1000T RICHMOND TERRACE · BIN 5113037
💬 Discuss this project
1900Year Built
3Stories
P7Building Class
PARKZoning
183,839 sfGross Floor Area
18Units
12 Active Violations 1 unresolved · 11 paperwork only ▸FDNY Report ↗
Museum · Owner of record: NYC Department of Cultural Affairs · 424,460 sf lot · 0.43 FAR built · Flood zone X500
Locations of Work
StructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Temporary pipe scaffold installation8p · 1 filing · 6 docs
Floor 1Temporary pipe scaffold installation8p · 4 filings · 20 docs
CellarTemporary pipe scaffold installation8p · 1 filing · 6 docs
Sub-BasementSnug Harbor Campus Public Buildings1 filing · 7 docs
Site & exterior2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction3610/13/2026
NYC Department of General Services203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York403/21/2026
Loring Consulting Engineers203/21/2026
AE Design Solution603/21/2026
K & M Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NSP EnterprisesScaffold1807/08/2026
Fresh Meadow Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351211/03/2022
Building Lifecycle
All (70)Filed (9)Permit Issued (11)Signed Off (2)Violation (7)Objection (25)Special Inspection (16)
09/20/2026
Objection resolved — Resolved
09/17/2026
Objection raised — Other
09/10/2026
Filed — Alteration
Remove and Replace existing CHWS/R & steam/Condensate piping for BLDG. (T).
S00879763-P1
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/09/2026
Special inspection requirement — Mechanical Systems
09/09/2026
Special inspection requirement — Final
04/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00404547-I1
04/21/2025
Signed off — Alteration
S00171765-I1
08/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
06/22/2023
Filed — Alteration
Remove and Replace existing CHWS/R & steam/Condensate piping for BLDG. (T).
S00879763-I1
05/23/2023
Special inspection requirement — Mechanical Systems
05/23/2023
Special inspection requirement — Final
01/19/2023
Objection raised — Inspections
01/12/2023
Filed — No Work
S00640975-P1
01/06/2023
Special inspection requirement — Public Assembly Emergency Lighting
Asma Hashmi
11/29/2022
Permit issued — Supported Scaffold
S00404547-I1-SF
11/22/2022
Permit issued — Supported Scaffold
S00404547-I1-SF
11/22/2022
Objection raised — Admin
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection raised — Inspections
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection raised — Admin
11/22/2022
Objection resolved — Addressed
11/03/2022
Filed — Alteration
S08015996-I1
11/03/2022
Filed — Alteration
Installation of generator 115 gallon fuel-oil belly tank.
S00721346-I1
10/05/2022
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Asma Hashmi
10/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
10/05/2022
Special inspection requirement — Mechanical Systems
Asma Hashmi
10/05/2022
Special inspection requirement — Final
Asma Hashmi
08/09/2022
Objection resolved — Addressed
04/19/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Asma Hashmi
04/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection resolved — Addressed
02/10/2022
Objection raised — Structural
02/10/2022
Objection raised — Mechanical
02/10/2022
Objection raised — Structural
02/10/2022
Objection raised — Fire_Protection
02/10/2022
Objection raised — Fire_Protection
02/10/2022
Objection raised — Inspections
02/10/2022
Objection raised — Other
02/10/2022
Objection raised — Inspections
01/14/2022
Filed — No Work
S00640975-I1
01/14/2022
Violation issued (ECB, closed)
Construction
12/22/2021
Permit issued — Construction Fence
S00171765-I1-FN
12/22/2021
Permit issued — Supported Scaffold
S00404547-I1-SF
12/02/2021
Special inspection requirement — Public Assembly Emergency Lighting
Asma Hashmi
09/30/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00404547-P1
09/24/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
08/13/2021
Violation issued (ECB, closed)
Unknown
06/07/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offNSP Enterprises11/29/2022
DOB NOWSupported ScaffoldSigned-offNSP Enterprises11/22/2022
DOB NOWConstruction FenceSigned-offNSP Enterprises12/22/2021
DOB NOWSupported ScaffoldSigned-offNSP Enterprises12/22/2021
DOB NOWConstruction FenceSigned-offNSP Enterprises01/07/2021
DOB NOWSupported ScaffoldSigned-offNSP Enterprises01/07/2021
DOB NOWSupported ScaffoldSigned-offNSP Enterprises12/11/2020
DOB NOWConstruction FenceSigned-offNSP Enterprises12/07/2020
DOB NOWSupported ScaffoldSigned-offNSP Enterprises11/05/2020
DOB NOWConstruction FenceSigned-offNSP Enterprises12/06/2019
DOB NOWConstruction FenceSigned-offNSP Enterprises06/14/2019
BIS—ISSUEDNSP Enterprises12/14/2022
BISPLISSUEDLouis L.buttermark & Sons11/03/2022
BISSPISSUEDLouis L.buttermark & Sons03/23/2022
BIS—ISSUEDNSP Enterprises12/22/2021
BIS—ISSUEDNSP Enterprises12/22/2021
BISPLISSUEDLouis L.buttermark & Sons11/17/2021
BISSDISSUEDLouis L.buttermark & Sons01/19/2021
BIS—ISSUEDNSP Enterprises01/06/2021
BIS—ISSUEDNSP Enterprises01/06/2021
BISPLISSUEDLouis L.buttermark & Sons11/18/2020
BISSDISSUEDLouis L.buttermark & Sons01/22/2020
BIS—ISSUEDNSP Enterprises12/06/2019
BIS—ISSUEDNSP Enterprises12/06/2019
BISPLISSUEDLouis L.buttermark & Sons11/21/2019
BIS—ISSUEDNSP Enterprises09/25/2019
BIS—ISSUEDNSP Enterprises09/25/2019
BISOTISSUEDPadilla Construction Services01/17/2004
BISOTISSUEDPadilla Construction Services06/04/2003
BISMHISSUEDKalisch-Jarcho05/22/2003
BISPLISSUEDAce Contracting03/03/2003
BISMHISSUEDKalisch-Jarcho01/08/2003
BISOTISSUEDPadilla Construction Services11/15/2002
BISFPISSUEDGebhardt01/03/2001
BIS—ISSUEDJohn P. Thompson05/15/1997
BISPLISSUEDCapital Contracting P&H02/24/1997
BIS—ISSUEDJohn P. Thompson01/28/1997
3 projects · most recent 10/21/2025
General Wiring
FiledStatusContractorScope
10/21/2025Permit IssuedFresh Meadow Electrical ContractingGeneral Wiring
04/05/2023Permit IssuedFichera ElectricGeneral Wiring
09/19/2019Permit IssuedFresh Meadow Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/09/2026HVAC-R and service water piping design and insulation—energy_progress
09/09/2026Fire-Resistant Penetrations and Joints—special
09/09/2026Mechanical Systems—special
09/09/2026Final—progress
08/29/2023Fire-Resistant Penetrations and Joints—special
07/12/2023HVAC-R and service water piping design and insulation—energy_progress
05/23/2023Mechanical Systems—special
05/23/2023Final—progress
01/06/2023Public Assembly Emergency LightingAsma Hashmiprogress
10/05/2022Emergency and Standby Power Systems (Generator)Asma Hashmispecial
10/05/2022Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/05/2022Mechanical SystemsAsma Hashmispecial
10/05/2022FinalAsma Hashmiprogress
04/19/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsAsma Hashmispecial
04/19/2022Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/02/2021Public Assembly Emergency LightingAsma Hashmiprogress
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
08/23/2026S08015996-I1Request digital key ↗
08/23/2026S00879763-I1Request digital key ↗
08/15/2026S00721346-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/25/2026S00404547-I1Request digital key ↗
08/15/2026S00404547-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026S00640975-P1Request digital key ↗
08/15/2026S00640975-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00171765-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION40
12/23/2025540120778Open ↗
12/02/2025540120778Open ↗
02/23/2023500185346Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION6
01/23/2020540120778Open ↗
01/23/2020540120778Open ↗
11/22/2019520135354Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit3
10/14/2026S00879763-P1Open ↗
08/13/2026S00721346-I1Open ↗
08/13/2026S08015996-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/27/2022520135354Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM2
04/19/2017520135354Open ↗
03/16/2017520135354Open ↗
▸BISVERIFY TAX LOT1
02/25/2026520135354Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/14/2026S00879763-P1Open ↗
08/26/2026S00171765-I1Open ↗
08/24/2026S00640975-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/02/2020540120778Open ↗
04/05/2019520135354Open ↗
04/05/2019520135354Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026S00721346-I1Open ↗
08/28/2026S00721346-I1Open ↗
08/28/2026S08015996-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S00640975-P1Open ↗
08/28/2026S08015996-I1Open ↗
08/27/2026S00640975-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/24/2017540120778Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING11
12/23/2025540120778Open ↗
12/02/2025540120778Open ↗
09/22/2022520135354Open ↗
Showing 3 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/26/2023520359415Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/17/2022520135354Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/17/2022520135354Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/25/2019520135354Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/24/2019520135354Open ↗
▸BISSTREET TREE CHECKLIST1
03/16/2017520135354Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/04/2019520291201Open ↗
04/04/2019540120778Open ↗
04/03/2019520359415Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/14/2026S00879763-P1Open ↗
08/23/2026S08015996-I1Open ↗
08/13/2026S00721346-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/05/2019520135354Open ↗
04/05/2019520135354Open ↗
04/05/2019520135354Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/17/2022520135354Open ↗
11/17/2022520135354Open ↗
03/16/2017520135354Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/17/2022520135354Open ↗
▸BISINTERIOR LIGHTING POWER1
10/31/2025520135354Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/17/2022520135354Open ↗
▸BISFENESTRATION AREAS1
11/17/2022520135354Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/17/2022520135354Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/31/2025520135354Open ↗
▸BISELECTRIC MOTORS1
11/17/2022520135354Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/17/2022520135354Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/17/2022520135354Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/17/2022520135354Open ↗
05/28/2019520135354Open ↗
05/09/2019520135354Open ↗
Showing 3 of 10 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/09/2023520135354Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/07/2022520135354Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/09/2022520135354Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
11/17/2022520135354Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/17/2022520135354Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/07/2022520135354Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/07/2022520135354Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/17/2022520135354Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/07/2022520135354Open ↗
▸BISDEP Hydrant Flow Test Letter1
02/13/2019540120778Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
01/07/2022520135354Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/07/2022520135354Open ↗
▸BISSOIL REPORT1
03/16/2017520135354Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/24/2019520135354Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/16/2017520135354Open ↗
▸BISMECHANICAL SYSTEMS1
11/17/2022520135354Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/24/2019520135354Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
10/14/2026S00879763-P1Open ↗
08/26/2026S00171765-I1Open ↗
08/15/2026S00640975-P1Open ↗
Showing 3 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
03/16/2017520135354Open ↗
03/16/2017520135354Open ↗
03/16/2017520135354Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/20/2023520135354Open ↗
04/06/2017520135354Open ↗
03/13/2017520135354Open ↗
▸BISLetter from Homeowner for Withdrawal2
05/25/2022520359415Open ↗
04/26/2022500531980Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026S08015996-I1Open ↗
08/13/2026S00721346-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/03/2019520359415Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
09/11/2025520135354Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
02/08/2017520135354Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026S00721346-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
04/03/2019520359415Open ↗
02/02/2017520291201Open ↗
01/24/2017540120778Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION9
01/13/2026540120778Open ↗
10/05/2022520135354Open ↗
06/13/2019540120778Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
04/03/2019520359415Open ↗
02/02/2017520291201Open ↗
10/03/2016520135354Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
01/02/2020540120778Open ↗
04/05/2019520135354Open ↗
04/04/2019520291201Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/03/2022520135354Open ↗
02/08/2017520135354Open ↗
02/08/2017520135354Open ↗
▸BISSHUTOFF DAMPERS1
11/17/2022520135354Open ↗
▸BISVESTIBULES1
10/31/2025520135354Open ↗
▸BISMAINTENANCE INFORMATION1
10/31/2025520135354Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/07/2022520135354Open ↗
▸BISUNDERPINNING1
01/07/2022520135354Open ↗