← Back
Parks / recreation facility
1000 5 AVENUE
MANHATTAN · BIN 1809193
💬 Discuss this project
0Year Built
—Stories
Q1Building Class
PARKZoning
34,025 sfGross Floor Area
0Units
12 Open Violations 5 unresolved · 7 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 36,590,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 401p · 1 filing · 17 docs
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction19p · 12 filings · 20 docs
Mezzanine9p · 4 filings · 20 docs
2 jobs · most recent 07/06/2026
Generators Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Signed-offYORKE CONSTRUCTION CORPGenerators
Generators
Cummins Model C100D6C 100 kW · Generator ×1
11/02/2022Signed-offYORKE CONSTRUCTION CORPAir Conditioning Systems, Ventilation Systems
Cooling
Lg ARUB060GSS4 51,900 BTU · Vrf Outdoor ×2
ARUM144BTE5 123,500 BTU · Vrf Outdoor ×1
ARUM192BTE5 164,100 BTU · Vrf Outdoor ×1
Liebert MCS028E1 65,100 BTU · Crac Unit ×1
PX018UA12 65,100 BTU · Split System ×1
Trane 4TTL6036A1 35,000 BTU · Heat Pump Outdoor ×1
4TTL6060A1 56,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck USF-08-B2 400 CFM · Exhaust Fan ×2
USF-33-B4 10,000 CFM · Exhaust Fan ×2
USF-04-B3 200 CFM · Exhaust Fan ×1
USF-12-B1 400 CFM · Exhaust Fan ×1
USF-15-F1 2,000 CFM · Exhaust Fan ×1
1 job · most recent 11/02/2022
FiledStatusContractorScope
11/02/2022Signed-offMACCARONE PLUMBING INC276 heads, 1 outlets
1 job · most recent 05/30/2024
Storm Water/Sanitary
FiledStatusContractorScope
05/30/2024Signed-offJCC CONSTRUCTION CORPStorm, Water/Sanitary
6 jobs · most recent 08/04/2026
General Wiring Lighting
FiledStatusContractorScope
08/04/2026CompleteCANDELA SYSTEMS CORP DBAGeneral Wiring, Lighting
05/15/2025CompleteTEAM ELECTRIC, INCGeneral Wiring
06/27/2024CompleteTEAM ELECTRIC, INC—
10/19/2023CompleteCANDELA SYSTEMS CORP DBA—
04/10/2023Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
10/18/2022CompleteQUEUE ELEC'L CONTRS, INC—
2 jobs · most recent 12/30/2025
Steel Concrete
FiledStatusContractorScope
12/30/2025Signed-offYORKE CONSTRUCTION CORPSteel, Concrete
12/30/2025Signed-offYORKE CONSTRUCTION CORP2 scope_items
Building Lifecycle
All (169)Filed (38)Permit Issued (38)Signed Off (11)Inspection (24)Objection (28)Special Inspection (30)
09/01/2026
Signed off — Alteration
INSTALL A NEW SELF-CONTAINED OUTDOOR EMERGENCY GENERATOR.
M01418498-I1
08/26/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR THE CONSTRUCTION OF A HYDRODYNAMIC SPEARATOR UNIT WITH ASSOCIATED PIPING TO CONNECT TO THE EXISTING DRAINAGE SYSTEM, AND THE INSTALLATION OF NEW COMBINED WATER SERVICE. NO CHANGE TO USE GROUP, EGRESS OR OCCUPANCY.
M08031619-I1
08/25/2026
Signed off — Alteration
M08031154-I1
08/24/2026
Permit issued — Boiler Equipment
M01418536-I1-BE
08/17/2026
Filed — Alteration
Application filed herewith to reconstruction and expansion of the existing pavers surrounding the structure to be renovated, and installation of permeable pavers, and trenching and paving for new utilities. No change to use, egress or occupancy.
M08031630-P3
08/11/2026
Filed — No Work
M01440552-I1
07/16/2026
Permit issued — Mechanical Systems
M01418498-I1-MS
07/13/2026
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
07/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CONNIE PISANI
07/13/2026
Special inspection requirement — Final
CONNIE PISANI
07/06/2026
Filed — Alteration
INSTALL A NEW SELF-CONTAINED OUTDOOR EMERGENCY GENERATOR.
M01418498-I1
07/06/2026
Filed — Alteration
INSTALL A FUEL STOAGE ASSOCIATED WITH THE OUTDOOR GENERATOR.
M01418536-I1
06/17/2026
Special inspection requirement — Final
CONNIE PISANI
06/17/2026
Special inspection requirement — Mechanical Systems
CONNIE PISANI
06/17/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
CONNIE PISANI
06/08/2026
Signed off — Alteration
Demolition and replacement of mechanical systems within bowl area. New mechanical systems to include but no limited to: VRF heating & cooling systems, split systems to provide cooling to utility rooms, DOAS units to provide ventilation and exhaust.
M08031175-I1
05/27/2026
Signed off — Alteration
APPLICATIONS FILED FOR INSTALLATION OF NEW SPRINKLER HEADS CONNECTING TO NEW DRY STANDPIPE. SPRINKLER BOOSTER PUMP WILL BE PROVIDED TO PROVIDE ADEQUATE SUPPLY FOR THE DRY SPRINKLERSYSTEMS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M08031176-I1
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/12/2026
Objection raised — Other
05/12/2026
Objection raised — Other
05/12/2026
Objection raised — Other
05/11/2026
Filed — No Work
M01399641-I1
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
04/23/2026
Special inspection requirement — Deep Foundation Elements
CONNIE PISANI
04/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Marc Gallagher
04/23/2026
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
04/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
04/23/2026
Special inspection requirement — Footing and Foundation
CONNIE PISANI
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
04/23/2026
Special inspection requirement — Final
CONNIE PISANI
03/26/2026
Objection resolved — Addressed
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Objection raised — Admin
02/09/2026
Objection resolved — Addressed
01/21/2026
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/21/2026
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/21/2026
Special inspection requirement — Masonry
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
01/21/2026
Special inspection requirement — Lowest Floor Elevation
CONNIE PISANI
01/21/2026
Special inspection requirement — Final
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Cold-Formed Steel
CONNIE PISANI
01/20/2026
Objection raised — Scope
12/30/2025
Filed — Alteration
Structural Modifications to the public, Delacorte theatre. No change in use, egress, or occupancy.
M08031171-P1
12/30/2025
Filed — Alteration
Foundation renovation of existing theater. No change to use, egress or occupancy.
M00831339-P2
12/23/2025
Signed off — Alteration
M01164742-I1
12/08/2025
Permit issued — Structural
M01164742-I1-ST
12/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2025
Special inspection requirement — Footing and Foundation
CONNIE PISANI
12/02/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
12/02/2025
Special inspection requirement — Final
CONNIE PISANI
12/02/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
11/13/2025
Permit issued — Earth Work
M08031630-I1-EA
Latest 60 of 169 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YORKE CONSTRUCTION103/22/2026
CITY OF NEW YORK PARKS RECREAT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.6603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YORKE CONSTRUCTION CORPGeneral Contractor3007/17/2026
MACCARONE PLUMBING INCFire Protection607/08/2026
ASPRO PLUMBING INCPlumbing307/08/2026
JCC CONSTRUCTION CORPPlumbing207/08/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
QUEUE ELEC'L CONTRS, INCElectrical103/22/2026
CANDELA SYSTEMS CORP DBAElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC58422708/17/2026
LANGAN ENG, ENV, SURVEYIN1265111/03/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLBG & HTG CORP08/24/2026
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP07/16/2026
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP12/08/2025
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/13/2025
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/13/2025
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP11/12/2025
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP10/17/2025
DOB NOWPlumbingSigned-offASPRO PLUMBING INC09/29/2025
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP09/08/2025
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/05/2025
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP05/30/2025
DOB NOWStandpipeSigned-offMACCARONE PLUMBING INC05/14/2025
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC05/14/2025
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP11/15/2024
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/15/2024
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/15/2024
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP10/23/2024
DOB NOWPlumbingSigned-offASPRO PLUMBING INC10/03/2024
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP09/12/2024
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/11/2024
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP07/30/2024
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC06/13/2024
DOB NOWStandpipeSigned-offMACCARONE PLUMBING INC06/13/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/21/2024
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/14/2023
DOB NOWEarth WorkSigned-offYORKE CONSTRUCTION CORP11/14/2023
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP10/23/2023
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP10/23/2023
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC10/02/2023
DOB NOWStandpipeSigned-offMACCARONE PLUMBING INC09/19/2023
DOB NOWPlumbingSigned-offASPRO PLUMBING INC09/11/2023
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP09/08/2023
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/08/2023
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP07/21/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/06/2022
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP10/05/2022
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP10/05/2022
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP10/05/2022
BISPLISSUEDTAGGART ASSOCIATES10/08/1998
BISMHISSUEDPRINCETON RESTORATION CORP09/17/1998
+ 6 more permits on file
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/31/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/13/2026Subsurface Conditions – Fill Placement & In-Place DensityCONNIE PISANIspecial
07/13/2026Subgrade InspectionsCONNIE PISANIspecial
07/13/2026Excavations - Sheeting, Shoring, and BracingCONNIE PISANIspecial
07/13/2026FinalCONNIE PISANIprogress
06/17/2026FinalCONNIE PISANIprogress
06/17/2026Mechanical SystemsCONNIE PISANIspecial
06/17/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsCONNIE PISANIspecial
04/23/2026Deep Foundation ElementsCONNIE PISANIspecial
04/23/2026Subsurface Investigations (Borings/Test Pits)Marc Gallagherspecial
04/23/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
04/23/2026Subsurface Conditions – Fill Placement & In-Place DensityCONNIE PISANIspecial
04/23/2026Footing and FoundationCONNIE PISANIprogress
04/23/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
04/23/2026FinalCONNIE PISANIprogress
04/23/2026Subgrade InspectionsCONNIE PISANIspecial
01/21/2026Structural Wood FrameCONNIE PISANIprogress
01/21/2026Structural Cold-Formed SteelCONNIE PISANIspecial
01/21/2026Post-installed AnchorsCONNIE PISANIspecial
01/21/2026Structural Steel - High Strength BoltingCONNIE PISANIspecial
01/21/2026Structural Steel - WeldingCONNIE PISANIspecial
01/21/2026MasonryCONNIE PISANIspecial
01/21/2026Structural Steel - DetailsCONNIE PISANIspecial
01/21/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
01/21/2026FinalCONNIE PISANIprogress
01/21/2026Lowest Floor ElevationCONNIE PISANIprogress
Latest 25 of 150.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch33
09/02/2026M00744702-P1Request digital key ↗
09/02/2026M00744702-I1Request digital key ↗
09/02/2026M00744710-P3Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/22/2026M01236845-P1Request digital key ↗
08/22/2026M01236845-I1Request digital key ↗
08/14/2026M01399641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/24/2026M01164599-I1Request digital key ↗
▸Applications & Permits33
▸DOB NOWLPC Approval/Permit33
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
08/19/2026M08031630-P3Open ↗
Showing 3 of 33 on file for this type
▸Seals & Professional Certifications106
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031176-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/25/2026M00744629-P6Open ↗
09/23/2026M08031630-P3Open ↗
09/10/2026M01164742-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026M00744629-P6Open ↗
09/23/2026M08031630-P3Open ↗
09/10/2026M01164742-I1Open ↗
Showing 3 of 33 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031154-I1Open ↗
Showing 3 of 30 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026M00831339-P2Open ↗
08/13/2026M00831339-P1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs71
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031154-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
08/19/2026M08031630-P3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/01/2026M08031154-I1Open ↗
09/01/2026M08031168-I1Open ↗
09/01/2026M08031619-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents8
▸DOB NOWProof of Historic Building8
08/13/2026M08031151-I1Open ↗
08/13/2026M08031151-P1Open ↗
08/13/2026M08031151-P2Open ↗
Showing 3 of 8 on file for this type