← Back
BuildNYC
Elevator cooperative
Mark Twain
100 WEST 12TH STREET · West Village · BIN 1010577
💬 Discuss this project
1956Year Built
6Stories
D4Building Class
C1-7Zoning
62,772 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator cooperative · Owner of record: Mark Twain Owners · 17,089 sf lot · 3.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOil to gas conversion2p · 1 filing · 4 docs
Floor 6Unit 5B, Unit 6A, Unit 6B +218p · 6 filings · 20 docs
Floor 5Unit 5G8p · 4 filings · 20 docs
Floor 4Unit 4GHUnder Construction9p · 2 filings · 5 docs
Floor 3Unit 3A, Unit 3B, Unit 3F +225p · 6 filings · 20 docs
Floor 2Unit 2S9p · 4 filings · 20 docs
Floor 1C/O Tf Cornerstone INC.26p · 3 filings · 18 docs
CellarMaxwell-kates, INC.36p · 5 filings · 20 docs
Site & exteriorC/O Tf Cornerstone INC.7p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Marktwain Owners6007/08/2026
Maxwell - Kates903/21/2026
Apt 3R707/08/2026
TF Cornerstone303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRP Construction Group803/21/2026
Brian J Pape Architect403/21/2026
Jenny Flores Expediting303/21/2026
Cavalry203/21/2026
LFNY Consultants203/21/2026
William Vitacco Associates103/21/2026
J A Expediting2003/21/2026
B2 Code Consultants603/21/2026
Tailwind Consultants603/21/2026
Municipal Building Consultants203/21/2026
Nexus Consulting NYC603/21/2026
Process Werkshop603/21/2026
AE Design Solution403/21/2026
Distinct Enterprises203/21/2026
Onzag103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold707/08/2026
Dutchman ContractingGeneral Contractor707/08/2026
Five Star P and H CoPlumbing407/08/2026
Gruda-Ni ConstructionGeneral Contractor303/21/2026
PML RenovationsGeneral Contractor303/21/2026
Quadrant DevelopmentGeneral Contractor307/08/2026
Knights InteriorsGeneral Contractor307/08/2026
Dual Fuel Plumbing & HeatingPlumbing307/08/2026
P.H. WorksPlumbing207/08/2026
Clearcut GroupGeneral Contractor204/09/2026
McCormack ContractingGeneral Contractor203/21/2026
Just Plumbing & HeatingPlumbing207/08/2026
M&M Plumbing & HeatingPlumbing207/08/2026
Monarch Plumbing & HeatingPlumbing206/28/2026
Supreme ElectricElectrical203/21/2026
Associated Electric Cont of NElectrical203/21/2026
Retail Construction ServicesGeneral Contractor107/08/2026
R&R Contracting ManagementGeneral Contractor107/08/2026
Omd ElectricalElectrical103/22/2026
National MaintenanceSign hanger107/08/2026
Marathon MechanicalPlumbing107/08/2026
NY Interior Renovation Group IGeneral Contractor107/08/2026
OnzagGeneral Contractor107/08/2026
Dual Fuel CompanyGeneral Contractor107/08/2026
Lanmar Electric ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
All City Engineering7115305/13/2026
Catalpa Special Inspectio2004109/18/2025
Chun Engineering Consulta9605105/27/2025
Design and Soltuions Stud7953202/20/2025
Skyline Engineering267101/06/2025
Shalat Architects2036211/20/2024
Weppner Architects9333211/01/2024
Group-S5216601/17/2024
Black Box Engineering7196107/17/2023
Studio Nyandak Architectu8378204/19/2023
Integrity Consulting Service666203/15/2023
New Age Engineering7746110/10/2022
Guth Deconzo Consulting E1210101/26/2021
Engineering Solutions, PL6492106/17/2020
Building Lifecycle
All (227)Filed (44)Permit Issued (40)Signed Off (20)Violation (43)Inspection (22)Objection (28)Special Inspection (30)
09/17/2026
Signed off — Alteration
Interior renovation to Kitchen and Bathroom and replacement of fixtures
M01133086-S1
09/15/2026
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT 5G ON THE FIFTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01304493-I1
06/17/2026
Filed — Alteration
Interior renovation to Kitchen and Bathroom and replacement of fixtures
M01133086-P3
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
05/13/2026
Filed — Alteration
Remove existing Gas Service and install New Gas Service in new location as per plans. There is no change of use, egress, or occupancy filed under this plan.
M01310386-P2
04/17/2026
Permit issued — Plumbing
M01133086-S1-PL
04/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Signed off — Alteration
INSTALL (2) NEW SPRINKLER HEADS OFF THE DOMESTIC WATER SERVICE TO COVER EXIST. GAS DRYERS IN THE TENANTS' LAUNDRY AT CELLAR RM. REPLACE CURRENT 3/4 INCH GAS PIPING AND GAS CONNECTIONS TO EXIST. DRYERS IN THE TENANTS' LAUNDRY AT CELLAR.
M01276653-I1
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/10/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/02/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/13/2026
Permit issued — Plumbing
M01340502-S1-PL
02/11/2026
Permit issued — General Construction
M01340502-I1-GC
02/05/2026
Permit issued — Plumbing
M01304493-S1-PL
02/04/2026
Permit issued — General Construction
M01304493-I1-GC
02/03/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
01/20/2026
Filed — Alteration
Remove existing Gas Service and install New Gas Service in new location as per plans. There is no change of use, egress, or occupancy filed under this plan.
M01310386-P1
01/16/2026
Signed off — Alteration
Provide soundproofing to ceiling surfaces, after removing existing plaster or drywall.
M01294715-I1
01/12/2026
Filed — Alteration
INTERIOR COMBINATION AND RENOVATION OF APARTMENT 4GH ON THE FOURTH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01340502-I1
01/12/2026
Filed — Alteration
INTERIOR COMBINATION AND RENOVATION OF APARTMENT 4GH ON THE FOURTH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01340502-S1
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
12/29/2025
Special inspection requirement — Final
XIUCHENG LI
12/22/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
12/12/2025
Permit issued — General Construction
M01294715-I1-GC
12/05/2025
Permit issued — Plumbing
M01310386-I1-PL
11/26/2025
Filed — Alteration
M01294772-I1
11/15/2025
Filed — Alteration
Remove existing Gas Service and install New Gas Service in new location as per plans. There is no change of use, egress, or occupancy filed under this plan.
M01310386-I1
11/12/2025
Filed — Alteration
Provide soundproofing to ceiling surfaces, after removing existing plaster or drywall.
M01294715-I1
11/10/2025
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 5G ON THE FIFTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01304493-I1
11/10/2025
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 5G ON THE FIFTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01304493-S1
11/05/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/30/2025
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
10/17/2025
Special inspection requirement — Final
Aaron McDonald
10/17/2025
Special inspection requirement — Lighting in dwelling units
Aaron McDonald
10/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
10/07/2025
Permit issued — Plumbing
M01276653-I1-PL
09/29/2025
Special inspection requirement — Final
MARY CHANDRAHASAN
09/26/2025
Signed off — Alteration
Interior renovation to Kitchen and Bathroom and replacement of fixtures
M01133086-I1
09/18/2025
Filed — Alteration
INSTALL (2) NEW SPRINKLER HEADS OFF THE DOMESTIC WATER SERVICE TO COVER EXIST. GAS DRYERS IN THE TENANTS' LAUNDRY AT CELLAR RM. REPLACE CURRENT 3/4 INCH GAS PIPING AND GAS CONNECTIONS TO EXIST. DRYERS IN THE TENANTS' LAUNDRY AT CELLAR.
M01276653-I1
09/16/2025
Signed off — Alteration
Filing application for the installation of (2) hot water heaters and (3) storage tanks. All work as per plans filed herewith. No change in use, egress, or occupancy.
M00791810-I1
09/08/2025
Signed off — Alteration
FIling application for the Installation of new boiler and burner in cellar. All work as per plans filed herewith. No change in use, egress, or occupancy.
M00791811-I1
09/08/2025
Signed off — Alteration
M00791809-I1
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
08/24/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
08/22/2025
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT 3F. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00844649-I1
08/12/2025
Permit issued — Plumbing
M00791810-I1-PL
05/27/2025
Filed — Alteration
PROPOSED MINOR RENOVATIONS TO THE EXISTING 2ND FLOOR APARTMENT @2N & 2M. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01183086-I1
04/08/2025
Signed off — Alteration
M01129827-I1
03/14/2025
Permit issued — Sign
M01182764-I1-SG
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2025
Permit issued — General Construction
M00844649-I1-GC
03/06/2025
Filed — Alteration
ERECTT ILLUMINATED WALL SIGN TO READ FEDEX. NOT WITHIN VIEW OF ARTTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01182764-I1
03/05/2025
Objection resolved — Addressed
02/28/2025
Permit issued — General Construction
M01129827-I1-GC
02/28/2025
Special inspection requirement — Final
STEFANIE WERNER
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
STEFANIE WERNER
02/28/2025
Special inspection requirement — Lighting in dwelling units
STEFANIE WERNER
Latest 60 of 227 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMonarch Plumbing & Heating04/17/2026
DOB NOWPlumbingPermit IssuedMohamed Abdelrazek02/13/2026
DOB NOWGeneral ConstructionPermit IssuedClearcut Group02/11/2026
DOB NOWPlumbingPermit IssuedMohamed Abdelrazek02/05/2026
DOB NOWGeneral ConstructionSigned-offClearcut Group02/04/2026
DOB NOWGeneral ConstructionSigned-offR&R Contracting Management12/12/2025
DOB NOWPlumbingPermit IssuedM&M Plumbing & Heating12/05/2025
DOB NOWPlumbingSigned-offM&M Plumbing & Heating10/07/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating08/12/2025
DOB NOWSignPermit IssuedNational Maintenance03/14/2025
DOB NOWGeneral ConstructionSigned-offKnights Interiors03/11/2025
DOB NOWGeneral ConstructionSigned-offRetail Construction Services02/28/2025
DOB NOWPlumbingSigned-offMonarch Plumbing & Heating01/13/2025
DOB NOWGeneral ConstructionSigned-offGruda-Ni Construction01/03/2025
DOB NOWGeneral ConstructionSigned-offMcCormack Contracting12/05/2024
DOB NOWGeneral ConstructionSigned-offKnights Interiors08/29/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating11/16/2023
DOB NOWPlumbingSigned-offP.H. Works11/03/2023
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical06/26/2023
DOB NOWGeneral ConstructionPermit IssuedPML Renovations03/07/2023
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding11/22/2022
DOB NOWGeneral ConstructionSigned-offDual Fuel Company11/15/2022
DOB NOWGeneral ConstructionSigned-offNY Interior Renovation Group I11/08/2022
DOB NOWPlumbingSigned-offP.H. Works11/07/2022
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating10/13/2022
DOB NOWMechanical SystemsSigned-offDutchman Contracting06/14/2022
DOB NOWMechanical SystemsSigned-offDutchman Contracting06/14/2022
DOB NOWPlumbingSigned-offMarathon Mechanical06/10/2022
DOB NOWGeneral ConstructionPermit IssuedOnzag05/27/2022
DOB NOWMechanical SystemsSigned-offDutchman Contracting03/21/2022
DOB NOWPlumbingSigned-offFive Star P and H Co01/28/2022
DOB NOWPlumbingSigned-offFive Star P and H Co01/13/2022
DOB NOWMechanical SystemsSigned-offQuadrant Development02/23/2021
DOB NOWPlumbingSigned-offFive Star P and H Co02/08/2021
DOB NOWMechanical SystemsSigned-offDutchman Contracting02/04/2021
DOB NOWMechanical SystemsSigned-offQuadrant Development08/06/2020
DOB NOWPlumbingSigned-offFive Star P and H Co07/24/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/15/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/14/2018
+ 50 more permits on file
4 projects · most recent 06/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2026Signed-offMonarch Plumbing & HeatingGas, Water/Sanitary
05/13/2026Permit IssuedM&M Plumbing & HeatingGas
01/12/2026Permit IssuedJust Plumbing & HeatingGas, Water/Sanitary
03/15/2023Signed-offRite Plumbing & Heating IGas, Water/Sanitary
20 projects · most recent 03/30/2026
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
03/30/2026Permit IssuedSupreme ElectricGeneral Wiring
02/06/2026Permit IssuedSupreme ElectricGeneral Wiring
02/06/2026Permit IssuedSupreme ElectricGeneral Wiring
06/05/2025CompletePaul M. & Son's Electrical ConGeneral Wiring
06/04/2025CompleteArgon ElectricalGeneral Wiring
03/20/2025Permit IssuedHome Run Electric—
02/07/2025CompleteT. McCaffrey-T. McGovern—
01/23/2025CompleteSupreme Electric—
07/12/2023Permit IssuedUpdate Systems ElectricalGeneral Wiring
06/28/2023Permit IssuedOmd Electrical1 meters, 1 new_meters
02/04/2023CompleteItkin ElectricBoiler Controls
11/17/2022Permit IssuedAbilene Electric—
10/31/2022CompletePrime ElectricalGeneral Wiring
02/15/2022CompleteAgir Electl SolutionGeneral Wiring
12/13/2021CompleteEmelec ElectricGeneral Wiring
1 project · most recent 07/17/2023
FiledStatusContractorScope
07/17/2023——1 scope_items
1 project · most recent 05/13/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/13/2026Permit IssuedM&M Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/02/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/03/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/22/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/05/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/30/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/30/2025Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
06/03/2026Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
12/31/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
12/29/2025FinalXIUCHENG LIprogress
12/29/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
10/17/2025FinalAaron McDonaldprogress
10/17/2025Lighting in dwelling unitsAaron McDonaldenergy_progress
10/17/2025Energy Code Compliance InspectionsAaron McDonaldprogress
09/29/2025FinalMARY CHANDRAHASANprogress
09/02/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
08/24/2025Post-installed AnchorsERIC BERLENTspecial
02/28/2025Fire-Resistance Rated ConstructionSTEFANIE WERNERprogress
02/28/2025Energy Code Compliance InspectionsSTEFANIE WERNERprogress
02/28/2025Lighting in dwelling unitsSTEFANIE WERNERenergy_progress
02/28/2025Fire-Resistant Penetrations and JointsSTEFANIE WERNERspecial
02/28/2025FinalSTEFANIE WERNERprogress
02/19/2025FinalSTEFANIE WERNERprogress
02/19/2025Energy Code Compliance InspectionsSTEFANIE WERNERprogress
02/19/2025Fire-Resistant Penetrations and JointsSTEFANIE WERNERspecial
02/19/2025Lighting in dwelling unitsSTEFANIE WERNERenergy_progress
02/19/2025Fire-Resistance Rated ConstructionSTEFANIE WERNERprogress
02/18/2025FinalJAMES CHUNprogress
02/18/2025Tenant Protection Plan Compliance—special
02/18/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
02/18/2025Energy Code Compliance InspectionsJAMES CHUNprogress
02/18/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
Latest 25 of 81.
▾Documents — 909 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch39
09/06/2026M00902747-I1Request digital key ↗
09/06/2026M00025945-I1Request digital key ↗
09/06/2026M00025951-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00356199-I1Request digital key ↗
09/03/2026M00436604-I1Request digital key ↗
08/15/2026M00436604-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00356403-I1Request digital key ↗
09/04/2026M00441115-I1Request digital key ↗
▸Applications & Permits157
▸BISPLAN / WORK APPROVAL APPLICATION63
12/07/2020140979403Open ↗
02/25/2020122859683Open ↗
02/24/2020122859683Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION50
12/23/2021123922416Open ↗
02/02/2021140979403Open ↗
07/27/2020123910321Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWLPC Approval/Permit40
09/06/2026M00902747-I1Open ↗
08/31/2026M00844649-I1Open ↗
08/25/2026M01133086-P3Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/22/2020123910321Open ↗
06/10/2020123922416Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
02/14/2022123922416Open ↗
▸Seals & Professional Certifications242
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION97
07/27/2020123910321Open ↗
07/27/2020123910321Open ↗
08/05/2019123360852Open ↗
Showing 3 of 97 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/06/2026M00025951-I1Open ↗
09/04/2026M00356199-P1Open ↗
09/04/2026M00356199-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/01/2026M00703205-P1Open ↗
09/23/2026M00791811-I1Open ↗
09/14/2026M00025945-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
10/01/2026M00703205-P1Open ↗
09/23/2026M00791811-I1Open ↗
09/12/2026M00902751-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
12/28/2017140727676Open ↗
Showing 1 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/28/2017140727676Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/07/2020140979403Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/28/2017140727676Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment48
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
02/24/2020122859683Open ↗
02/14/2020122859683Open ↗
09/26/2019122859683Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS7
10/04/2019122399993Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
12/28/2017140727676Open ↗
Showing 1 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes7
06/29/2020123910321Open ↗
06/16/2020123922416Open ↗
02/14/2018123360852Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan6
08/13/2026M00436604-P1Open ↗
08/13/2026M00356199-P1Open ↗
08/13/2026M00356199-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
10/04/2019122399993Open ↗
Showing 1 of 2 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
02/02/2021140979403Open ↗
▸Environmental & Asbestos64
▸DOB NOWDEP ACP-5: Asbestos Assessment Report39
09/06/2026M00902747-I1Open ↗
09/06/2026M00025951-I1Open ↗
09/04/2026M00356199-I1Open ↗
Showing 3 of 39 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
06/10/2020123922416Open ↗
12/28/2017140727676Open ↗
Showing 2 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
02/02/2021140979403Open ↗
06/22/2020123910321Open ↗
08/05/2019123360852Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance49
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
02/14/2018123360852Open ↗
10/11/2017122730223Open ↗
08/22/2017122905936Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
03/17/2021123910321Open ↗
10/04/2019122399993Open ↗
10/11/2017122730223Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
07/20/2022140979403Open ↗
03/17/2021123910321Open ↗
03/17/2021123910321Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/20/2022140979403Open ↗
02/14/2022123922416Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
02/14/2022123922416Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
02/14/2022123922416Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY14
07/20/2022140979403Open ↗
03/17/2021123910321Open ↗
03/17/2021123910321Open ↗
Showing 3 of 14 on file for this type
▸BISHYDRO FLOW TEST LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs93
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST42
07/21/2022140979403Open ↗
02/14/2022123922416Open ↗
10/20/2021122399993Open ↗
Showing 3 of 42 on file for this type
▸BISLANDMARKS APPROVAL36
12/07/2020140979403Open ↗
06/29/2020123910321Open ↗
06/16/2020123922416Open ↗
Showing 3 of 36 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/22/2017122905936Open ↗
08/18/2017122905936Open ↗
Showing 2 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS SIGNOFF2
07/20/2022140979403Open ↗
02/14/2022123922416Open ↗
▸BISFINAL1
02/14/2022123922416Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
06/23/2017140469348Open ↗
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT64
03/17/2021123910321Open ↗
12/07/2020140979403Open ↗
06/29/2020123910321Open ↗
Showing 3 of 64 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/20/2022140979403Open ↗
02/14/2022123922416Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms94
▸BISEFILING COVER SHEET32
06/05/2020123922416Open ↗
05/11/2020123910321Open ↗
02/14/2018123360852Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION30
01/07/2021140979403Open ↗
01/04/2021140979403Open ↗
02/25/2020122859683Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM28
12/23/2021123922416Open ↗
10/20/2021122399993Open ↗
02/24/2020122859683Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/07/2020140979403Open ↗
12/28/2017140727676Open ↗
Showing 2 of 4 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
10/04/2019122399993Open ↗
10/11/2017122730223Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProof of Historic Building2
09/06/2026M00902747-I1Open ↗
08/13/2026M01129827-I1Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type