emergency LightingSTEVEN GAMBINOprogress
11/12/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
11/12/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
11/12/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
09/30/2025Mechanical SystemsYoung Suhspecial
09/30/2025FinalYoung Suhprogress
06/24/2024FinalKenneth Parkprogress
08/30/2023FinalAHMED SHAABANprogress
06/26/2023Post-installed AnchorsXianzhang Chenspecial
06/26/2023Concrete - Cast-In-PlaceXianzhang Chenspecial
06/26/2023Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
06/13/2023FinalXianzhang Chenprogress
04/25/2023FinalKenneth Parkprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Whole Foods MarketSupermarketCellar, Floor 1
Project M01295612 Alteration · Permit Entire · 11/13/2025
Project M00346095 Alteration · LOC Issued · 06/16/2020
H&M HarlemRetailFloors 1, 2
Project M00890614 Alteration · LOC Issued · 06/30/2023
H&M Store No. US0759RetailFloors 1, 2
Project M00864496 Alteration · LOC Issued · 06/06/2023
Krab Queenz Seafood & DaiqurisRestaurant / Food ServiceFloor 2
Project M00707623 Alteration · LOC Issued · 04/18/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,505 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/02/2026M00707623-I1Request digital key ↗
08/31/2026M00864496-I1Request digital key ↗
08/30/2026M00890614-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026M01386318-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00346095-I1Request digital key ↗
▸Applications & Permits300
▸BISPLAN / WORK APPROVAL APPLICATION184
12/04/2024121328134Open ↗
12/03/2024121328134Open ↗
11/27/2024121328134Open ↗
Showing 3 of 184 on file for this type
▸BISWORK PERMIT APPLICATION112
11/26/2021122574179Open ↗
11/04/2021140165372Open ↗
06/17/2020140899614Open ↗
Showing 3 of 112 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications362
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION221
03/23/2020123153256Open ↗
03/23/2020123153256Open ↗
12/30/2019122574179Open ↗
Showing 3 of 221 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT51
06/15/2020140899614Open ↗
01/31/2018123153256Open ↗
Showing 2 of 51 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST47
01/31/2018123153256Open ↗
Showing 1 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00707623-I1Open ↗
08/31/2026M00864496-I1Open ↗
08/30/2026M00890614-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M01295612-I1Open ↗
09/23/2026M01295612-I1Open ↗
09/06/2026M00864496-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/15/2020140899614Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/15/2020140899614Open ↗
Showing 1 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01295612-I1Open ↗
08/24/2026M00890057-I1Open ↗
▸Trade Schedules & Equipment160
▸BISEQUIPMENT USE PERMITS32
10/17/2019121328134Open ↗
10/17/2019121328134Open ↗
10/17/2019121328134Open ↗
Showing 3 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT22
10/17/2019121328134Open ↗
10/17/2019121328134Open ↗
10/17/2019121328134Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING21
10/20/2022140165372Open ↗
Showing 1 of 21 on file for this type
▸BISSIGN HANGER CERTIFICATE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
06/16/2022123514036Open ↗
05/17/2018122537923Open ↗
04/30/2018122949435Open ↗
Showing 3 of 8 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/01/2021121328134Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/13/2022122574179Open ↗
▸Environmental & Asbestos24
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED8
06/15/2020140899614Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/13/2026M01295612-I1Open ↗
08/13/2026M00890050-I1Open ↗
08/13/2026M00890048-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M00890048-I1Open ↗
08/13/2026M00890057-I1Open ↗
08/13/2026M00890050-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
11/03/2021140429409Open ↗
11/04/2020140899614Open ↗
03/23/2020123153256Open ↗
▸Energy Compliance68
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
03/23/2020123153256Open ↗
03/23/2020123153256Open ↗
02/14/2018140391261Open ↗
Showing 3 of 41 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
03/23/2020123153256Open ↗
02/14/2018140391261Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
05/04/2022122574179Open ↗
06/17/2020140899614Open ↗
06/15/2020140899614Open ↗
Showing 3 of 7 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
05/13/2022122574179Open ↗
11/04/2020140899614Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
11/04/2020140899614Open ↗
▸BISFENESTRATION AREAS1
05/13/2022122574179Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY13
05/04/2022122574179Open ↗
05/04/2022122574179Open ↗
11/03/2021140429409Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs128
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST84
05/16/2022122574179Open ↗
11/04/2020140899614Open ↗
07/21/2020123153256Open ↗
Showing 3 of 84 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION25
11/04/2021140165372Open ↗
12/30/2019122574179Open ↗
04/30/2018140657590Open ↗
Showing 3 of 25 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
12/14/2022121328134Open ↗
Showing 1 of 15 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
05/13/2022122574179Open ↗
11/04/2020140899614Open ↗
▸Cost, Insurance & Ownership153
▸BISCOST AFFIDAVIT146
05/04/2022122574179Open ↗
05/04/2022122574179Open ↗
05/04/2022122574179Open ↗
Showing 3 of 146 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/13/2022122574179Open ↗
05/13/2022122574179Open ↗
11/04/2020140899614Open ↗
▸Filing & Intake Forms202
▸BISADDITIONAL INFORMATION85
12/12/2017122972550Open ↗
Showing 1 of 85 on file for this type
▸BISEFILING COVER SHEET70
10/19/2018123514036Open ↗
01/31/2018123153256Open ↗
Showing 2 of 70 on file for this type
▸BISBOROUGH INTAKE FORM32
11/26/2021122574179Open ↗
10/26/2020122574179Open ↗
03/23/2020123153256Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
06/15/2020140899614Open ↗
Showing 1 of 15 on file for this type
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
02/14/2018140391261Open ↗
12/22/2017140657590Open ↗
Showing 2 of 14 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
03/07/2018122704840Open ↗
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type