← Back
BuildNYC
Elevator apt, semi-fireproof without stores
100 WOODRUFF AVENUE
BROOKLYN · BIN 3116106
💬 Discuss this project
1941Year Built
6Stories
D1Building Class
R7-1Zoning
98,681 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized52 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 100 Realty Associates · 21,907 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 61 filing · 16 docs
Floor 5Unit 5E, Unit 5S4p · 2 filings · 16 docs
Floor 41 filing · 16 docs
Floor 31 filing · 16 docs
Floor 21 filing · 16 docs
Floor 1Unit 1F, Unit 1G4p · 2 filings · 16 docs
Cellar1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
100 Realty Co403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Baobab Architects606/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XYZ Code Consulting503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Impact BuildersGeneral Contractor303/21/2026
High Standard ElectricElectrical103/22/2026
Lloyd G Drummond Plumbing & GenPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129606/01/2023
Doyun Kim; RA7415110/07/2022
Building Lifecycle
07/15/2026
Elevator Category 1 inspection report filed
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/30/2026
Boiler inspection report filed
Subsequent · no defects · Accepted
04/21/2026
Boiler inspection report filed
Initial · defects found · Accepted
04/14/2026
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR…
HPD violation · closed
248 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedImpact Builders02/16/2023
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen10/18/2022
BISOTISSUEDImpact Builders08/09/2022
1 project · most recent 10/25/2022
General Wiring
FiledStatusContractorScope
10/25/2022CompleteHigh Standard ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/09/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
06/09/2023Interior lighting powerNANIK MASSANDenergy_progress
06/09/2023Tenant Protection Plan ComplianceNANIK MASSANDspecial
06/09/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/09/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
06/09/2023Lighting controlsNANIK MASSANDenergy_progress
06/01/2023Tenant Protection Plan Compliance—special
05/16/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
05/16/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
05/16/2023Interior lighting powerNANIK MASSANDenergy_progress
05/16/2023Lighting controlsNANIK MASSANDenergy_progress
05/16/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
05/04/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
05/04/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
05/04/2023Tenant Protection Plan Compliance—special
05/04/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
05/04/2023Interior lighting powerNANIK MASSANDenergy_progress
05/04/2023Lighting controlsNANIK MASSANDenergy_progress
04/19/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
04/19/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/19/2023Tenant Protection Plan Compliance—special
04/19/2023Interior lighting powerNANIK MASSANDenergy_progress
04/19/2023Lighting controlsNANIK MASSANDenergy_progress
04/19/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
04/03/2023Lighting controlsNANIK MASSANDenergy_progress
Latest 25 of 31.
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account