💬 Discuss this project
1975Year Built
12Stories
I6Building Class
R6Zoning
235,297 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized3 Active Violations 2 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Nursing home · Owner of record: Tcprnc Real Estate · 51,944 sf lot · 4.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBronx Gardens Rehabilitation LLC1 filing
Floor 5The Plaza Rehab & Nursing Center1p · 1 filing · 3 docs
Floor 4The Plaza Rehab & Nursing Center2p · 1 filing · 3 docs
Floor 3The Plaza Rehab & Nursing Center1p · 1 filing · 3 docs
Floor 2The Plaza Rehab & Nursing Center2p · 1 filing · 3 docs
Floor 1The Plaza Rehab & Nursing Center1p · 1 filing · 3 docs
Sub-BasementThe Plaza Rehab & Nursing Center1 filing · 3 docs
Filed — no permit issuedPlaza Rehab & Nursing Center1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jewish Home & Hospital8603/21/2026
Plaza Rehab & Nursing Center2103/21/2026
Bronx Gardens Rehabilitation609/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ventrop Engineering Consulting Group209/15/2026
Edge + Co105/13/2021
Leon Skvirsky PE112/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
City Expediting203/21/2026
Edge + Co Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dunrite ElectricalElectrical203/22/2026
BNK Cooling & Heatingspecialty_contractor203/21/2026
Dunrite ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168209/15/2026
Building Lifecycle
All (109)Filed (4)Permit Issued (1)Facade (FISP) (12)Violation (60)Objection (12)Special Inspection (20)
09/15/2026
Filed — Alteration
Proposed HVAC Electrification, decommissioning of existing equipment and system and installation of new AC Condenser and air handling equipment with new refrigeration lines and wiring as per plans.
X01134363-P1
09/09/2026
Special inspection requirement — Post-installed Anchors
08/12/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
10/28/2025
Violation issued (FDNY_NOV, closed)
04/29/2025
Permit issued — Mechanical Systems
X01134363-I1-MS
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/03/2025
Objection resolved — Addressed
04/03/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/04/2025
Objection raised — Fire_Protection
03/04/2025
Objection raised — Admin
03/04/2025
Objection raised — Zoning
03/04/2025
Objection raised — Cost
03/04/2025
Objection raised — Zoning
02/25/2025
Filed — Alteration
Proposed HVAC Electrification, decommissioning of existing equipment and system and installation of new AC Condenser and air handling equipment with new refrigeration lines and wiring as per plans.
X01134363-I1
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
10/29/2024
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
10/29/2024
Special inspection requirement — Final
SOORJBALLY HARILALL
04/03/2024
Violation issued (HPD, closed)
A
03/25/2024
Cycle 9 facade report signed — SWARMP
03/06/2024
Cycle 9 facade inspection completed
01/29/2024
Violation issued (ECB, closed)
Construction
12/13/2023
Cycle 9 facade report submitted
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/13/2021
Filed — Alteration
Interior Demolition to include but not limited to partitions ,ceiling.
X00487678-I1
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
03/17/2021
Special inspection requirement — Final
01/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2019
Objection raised — Admin
12/20/2019
Objection raised — Other
12/16/2019
Filed — Alteration
INSTALL ILLUMINATED DIGITAL LED DIRECTORY SIGN ON WALL.(CHANGEABLE COPY)
X00251530-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBNK Cooling Heating04/29/2025
BISMHISSUEDRoyal Home Improvements12/31/2018
BISOTISSUEDRoyal Home Improvements12/31/2018
BISOTISSUEDRoyal Home Improvements12/31/2018
BISSPISSUEDRightway Plumbing and Heating12/15/2018
BISPLISSUEDBest Mechanical Services12/15/2018
BISOTISSUEDRoyal Home Improvements11/07/2018
BISBLISSUEDHydro Mechanical05/15/2018
BISOTISSUEDRoyal Home Improvements03/01/2018
BISOTISSUEDC C Controlled Combustion11/14/2017
BISPLISSUEDHydro Mechanical11/13/2017
BISBLISSUEDHydro Mechanical11/13/2017
BISOTISSUEDGlobal Home Improvements10/03/2017
BIS—ISSUEDG Construction09/13/2017
BISOTISSUEDGlobal Home Improvements06/13/2017
BISFBISSUEDC C Controlled Combustion04/25/2017
BISFSISSUEDMetropolitan Mechanical04/13/2017
BISBLISSUEDHydro Mechanical01/23/2017
BISBLISSUEDHydro Mechanical08/25/2016
BISPLISSUEDHydro Mechanical08/25/2016
BISSPISSUEDJewish Home Life Care11/20/2015
BISSPISSUEDExpert Fire Sprinkler10/02/2015
BISSPISSUEDExpert Fire Sprinkler10/02/2015
BISFPISSUEDCurrent Fire Protection04/16/2015
BISFPISSUEDCurrent Fire Protection04/16/2015
BISBLISSUEDHydro Mechanical01/15/2015
BISPLISSUEDHydro Mechanical01/15/2015
BISBLISSUEDHydro Mechanical01/02/2015
BISSPISSUEDExpert Fire Sprinkler06/10/2014
BISSPISSUEDExpert Fire Sprinkler06/10/2014
BISSPISSUEDIrwin Friedman & Sons06/03/2014
BISSPISSUEDIrwin Friedman & Sons06/03/2014
BISMHISSUEDLeonardo Jaramillo01/23/2014
BISOTISSUEDAndron Construction12/02/2013
BISPLISSUEDEnterprise Plumbing & Heating09/17/2013
BISMHISSUEDAndron Construction07/26/2013
BISOTISSUEDAndron Construction07/26/2013
BIS—ISSUEDAndron Construction07/24/2013
BISOTISSUEDFarms Communications Svce07/16/2013
BISPLISSUEDWhitestone Plumbing05/23/2013
+ 11 more permits on file
1 project · most recent 09/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Signed-offBNK Cooling & HeatingHeating and Air Conditioning Systems
Heat / Cool
Samsung AM144BXVGFH/AA 144,000 BTU · Vrf Outdoor ×42
AM036TXMDCH/AA 38,000 BTU · Vrf Outdoor ×12
AM096BXVGFH/AA 96,000 BTU · Vrf Outdoor ×4
AM168BXVGFH/AA 168,000 BTU · Vrf Outdoor ×3
AM048NXMDCR/AA 48,000 BTU · Vrf Outdoor ×1
Aaon RNA-018 373,800 BTU · Rooftop Unit ×4
RNA-030 519,800 BTU · Rooftop Unit ×2
CFA-030 314,600 BTU · Rooftop Unit ×1
Mitsubishi Electric MXZ-SM36NAMHZ2 36,000 BTU · Heat Pump Outdoor ×12
PUHY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×2
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×2
MXZ-SM48NAMHZ2 48,000 BTU · Heat Pump Outdoor ×1
PUHY-EP168TNU-A1 168,000 BTU · Vrf Outdoor ×1
2 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025Permit IssuedDunrite ElectricalGeneral Wiring
09/05/2018CompleteNet Power ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/09/2026Post-installed Anchors—special
08/12/2026Mechanical SystemsSOORJBALLY HARILALLspecial
08/12/2026FinalSOORJBALLY HARILALLprogress
08/12/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
08/12/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
08/12/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
08/12/2026Shutoff dampersSOORJBALLY HARILALLenergy_progress
08/12/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
08/12/2026Duct leakage testing, insulation and designSOORJBALLY HARILALLenergy_progress
08/12/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/05/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
10/30/2024HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
10/30/2024Maintenance informationSOORJBALLY HARILALLenergy_progress
10/30/2024HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
10/30/2024Shutoff dampersSOORJBALLY HARILALLenergy_progress
10/30/2024Duct leakage testing, insulation and designSOORJBALLY HARILALLenergy_progress
10/30/2024HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
10/29/2024Mechanical SystemsSOORJBALLY HARILALLspecial
10/29/2024FinalSOORJBALLY HARILALLprogress
03/17/2021Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Plaza Rehab & Nursing CenterMedical / HealthcareSub-basement, Floors 1–5
Project X00487678 Alteration · Approved · 05/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 723 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/25/2026X00487678-I1Request digital key ↗
08/20/2026X01134363-P1Request digital key ↗
08/20/2026X01134363-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/15/2026X00251530-I1Request digital key ↗
▸Applications & Permits145
▸BISPLAN / WORK APPROVAL APPLICATION80
12/16/2020220241209Open ↗
09/23/2020220241209Open ↗
09/23/2020220241209Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION56
01/02/2019240216459Open ↗
01/02/2019220519311Open ↗
01/02/2019240217298Open ↗
Showing 3 of 56 on file for this type
▸BISPLACE OF ASSEMBLY4
09/07/2018220241192Open ↗
Showing 1 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
02/16/2024200014206Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL - TWO (2) OPEN DOBNOW APPLICATIONS..#X00251530 - OBJECTIONS STATUS.. &X00342332 - PERMIT ENTIRE STATUS... BOTH APPLICATIONS MUST BE IN SIGNOFF OR COMPLETED STATUS FOR FINAL CO1
12/11/2020220241209Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT I: CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY TAX LOT1
08/20/2020220241209Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/20/2020220241209Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications92
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
11/07/2019220519311Open ↗
11/07/2019220519311Open ↗
11/07/2019240216459Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026X00251530-I1Open ↗
08/25/2026X00487678-I1Open ↗
08/20/2026X01134363-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X01134363-P1Open ↗
09/23/2026X01134363-P1Open ↗
08/31/2026X01134363-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/23/2018240217298Open ↗
03/22/2018240216459Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X01134363-P1Open ↗
08/31/2026X01134363-I1Open ↗
▸Trade Schedules & Equipment101
▸BISEQUIPMENT USE PERMITS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING16
09/10/2019240217298Open ↗
04/17/2019240217298Open ↗
01/07/2019240217298Open ↗
Showing 3 of 16 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA11
11/20/2019220657171Open ↗
Showing 1 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
02/12/2018220177305Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL - FOUR (4) OPEN DOB ELEVATOR VIOLATIONS1
12/11/2020220241209Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
03/23/2018240217298Open ↗
03/22/2018240216459Open ↗
02/27/2018220519311Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00487678-I1Open ↗
08/20/2026X01134363-P1Open ↗
08/20/2026X01134363-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
11/07/2019220519311Open ↗
11/07/2019220519311Open ↗
11/07/2019240216459Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
11/07/2019220519311Open ↗
11/07/2019240216459Open ↗
11/07/2019240217298Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/15/2018240217298Open ↗
11/07/2018240216459Open ↗
03/23/2018240217298Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY8
12/15/2018240217298Open ↗
11/07/2018240216459Open ↗
06/01/2018240216459Open ↗
Showing 3 of 8 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
11/08/2018240217298Open ↗
Showing 1 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/07/2019220519311Open ↗
11/07/2019240216459Open ↗
▸BISDEP Hydrant Flow Test Letter1
11/08/2018240217298Open ↗
▸Approvals, Objections & Sign-offs107
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST66
12/30/2020220241209Open ↗
12/11/2020220241209Open ↗
09/09/2020220241209Open ↗
Showing 3 of 66 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION21
11/08/2018240217298Open ↗
10/25/2018240216459Open ↗
07/25/2018240216459Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
12/16/2020220241209Open ↗
09/17/2018220241209Open ↗
09/17/2018220241209Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
03/02/2018220519311Open ↗
▸Cost, Insurance & Ownership66
▸BISCOST AFFIDAVIT66
11/20/2019220657171Open ↗
11/07/2019220519311Open ↗
11/07/2019240216459Open ↗
Showing 3 of 66 on file for this type
▸Filing & Intake Forms90
▸BISADDITIONAL INFORMATION39
12/11/2020220241209Open ↗
09/09/2020220241209Open ↗
08/20/2020220241209Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING COVER SHEET27
11/26/2018220657171Open ↗
Showing 1 of 27 on file for this type
▸BISBOROUGH INTAKE FORM19
03/09/2020220241209Open ↗
12/03/2019220241209Open ↗
11/20/2019220657171Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
03/23/2018240217298Open ↗
03/22/2018240216459Open ↗
Showing 2 of 5 on file for this type
▸Other Documents14
▸BISPLOT DIAGRAM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISOP-4 - Special Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL SURVEY STATEMENT1
07/20/2020220241209Open ↗
▸BISFINAL - SUBMIT CITY PLANNING1
09/09/2020220241209Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
08/19/2020220241209Open ↗
▸BISFINAL - SUBMIT1
12/11/2020220241209Open ↗