1000M RICHMOND TERRACE
STATEN ISLAND · BIN 5170167
💬 Discuss this project
1903Year Built
3Stories
P7Building Class
PARKZoning
65,530 sfGross Floor Area
13Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Museum · Owner of record: NYC Department of Parks and Recreation · 2,627,539 sf lot · 0.02 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStaten Island Children's Museum1p · 1 filing · 20 docs
Floor 3Staten Island Children's Museum26p · 2 filings · 20 docs
Floor 2Staten Island Children's Museum27p · 2 filings · 20 docs
Floor 1Staten Island Children's Museum28p · 2 filings · 20 docs
CellarStaten Island Children's Museum25p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Goldman Copeland Associates403/17/2026
Loring Consulting Engineers201/20/2026
Building Studio Architects106/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants803/21/2026
Loring Consulting Engineers403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C. D. E. Air-ConditioningGeneral Contractor907/08/2026
Louis L.buttermark & SonsPlumbing307/08/2026
Erin Electrical ContractingElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351403/17/2026
Building Lifecycle
All (62)Filed (7)Permit Issued (10)Signed Off (3)Inspection (4)Objection (8)Special Inspection (30)
04/20/2026
Signed off — Alteration
Construction work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback, 3rd floor as indicated on drawings
S08001255-I1
04/16/2026
Signed off — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-I1
04/16/2026
Signed off — Alteration
Plumbing work on the cellar level as indicated on drawings
S08001288-I1
03/17/2026
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-P3
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
03/17/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
03/17/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
03/17/2026
Special inspection requirement — Ventilation and air distribution system
Asma Hashmi
03/17/2026
Special inspection requirement — Maintenance information
Asma Hashmi
03/17/2026
Special inspection requirement — Electrical motors and elevators
Asma Hashmi
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
03/17/2026
Special inspection requirement — Final
Asma Hashmi
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/26/2026
Special inspection requirement — Final
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/26/2026
Special inspection requirement — Mechanical Systems
01/20/2026
Filed — Alteration
Remove and Replace existing CHWS/R & steam/Condensate piping for BLDG. (M).
S00883097-P1
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
01/20/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
01/20/2026
Special inspection requirement — Final
Asma Hashmi
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
01/20/2026
Special inspection requirement — Electrical motors and elevators
Asma Hashmi
01/20/2026
Special inspection requirement — Ventilation and air distribution system
Asma Hashmi
01/20/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
01/20/2026
Special inspection requirement — Maintenance information
Asma Hashmi
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
01/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/16/2026
Special inspection requirement — Final
01/16/2026
Special inspection requirement — Mechanical Systems
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2025
Permit issued — Mechanical Systems
S08001279-I1-MS
07/09/2025
Permit issued — General Construction
S08001255-I1-GC
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2024
Permit issued — Plumbing
S08001288-I1-PL
09/24/2024
Permit issued — Plumbing
S08001288-I1-PL
09/03/2024
Permit issued — Mechanical Systems
S08001279-I1-MS
08/08/2024
Permit issued — General Construction
S08001255-I1-GC
07/24/2024
Permit issued — General Construction
S08001255-I1-GC
09/27/2023
Permit issued — Plumbing
S08001288-I1-PL
09/04/2023
Permit issued — Mechanical Systems
S08001279-I1-MS
08/30/2023
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-P2
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection resolved — Addressed
08/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
08/29/2023
Special inspection requirement — Electrical motors and elevators
Asma Hashmi
08/23/2023
Permit issued — General Construction
S08001255-I1-GC
07/05/2023
Objection raised — Other
07/05/2023
Objection raised — Scope
07/05/2023
Objection raised — Fire_Protection
07/05/2023
Objection raised — Inspections
06/29/2023
Filed — Alteration
Mechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings
S08001279-I1
06/29/2023
Filed — Alteration
Plumbing work on the cellar level as indicated on drawings
S08001288-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offC. D. E. Air-Conditioning07/09/2025
DOB NOWGeneral ConstructionSigned-offC. D. E. Air-Conditioning07/09/2025
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons10/11/2024
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons09/24/2024
DOB NOWMechanical SystemsSigned-offC. D. E. Air-Conditioning09/03/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. Air-Conditioning08/08/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. Air-Conditioning07/24/2024
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons09/27/2023
DOB NOWMechanical SystemsSigned-offC. D. E. Air-Conditioning09/04/2023
DOB NOWGeneral ConstructionSigned-offC. D. E. Air-Conditioning08/23/2023
BIS—ISSUEDNYC Department of Design & Construction08/06/2007
1 project · most recent 05/02/2024
HVAC Wiring
FiledStatusContractorScope
05/02/2024CompleteMorales Electrical Cont'gHVAC Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
03/17/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
03/17/2026Mechanical SystemsAsma Hashmispecial
03/17/2026Shutoff dampersAsma Hashmienergy_progress
03/17/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
03/17/2026Ventilation and air distribution systemAsma Hashmienergy_progress
03/17/2026Maintenance informationAsma Hashmienergy_progress
03/17/2026Electrical motors and elevatorsAsma Hashmienergy_progress
03/17/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
03/17/2026Energy Code Compliance InspectionsAsma Hashmiprogress
03/17/2026FinalAsma Hashmiprogress
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Final—progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Mechanical Systems—special
01/20/2026Energy Code Compliance InspectionsAsma Hashmiprogress
01/20/2026Mechanical SystemsAsma Hashmispecial
01/20/2026FinalAsma Hashmiprogress
01/20/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
01/20/2026Electrical motors and elevatorsAsma Hashmienergy_progress
01/20/2026Ventilation and air distribution systemAsma Hashmienergy_progress
01/20/2026Shutoff dampersAsma Hashmienergy_progress
01/20/2026Maintenance informationAsma Hashmienergy_progress
01/20/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
01/20/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
01/16/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Staten Island Children's MuseumArts / Culture / EntertainmentCellar, Floors 1–3
Project S08001279 Alteration · LOC Issued · 06/29/2023
Project S08001288 Alteration · LOC Issued · 06/29/2023
Project S08001255 Alteration · LOC Issued · 06/12/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S08001255-I1Request digital key ↗
08/23/2026S00883097-P1Request digital key ↗
08/23/2026S08001288-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISPLACE OF ASSEMBLY5
08/01/2012520069443Open ↗
08/01/2012520069434Open ↗
06/23/2011520069434Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION4
10/22/2014520069425Open ↗
10/22/2014520069443Open ↗
10/22/2014520069434Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit2
08/13/2026S08001255-I1Open ↗
08/13/2026S08001288-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature31
10/09/2026S08001279-P3Open ↗
10/09/2026S08001279-P3Open ↗
10/09/2026S08001279-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/09/2026S08001279-P3Open ↗
08/29/2026S08001255-I1Open ↗
08/24/2026S08001279-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00883097-I1Open ↗
08/23/2026S00883097-P1Open ↗
08/13/2026S08001288-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/23/2026S08001288-I1Open ↗
08/13/2026S08001255-I1Open ↗
▸Energy Compliance2
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)2
08/01/2012520069443Open ↗
08/01/2012520069434Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026S08001279-I1Open ↗
08/13/2026S08001279-P3Open ↗
08/13/2026S08001255-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/23/2026S00883097-P1Open ↗
08/14/2026S00883097-I1Open ↗
08/13/2026S08001255-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/23/2011520069434Open ↗
06/23/2011520069443Open ↗
06/23/2011520069425Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/23/2026S08001255-I1Open ↗
08/23/2026S08001288-I1Open ↗
08/13/2026S08001279-I1Open ↗
▸DOB NOWLandmark Approval3
08/13/2026S08001279-P2Open ↗
08/13/2026S08001279-P3Open ↗
08/13/2026S08001279-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026S08001288-I1Open ↗
08/13/2026S08001255-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/20/2017500907619Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION6
07/30/2012520069425Open ↗
07/30/2012520069443Open ↗
07/30/2012520069434Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026S08001279-P3Open ↗
08/13/2026S08001279-I1Open ↗
08/13/2026S08001279-P2Open ↗