← Back
Museum
1000 SNUG HARBOR ROAD
STATEN ISLAND · BIN 5170167
💬 Discuss this project
1903Year Built
3Stories
P7Building Class
PARKZoning
65,530 sfGross Floor Area
13Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Museum · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 2,627,539 sf lot · 0.02 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalOther
Roof1p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DDC1707/08/2026
NYC DEPARTMENT OF DESIGN & CON.103/21/2026
NYC DEPT OF DESIGN CONST103/21/2026
NYC DEPARTMENT OF DESIGN CON103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS803/21/2026
LORING CONSULTING ENGINEERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C. D. E. AIR-CONDITIONINGGeneral Contractor907/08/2026
LOUIS L.BUTTERMARK & SONSPlumbing307/08/2026
DUFFY, STEVENElectrical103/21/2026
STEVEN DUFFYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351403/17/2026
Building Lifecycle
All (10)Filed (7)Signed Off (3)
04/20/2026
Signed off — Alteration
Construction work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback, 3rd floor as indicated on drawings
S08001255-I1
04/16/2026
Signed off — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-I1
04/16/2026
Signed off — Alteration
Plumbing work on the cellar level as indicated on drawings
S08001288-I1
03/17/2026
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-P3
01/20/2026
Filed — Alteration
Remove and Replace existing CHWS/R & steam/Condensate piping for BLDG. (M).
S00883097-P1
08/30/2023
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-P2
06/29/2023
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-I1
06/29/2023
Filed — Alteration
Plumbing work on the cellar level as indicated on drawings
S08001288-I1
06/22/2023
Filed — Alteration
Remove and Replace existing CHWS/R & steam/Condensate piping for BLDG. (M).
S00883097-I1
06/12/2023
Filed — Alteration
Construction work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback, 3rd floor as indicated on drawings
S08001255-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING07/09/2025
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING07/09/2025
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS10/11/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS09/24/2024
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING09/03/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING08/08/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING07/24/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS09/27/2023
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING09/04/2023
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING08/23/2023
BIS—ISSUEDNYC DEPT. OF DESIGN & CONSTRUCTI08/06/2007
1 project · most recent 05/02/2024
HVAC Wiring
FiledStatusContractorScope
05/02/2024CompleteMORALES ELEC'L CONT'G INCHVAC Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/17/2026Shutoff dampersAsma Hashmienergy_progress
03/17/2026Maintenance informationAsma Hashmienergy_progress
03/17/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
03/17/2026Ventilation and air distribution systemAsma Hashmienergy_progress
03/17/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
03/17/2026Mechanical SystemsAsma Hashmispecial
03/17/2026FinalAsma Hashmiprogress
03/17/2026Energy Code Compliance InspectionsAsma Hashmiprogress
03/17/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
03/17/2026Electrical motors and elevatorsAsma Hashmienergy_progress
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Final—progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Mechanical Systems—special
01/16/2026Fire-Resistant Penetrations and Joints—special
01/16/2026Final—progress
01/16/2026HVAC-R and service water piping design and insulation—energy_progress
01/16/2026Mechanical Systems—special
08/29/2023HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/29/2023Electrical motors and elevatorsAsma Hashmienergy_progress
08/29/2023Shutoff dampersAsma Hashmienergy_progress
08/29/2023Ventilation and air distribution systemAsma Hashmienergy_progress
08/29/2023HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/29/2023Maintenance informationAsma Hashmienergy_progress
08/29/2023Mechanical SystemsAsma Hashmispecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Staten Island Children's MuseumEducationCellar, Floors 1–3, Roof
Project S08001279 Alteration · LOC Issued · 06/29/2023
Project S08001288 Alteration · LOC Issued · 06/29/2023
Project S08001255 Alteration · LOC Issued · 06/12/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S08001255-I1Request digital key ↗
08/23/2026S00883097-P1Request digital key ↗
08/23/2026S08001288-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISPLACE OF ASSEMBLY5
08/01/2012520069443Open ↗
08/01/2012520069434Open ↗
06/23/2011520069434Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION4
10/22/2014520069425Open ↗
10/22/2014520069443Open ↗
10/22/2014520069434Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit2
08/13/2026S08001255-I1Open ↗
08/13/2026S08001288-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature22
08/29/2026S08001255-I1Open ↗
08/29/2026S08001255-I1Open ↗
08/29/2026S08001255-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00883097-I1Open ↗
08/23/2026S00883097-P1Open ↗
08/13/2026S08001288-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026S08001255-I1Open ↗
08/24/2026S08001279-P2Open ↗
08/23/2026S08001279-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/23/2026S08001288-I1Open ↗
08/13/2026S08001255-I1Open ↗
▸Energy Compliance2
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)2
08/01/2012520069443Open ↗
08/01/2012520069434Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026S08001255-I1Open ↗
08/13/2026S08001288-I1Open ↗
08/13/2026S08001279-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/23/2026S00883097-P1Open ↗
08/14/2026S00883097-I1Open ↗
08/13/2026S08001255-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/23/2011520069434Open ↗
06/23/2011520069443Open ↗
06/23/2011520069425Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/23/2026S08001255-I1Open ↗
08/23/2026S08001288-I1Open ↗
08/13/2026S08001279-I1Open ↗
▸DOB NOWLandmark Approval3
08/13/2026S08001279-I1Open ↗
08/13/2026S08001279-P3Open ↗
08/13/2026S08001279-P2Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026S08001288-I1Open ↗
08/13/2026S08001255-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/20/2017500907619Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION6
07/30/2012520069425Open ↗
07/30/2012520069443Open ↗
07/30/2012520069434Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026S08001279-P3Open ↗
08/13/2026S08001279-I1Open ↗
08/13/2026S08001279-P2Open ↗