← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Windsor Park Condominium
100 WEST 58TH STREET · BIN 1023732
💬 Discuss this project
1926Year Built
17Stories
RMBuilding Class
C5-1Zoning
126,196 sfGross Floor Area
105Units
LL97 CoveredRent Stabilized19 Active Violations 4 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 10,017 sf lot · 12.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsInstallation of pipe scaffold2 filings
RoofWindsor Park Condominium6p · 2 filings · 9 docs
BulkheadSuspended scaffold for facade workUnder Construction1p · 1 filing · 5 docs
PenthouseUnit PH1, Unit PH23p · 3 filings · 20 docs
Floor 172 filings · 15 docs
Floor 16Under Construction5p · 2 filings · 16 docs
Floor 15Unit 15A, Unit 15B, Unit 15IUnder Construction11p · 4 filings · 20 docs
Floor 14Unit 14A, Unit 14B, Unit 14C +1Under Construction3p · 4 filings · 20 docs
Floor 13Unit 13AB3p · 2 filings · 9 docs
Floor 12Unit 12B, Unit 12CUnder Construction3p · 3 filings · 20 docs
Floor 11Windsor Park Condominiums1 filing · 5 docs
Floor 10Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 9Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 8Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 7
Floor 6
Floor 5
Floor 4Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 3Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 2Windsor Park Condominiums1p · 1 filing · 5 docs
Floor 1Windsor Pharmacy1p · 1 filing · 7 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction4 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Windsor Tov5703/21/2026
JNYCP11703/21/2026
Winmar Operating1403/21/2026
Morris Pharmacy803/21/2026
Eunate Real Estate NY503/22/2026
Depm307/08/2026
The Chetrit Group307/08/2026
Helmsley303/21/2026
1411-6 Vegetable103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kma Designs203/21/2026
Domani Consulting1003/21/2026
HCN Design203/21/2026
William Vitacco Associates203/21/2026
Socotec403/21/2026
AE Design Solution403/21/2026
A1 Expediting Service203/21/2026
Noel Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1007/08/2026
Project One ElectricElectrical503/21/2026
NY ProconstrucitonGeneral Contractor510/14/2026
RRP PlumbingPlumbing307/19/2026
Signal USAGeneral Contractor307/08/2026
Kings Group NYScaffold309/12/2026
S&E Bridge & ScaffoldScaffold307/08/2026
I & G GroupGeneral Contractor207/08/2026
Folks ElectricalElectrical103/21/2026
Nice PlumbingPlumbing107/08/2026
RRP PlumbingFire Protection107/02/2026
MC SuperstructureScaffold108/26/2026
A.L. ElectricalElectrical103/21/2026
Eco Electrical ServcsElectrical103/22/2026
Project One ElectricElectrical103/22/2026
Levin AlexanderElectrical103/21/2026
Donnelly Mechanicalspecialty_contractor107/08/2026
Apollo Electric NYGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819109/01/2026
SD Testing & Inspection S7010508/18/2026
Framework Engineering8217107/06/2026
Obaid Mian849110/10/2023
Domani Inspection Service843102/09/2023
Socotec Engineering4983107/12/2021
Building Lifecycle
All (224)Filed (36)Permit Issued (27)Signed Off (8)Facade (FISP) (14)Violation (60)Inspection (4)Objection (45)Special Inspection (30)
10/19/2026
Signed off — Alteration
PROPOSE MINOR RENOVATIONS TO EXISTING BATHROOM AS APER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY
M01422556-I1
10/14/2026
Filed — Alteration
REPLACEMENT OF PTAC UNITS LIKE FOR LIKE IN APTS 12B, 14AB,15A,15I
M01336846-P3
10/13/2026
Permit issued — Mechanical Systems
M01336846-S3-MS
10/13/2026
Permit issued — General Construction
M01369935-I1-GC
10/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2026
Permit issued — Suspended Scaffold
M01451948-I1-SC
09/10/2026
Permit issued — Sidewalk Shed
M01366970-I1-SH
09/10/2026
Objection resolved — Resolved
09/01/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01451948-I1
09/01/2026
Objection raised — Scope
08/26/2026
Special inspection requirement — Post-installed Anchors
nayan soni
08/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
08/18/2026
Filed — Alteration
FILING ALT-2 FOR APT 12 C THAT ENCOMPASSES INTERIOR REMOVALS AND RENOVATIONS. THE WORK WILL NCLUDE REPAIR AND REPLACEMENT OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01369935-I1
08/11/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01427951-I1
08/11/2026
Permit issued — Supported Scaffold
M01427951-I1-SF
07/30/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2026
Filed — Alteration
REPLACEMENT OF PTAC UNITS LIKE FOR LIKE IN APTS 12B, 14AB,15A,15I
M01336846-P2
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/17/2026
Permit issued — Plumbing
M01422577-I1-PL
07/16/2026
Permit issued — General Construction
M01422556-I1-GC
07/06/2026
Filed — Alteration
HEREWITH FILING FOR FACADE REPAIRS AND ROOF REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01410964-I1
07/01/2026
Objection raised — Scope
07/01/2026
Objection raised — Inspections
07/01/2026
Objection raised — Structural
07/01/2026
Objection raised — Cost
06/30/2026
Permit issued — Sprinklers
M01330412-S4-EW-SP
06/30/2026
Permit issued — Plumbing
M01330412-S2-PL
06/29/2026
Filed — Alteration
PROPOSE MINOR RENOVATIONS TO EXISTING BATHROOM AS APER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY
M01422556-I1
06/29/2026
Filed — Alteration
PROPOSE MINOR PLUMBING ALTERATIONS TO EXISTING BATHROOM AS PER PLANS FILED HEREWITH.
M01422577-I1
06/26/2026
Permit issued — General Construction
M01330412-I1-GC
06/25/2026
Special inspection requirement — Final
Chi Chung Leung
06/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2026
Permit issued — Sidewalk Shed
M01366970-I1-SH
06/01/2026
Filed — Alteration
FILING ALT-2 FOR THE CONSTRUCTION AT THE 16TH AND 17TH FLOOR PENTHOUSE LEVEL FOR THE REMOVALS AND REPLACEMENT IN KIND OF THE FIRE-DAMAGED PENTHOUSE WALLS AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01396755-I1
05/08/2026
Filed — Alteration
REPLACEMENT OF PTAC UNITS LIKE FOR LIKE IN APTS 12B, 14AB,15A,15I
M01336846-P1
04/16/2026
Filed — Alteration
SPRINKLER WORK FOR PH1 FILED IN CONJUNCTION WITH M01330412-I1
M01330412-S2
04/16/2026
Objection raised — Scope
04/16/2026
Objection raised — Cost
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection raised — Scope
04/15/2026
Filed — Alteration
SPRINKLER WORK FOR PH1 FILED IN CONJUNCTION WITH M01330412-I1
M01330412-S4
04/15/2026
Filed — Alteration
SPRINKLER WORK FOR PH1 FILED IN CONJUNCTION WITH M01330412-I1
M01330412-S3
04/09/2026
Permit issued — Plumbing
M01336846-S1-PL
04/08/2026
Special inspection requirement — Sprinkler Systems
XIUCHENG LI
04/08/2026
Special inspection requirement — Mechanical Systems
04/08/2026
Special inspection requirement — Final
04/07/2026
Filed — Alteration
REPLACING DAMAGED SPRINKLER HEADS/CAPS AS NEEDED FOR SPRINKLER SYSYTEM IN CONJ WITH M01330462-I1
M01330462-S5
04/07/2026
Filed — Alteration
REPLACING DAMAGED SPRINKLER HEADS/CAPS AS NEEDED FOR SPRINKLER SYSYTEM IN CONJ WITH M01330462-I1
M01330462-S3
04/07/2026
Filed — Alteration
REPLACING DAMAGED SPRINKLER HEADS/CAPS AS NEEDED FOR SPRINKLER SYSYTEM IN CONJ WITH M01330462-I1
M01330462-S4
03/30/2026
Permit issued — General Construction
M01336846-I1-GC
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Mechanical Systems
03/24/2026
Special inspection requirement — Sprinkler Systems
03/19/2026
Objection resolved — Addressed
03/18/2026
Signed off — Alteration
Interior Demolition of existing partitions for apt 15B and PH1 as shown on plans.
M00554082-I1
03/17/2026
Objection resolved — Addressed
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNY Proconstruciton10/13/2026
DOB NOWGeneral ConstructionPermit IssuedNY Proconstruciton10/13/2026
DOB NOWSuspended ScaffoldPermit IssuedCitiline Restoration09/25/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/10/2026
DOB NOWSupported ScaffoldPermit IssuedMC Superstructure08/11/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing07/17/2026
DOB NOWGeneral ConstructionPermit IssuedNY Proconstruciton07/16/2026
DOB NOWSprinklersPermit IssuedRRP Plumbing06/30/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing06/30/2026
DOB NOWGeneral ConstructionPermit IssuedNY Proconstruciton06/26/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/09/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing04/09/2026
DOB NOWGeneral ConstructionPermit IssuedNY Proconstruciton03/30/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/05/2026
DOB NOWGeneral ConstructionPermit IssuedSignal USA12/11/2023
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical10/17/2023
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold01/12/2022
DOB NOWGeneral ConstructionSigned-offI & G Group11/12/2021
DOB NOWGeneral ConstructionSigned-offSignal USA09/20/2021
DOB NOWGeneral ConstructionSigned-offI & G Group07/20/2021
DOB NOWGeneral ConstructionSigned-offSignal USA04/19/2021
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold01/29/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/24/2020
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding11/24/2020
DOB NOWPlumbingSigned-offNice Plumbing09/16/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/14/2019
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding11/14/2019
BISOTISSUEDOpc Management07/30/2021
BISOTISSUEDWindsor Park Condominium03/29/2021
BISEQISSUEDS&E Bridge & Scaffold01/27/2021
BISOTISSUEDPreserv BLD Restoration Management09/14/2020
BISOTISSUEDOpc Management08/10/2020
BISPLISSUEDZone Plumbing & Heating06/18/2020
BISEQISSUEDS&E Bridge & Scaffold02/18/2020
BISOTISSUEDPreserv BLD Restoration Management01/08/2020
BISOTISSUEDI & G Group10/24/2019
BISMHISSUEDI & G Group10/24/2019
BISOTISSUEDI & G Group10/24/2019
BISOTISSUEDI & G Group10/24/2019
BISPLISSUEDG. C. Plumbing & Heating08/29/2019
+ 37 more permits on file
3 projects · most recent 10/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Permit IssuedNY ProconstrucitonHeating and Air Conditioning Systems
Heat / Cool
Islandaire ISLANDAIRE #EZ12A116A2B15AA 12,000 BTU · Ptac ×56
ISLANDAIRE #EZ09A116A2B15AA 9,700 BTU · Ptac ×4
ISLANDAIRE, MODEL #EZ15A216A2B15AA 15,000 BTU · Ptac ×4
04/16/2026Permit IssuedNY ProconstrucitonHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48LHZ 48,000 BTU · Condensing Unit ×3
MXZ-SM60NLHZ 60,000 BTU · Condensing Unit ×1
12/06/2024——Heating and Air Conditioning Systems
Heat / Cool
__Junk__ SCROLL - ARUN060GSS4 64,000 BTU · Condensing Unit ×5
SCROLL - ARUN048GSS4 54,000 BTU · Condensing Unit ×2
SCROLL ARUN048GSS4 54,000 BTU · Condensing Unit ×1
4 projects · most recent 10/14/2026
FiledStatusContractorScope
10/14/2026——2 heads
04/16/2026Permit IssuedRRP Plumbing42 heads
04/07/2026——30 heads
12/06/2024——193 heads
5 projects · most recent 10/14/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/14/2026Permit IssuedRRP PlumbingGas, Water/Sanitary
06/29/2026Permit IssuedRRP PlumbingWater/Sanitary
04/16/2026Permit IssuedRRP PlumbingGas, Water/Sanitary
04/07/2026——Water/Sanitary
12/06/2024——Gas, Storm, Water/Sanitary
15 projects · most recent 09/24/2026
General Wiring Lighting
FiledStatusContractorScope
09/24/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
08/27/2026Permit IssuedProject One ElectricGeneral Wiring
02/27/2026Permit IssuedHigh Quality Electric of NYC—
12/31/2025Permit IssuedProject One ElectricGeneral Wiring
12/31/2025Permit IssuedProject One ElectricGeneral Wiring
12/11/2025Permit IssuedProject One ElectricGeneral Wiring
12/11/2025Permit IssuedProject One ElectricGeneral Wiring
12/11/2025Permit IssuedProject One ElectricGeneral Wiring
07/23/2025CompleteGreen Apple Electrical Services—
07/10/2025CompleteApollo Electric InsdusGeneral Wiring
12/01/2021Permit IssuedOmas ElectricGeneral Wiring
01/28/2021CompleteNash Electric Services—
11/23/2020CompleteEco Electrical ServcsGeneral Wiring, Lighting
11/06/2019CompleteTop Shelf Electric—
02/13/2019CompleteEco Electrical Servcs—
2 projects · most recent 06/01/2026
Steel
FiledStatusContractorScope
06/01/2026——1 scope_items
02/25/2025——Steel
2 projects · most recent 08/11/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedMC SuperstructureScaffold
03/04/2026Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 09/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/01/2026Permit IssuedCitiline RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2026Pass-Final Sign Permit InspectionPassView ↗
07/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
08/26/2026Post-installed Anchorsnayan sonispecial
08/26/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
06/25/2026FinalChi Chung Leungprogress
04/08/2026Sprinkler SystemsXIUCHENG LIspecial
04/08/2026Mechanical Systems—special
04/08/2026Final—progress
03/25/2026Final—progress
03/25/2026Mechanical Systems—special
03/24/2026Sprinkler Systems—special
03/10/2026Tenant Protection Plan Compliance—special
03/10/2026Fire-Resistant Penetrations and Joints—special
03/10/2026Final—progress
03/10/2026Energy Code Compliance Inspections—progress
03/10/2026Fire-Resistance Rated Construction—progress
02/12/2026Sprinkler Systems—special
12/08/2025Final—progress
12/08/2025Fire-Resistance Rated Construction—progress
12/08/2025Fire-Resistant Penetrations and Joints—special
12/08/2025Tenant Protection Plan Compliance—special
12/08/2025Energy Code Compliance Inspections—progress
09/09/2024Tenant Protection Plan Compliance—special
09/09/2024Lighting in dwelling units—energy_progress
09/09/2024Interior lighting power—energy_progress
09/09/2024Duct leakage testing, insulation and design—energy_progress
09/09/2024Lighting controls—energy_progress
Latest 25 of 52.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Windsor PharmacyRetailFloor 1
Project M00930246 Alteration · LOC Issued · 10/10/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 822 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch31
09/15/2026M01451948-I1Request digital key ↗
09/03/2026M00497058-P1Request digital key ↗
09/03/2026M00497058-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00263333-I1Request digital key ↗
09/04/2026M00461866-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00263344-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00349692-I1Request digital key ↗
▸Applications & Permits160
▸BISPLAN / WORK APPROVAL APPLICATION80
07/24/2024122401819Open ↗
03/10/2021123771356Open ↗
01/25/2021123597660Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION75
03/29/2021123771356Open ↗
08/10/2020140914740Open ↗
01/09/2020123871783Open ↗
Showing 3 of 75 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
12/10/2018123597660Open ↗
▸Seals & Professional Certifications182
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION81
03/02/2020122456500Open ↗
03/02/2020122456500Open ↗
02/07/2020123449312Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
10/16/2026M01336846-P3Open ↗
09/05/2026M00263333-I1Open ↗
09/05/2026M00263344-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
06/12/2020123597660Open ↗
12/30/2019123771356Open ↗
10/24/2019123449312Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M01422556-I1Open ↗
09/01/2026M00349692-I1Open ↗
08/29/2026M00930246-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
12/30/2019123771356Open ↗
10/24/2019123449312Open ↗
10/23/2019123449312Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01451948-I1Open ↗
09/23/2026M01451948-I1Open ↗
09/06/2026M01330412-S4Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/24/2020140914740Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/24/2020140914740Open ↗
▸Trade Schedules & Equipment67
▸BISSCHEDULE B - PLUMBING25
01/19/2021123597660Open ↗
10/28/2020123597660Open ↗
10/26/2020123597660Open ↗
Showing 3 of 25 on file for this type
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
01/29/2020123449312Open ↗
01/29/2020123449312Open ↗
10/24/2019123449312Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/10/2021123597660Open ↗
02/10/2021123597660Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/10/2021123597660Open ↗
02/09/2021123597660Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes7
06/24/2020140914740Open ↗
12/30/2019123771356Open ↗
05/17/2019123871783Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00263344-I1Open ↗
08/13/2026M00263333-I1Open ↗
08/13/2026M00349692-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/17/2019123871783Open ↗
02/05/2019123597660Open ↗
▸Environmental & Asbestos70
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
10/16/2026M01336846-P3Open ↗
09/03/2026M00497058-P1Open ↗
09/03/2026M00497058-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
06/24/2020140914740Open ↗
05/17/2019123871783Open ↗
12/10/2018123597660Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/07/2020123449312Open ↗
05/17/2019123871783Open ↗
12/28/2018140761156Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
04/15/2021123871783Open ↗
04/15/2021123871783Open ↗
02/09/2021123597660Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
04/15/2021123871783Open ↗
02/09/2021123597660Open ↗
02/07/2020123449312Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/24/2020140914740Open ↗
Showing 1 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
05/31/2023140914740Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/31/2023140914740Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY21
03/25/2022123771356Open ↗
03/25/2022123771356Open ↗
03/25/2022123771356Open ↗
Showing 3 of 21 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/28/2018140761156Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/31/2023140914740Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/31/2023140914740Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/29/2021123771356Open ↗
▸Approvals, Objections & Sign-offs85
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
07/24/2024122401819Open ↗
06/01/2023140914740Open ↗
03/28/2022123771356Open ↗
Showing 3 of 34 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSUPERSEDING LETTER3
03/27/2019123597660Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL3
07/23/2024122401819Open ↗
05/31/2023140914740Open ↗
03/24/2022123771356Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership68
▸BISCOST AFFIDAVIT66
04/15/2021123871783Open ↗
04/15/2021123871783Open ↗
02/09/2021123597660Open ↗
Showing 3 of 66 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/31/2023140914740Open ↗
03/24/2022123771356Open ↗
▸Filing & Intake Forms63
▸BISEFILING COVER SHEET31
12/30/2019123771356Open ↗
05/17/2019123871783Open ↗
12/10/2018123597660Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION15
08/07/2020123597660Open ↗
07/01/2020123597660Open ↗
07/10/2019123597660Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet9
06/24/2020140914740Open ↗
Showing 1 of 9 on file for this type
▸BISBOROUGH INTAKE FORM8
03/02/2020122456500Open ↗
02/07/2020123449312Open ↗
01/29/2020123449312Open ↗
Showing 3 of 8 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
12/27/2018123597660Open ↗
Showing 1 of 10 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
09/15/2026M01451948-I1Open ↗
▸DOB NOWCalculations1
09/15/2026M01451948-I1Open ↗