1001 EAST 100TH STREET · Canarsie · BIN 3326732
💬 Discuss this project
1940Year Built
3Stories
W1Building Class
R4Zoning
101,292 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 140,000 sf lot · 0.72 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofI.S. 211 John Wilson, I.S. 211KUnder Construction9p · 2 filings · 20 docs
Floor 3I.S. 211 John Wilson, I.S. 211KUnder Construction20p · 2 filings · 20 docs
Floor 2I.S. 211 John Wilson, I.S. 211KUnder Construction10p · 2 filings · 20 docs
Floor 1I.S. 211 John Wilson, I.S. 211KUnder Construction20p · 2 filings · 20 docs
BasementI.S. 211 John WilsonUnder Construction2p · 1 filing · 20 docs
Sub-BasementI.S. 211 John Wilson, I.S. 211KUnder Construction19p · 2 filings · 20 docs
Site & exteriorI.S. 211 John WilsonUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9010/13/2026
NYC Department of Education903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Velocity Architectural Services PLL1108/25/2026
NYC School Construction202/27/2026
Ame Services111/21/2023
Ysrael A. Seinuk310/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Velocity Architecture & Engineering2403/21/2026
Ame Services203/21/2026
NYC School Construction Authority203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amcon ContractingGeneral Contractor1207/08/2026
Amcon ContractingScaffold707/08/2026
Mar-Sal Plumbing & HeatingPlumbing307/08/2026
I.S.M. ElectricElectrical203/21/2026
Chapman & EvansGeneral Contractor207/08/2026
Rael Automatic Sprinkler CoFire Protection207/03/2026
Nieves WilliamElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Charan Electrical Enterp'sElectrical103/21/2026
Pacific Electrical ContractingElectrical103/22/2026
Pulsar ElectricElectrical103/21/2026
R.M.F. ElectricElectrical103/21/2026
Gemini Electric CoElectrical103/22/2026
J.M.J. ElectricElectrical103/21/2026
Stanco System Electrical ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks3171308/25/2026
Building Lifecycle
All (141)Filed (17)Permit Issued (21)Violation (60)Inspection (1)Objection (12)Special Inspection (30)
09/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2026
Filed — Alteration
Removal and replacement of existing backflow preventers (3), domestic water meters (2), elevator sump pumps (2), drinking fountains (10), wash fountains (2) water closets (3), lavatory (2) from the Basement, 001-003 floors
B00847625-A1
08/24/2026
Objection resolved — Resolved
08/21/2026
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
08/21/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
08/21/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
07/06/2026
Objection raised — Other
06/22/2026
Filed — Alteration
Removal and replacement of existing backflow preventers (3), domestic water meters (2), elevator sump pumps (2), drinking fountains (10), wash fountains (2) water closets (3), lavatory (2) from the Basement, 001-003 floors
B00847625-P8
06/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
06/19/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/03/2026
Permit issued — Plumbing
B00847625-S4-PL
05/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/24/2026
Permit issued — General Construction
B00847625-I1-GC
04/24/2026
Permit issued — Structural
B00847625-S1-ST
04/24/2026
Permit issued — Foundation
B00847625-S5-FO
04/03/2026
Permit issued — Construction Fence
B00962252-I1-FN
03/05/2026
Objection raised — Other
03/05/2026
Objection raised — Other
02/27/2026
Filed — Alteration
K211- REPLACEMENT OF WINDOWS, WINDOW GUARDS, INTERIOR DAMAGES DUE TO WATER INFILTRATION & MASONRY REPAIRS.
B01365053-S1
02/27/2026
Filed — Alteration
K211- REPLACEMENT OF WINDOWS, WINDOW GUARDS, INTERIOR DAMAGES DUE TO WATER INFILTRATION & MASONRY REPAIRS.
B01365053-I1
02/26/2026
Special inspection requirement — Subgrade Inspections
02/26/2026
Special inspection requirement — Post-installed Anchors
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/26/2026
Special inspection requirement — Final
02/26/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
02/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/02/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Heating Systems
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
01/30/2026
Filed — Alteration
Removal and replacement of existing backflow preventers (3), domestic water meters (2), elevator sump pumps (2), drinking fountains (10), wash fountains (2) water closets (3), lavatory (2) from the Basement, 001-003 floors
B00847625-P7
01/30/2026
Special inspection requirement — Heating Systems
MIKHAIL ZEYGMAN
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
01/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
01/30/2026
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
01/30/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
01/15/2026
Permit issued — Sprinklers
B00847625-S3-EW-SP
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Violation issued (FDNY_ORDER, closed)
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
11/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
11/10/2025
Objection resolved — Addressed
10/31/2025
Permit issued — Mechanical Systems
B00847625-S2-MS
10/15/2025
Objection raised — Other
10/14/2025
Filed — Alteration
Removal and replacement of existing backflow preventers (3), domestic water meters (2), elevator sump pumps (2), drinking fountains (10), wash fountains (2) water closets (3), lavatory (2) from the Basement, 001-003 floors
B00847625-P6
10/09/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
10/07/2025
Objection resolved — Addressed
09/10/2025
Violation issued (FDNY_ORDER, closed)
09/10/2025
Violation issued (FDNY_ORDER, closed)
09/10/2025
Violation issued (FDNY_ORDER, closed)
09/10/2025
Violation issued (FDNY_ORDER, closed)
08/29/2025
Objection raised — Other
08/27/2025
Filed — Alteration
Removal and replacement of existing backflow preventers (3), domestic water meters (2), elevator sump pumps (2), drinking fountains (10), wash fountains (2) water closets (3), lavatory (2) from the Basement, 001-003 floors
B00847625-P5
08/07/2025
Objection resolved — Addressed
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMar-Sal Plumbing & Heating06/03/2026
DOB NOWGeneral ConstructionPermit IssuedAmcon Contracting04/24/2026
DOB NOWStructuralPermit IssuedAmcon Contracting04/24/2026
DOB NOWFoundationPermit IssuedAmcon Contracting04/24/2026
DOB NOWConstruction FencePermit IssuedAmcon Contracting04/03/2026
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co01/15/2026
DOB NOWMechanical SystemsPermit IssuedChapman Evans10/31/2025
DOB NOWPlumbingPermit IssuedMar-Sal Plumbing & Heating05/14/2025
DOB NOWFoundationPermit IssuedAmcon Contracting04/30/2025
DOB NOWGeneral ConstructionPermit IssuedAmcon Contracting04/30/2025
DOB NOWStructuralPermit IssuedAmcon Contracting04/30/2025
DOB NOWConstruction FencePermit IssuedAmcon Contracting04/04/2025
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co12/05/2024
DOB NOWMechanical SystemsPermit IssuedChapman Evans12/04/2024
DOB NOWPlumbingPermit IssuedMar-Sal Plumbing & Heating05/14/2024
DOB NOWGeneral ConstructionPermit IssuedAmcon Contracting04/25/2024
DOB NOWStructuralPermit IssuedAmcon Contracting04/25/2024
DOB NOWFoundationPermit IssuedAmcon Contracting04/25/2024
DOB NOWConstruction FencePermit IssuedAmcon Contracting04/02/2024
DOB NOWConstruction FencePermit IssuedAmcon Contracting03/28/2024
DOB NOWConstruction FencePermit IssuedAmcon Contracting12/29/2023
BISOTISSUEDAwl Industries11/15/2018
BISPLISSUEDForsythe P&H05/04/2018
BISPLISSUEDForsythe P&H05/04/2018
BISOTISSUEDNycsca01/30/2018
BISOTISSUEDA C Interior Group07/19/2017
BISMHISSUEDAwl Industries06/19/2017
BISMHISSUEDAwl Industries06/19/2017
BISOTISSUEDAwl Industries06/19/2017
BISPLISSUEDForsythe P&H02/08/2017
BISPLISSUEDForsythe P&H02/08/2017
BISEQISSUEDAwl Industries01/12/2017
BISEQISSUEDAwl Industries01/06/2017
BISMHISSUEDAwl Industries06/16/2016
BISMHISSUEDAwl Industries06/16/2016
BISOTISSUEDAwl Industries06/16/2016
BISEQISSUEDSKY Heights Construction04/28/2016
BISMHISSUEDAwl Industries04/06/2016
BISPLISSUEDForsythe P&H02/08/2016
BISMHISSUEDAwl Industries02/08/2016
+ 31 more permits on file
1 project · most recent 08/25/2026
Water/Sanitary
FiledStatusContractorScope
08/25/2026Permit IssuedMar-Sal Plumbing & HeatingWater/Sanitary
17 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026CompleteA & S Electric—
06/07/2024Permit IssuedTransel Elev. & ElectricGeneral Wiring
03/26/2024Permit IssuedPacific Electrical Contracting—
02/28/2024Permit IssuedAce Electrical ConstructionGeneral Wiring
02/19/2024Permit IssuedStatic ElectricGeneral Wiring
07/07/2022Permit IssuedGemini Electric CoGeneral Wiring
07/07/2022CompleteCharan Electrical Enterp's—
07/27/2021CompleteCharan Electrical Enterp's—
02/11/2021CompleteCharan Electrical Enterp's—
07/07/2020CompleteCharan Electrical Enterp's—
01/28/2020CompleteCharan Electrical Enterp's—
09/12/2019Permit IssuedOmd ElectricalGeneral Wiring
07/10/2019CompleteCharan Electrical Enterp'sGeneral Wiring
02/12/2019CompleteCharan Electrical Enterp'sGeneral Wiring
08/31/2018CompleteCharan Electrical Enterp's—
2 projects · most recent 08/25/2026
Concrete Masonry
FiledStatusContractorScope
08/25/2026Permit IssuedMar-Sal Plumbing & HeatingConcrete
02/27/2026——Concrete, Masonry
1 project · most recent 11/21/2023
Fence
FiledStatusContractorScope
11/21/2023Permit IssuedAmcon ContractingFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/21/2026Sprinkler SystemsMIKHAIL ZEYGMANspecial
08/21/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
08/21/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
08/21/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/19/2026Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
06/19/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/19/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
06/11/2026Fire-Resistant Penetrations and Joints—special
05/22/2026Excavations - Sheeting, Shoring, and Bracing—special
02/26/2026Subgrade Inspections—special
02/26/2026Post-installed Anchors—special
02/26/2026Fire-Resistant Penetrations and Joints—special
02/26/2026Final—progress
02/26/2026Wall Panels, Curtain Walls, and Veneers—special
02/26/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/02/2026FinalMIKHAIL ZEYGMANprogress
02/02/2026Heating SystemsMIKHAIL ZEYGMANspecial
02/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
02/02/2026Mechanical SystemsMIKHAIL ZEYGMANspecial
02/02/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
01/30/2026Heating SystemsMIKHAIL ZEYGMANspecial
01/30/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
01/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
01/30/2026Mechanical SystemsMIKHAIL ZEYGMANspecial
01/30/2026FinalMIKHAIL ZEYGMANprogress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 211KEducationSub-basement, Floors 1–3, Roof
Project B01365053 Alteration · Approved · 02/27/2026
I.S. 211 John WilsonEducationSub-basement, Floors 1–3, Roof
Project B00962252 Alteration · Permit Entire · 11/21/2023
Project B00847625 Alteration · Permit Entire · 03/23/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 210 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/27/2026B00847625-A1Request digital key ↗
08/27/2026B00847625-S3Request digital key ↗
08/27/2026B00847625-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
10/30/2017340511440Open ↗
10/17/2017340511440Open ↗
06/21/2017340511440Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
03/30/2016340364741Open ↗
07/11/2014320722063Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/13/2017340511440Open ↗
07/13/2017340511440Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE COMPLIANCE1
03/30/2016340364741Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
03/30/2016340364741Open ↗
▸Seals & Professional Certifications70
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026B00847625-P9Open ↗
09/23/2026B00847625-A1Open ↗
09/23/2026B00847625-A1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00847625-S3Open ↗
08/27/2026B00847625-I1Open ↗
08/27/2026B00847625-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/10/2026B00847625-P7Open ↗
09/02/2026B00847625-I1Open ↗
09/01/2026B00847625-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/25/2017340511440Open ↗
10/25/2017340511440Open ↗
09/21/2017340511440Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/21/2017340511440Open ↗
03/30/2016340364741Open ↗
07/21/2015321131039Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/21/2017340511440Open ↗
03/30/2016340364741Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/21/2017340511440Open ↗
03/30/2016340364741Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/21/2015321131039Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/21/2015321131039Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B00962252-I1Open ↗
▸Environmental & Asbestos7
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
09/21/2017340511440Open ↗
09/21/2017340511440Open ↗
06/21/2017340511440Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00847625-S1Open ↗
08/27/2026B00847625-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/21/2017340511440Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/21/2017340511440Open ↗
03/30/2016340364741Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00847625-P3Open ↗
08/13/2026B00847625-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00847625-S5Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/27/2026B00847625-P9Open ↗
08/27/2026B00847625-A1Open ↗
08/15/2026B00847625-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/27/2026B00847625-P9Open ↗
08/27/2026B00847625-A1Open ↗
08/15/2026B00847625-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)9
08/13/2026B00847625-I1Open ↗
08/13/2026B00847625-S3Open ↗
08/13/2026B00847625-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/13/2026B00847625-S4Open ↗
08/13/2026B00847625-S3Open ↗
08/13/2026B00847625-S2Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/30/2017340511440Open ↗
10/30/2017340511440Open ↗
09/21/2017340511440Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/21/2017340511440Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/21/2017340511440Open ↗
06/21/2017340511440Open ↗
07/21/2015321131039Open ↗
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM4
10/30/2017340511440Open ↗
10/30/2017340511440Open ↗
10/25/2017340511440Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
07/21/2015321131039Open ↗
04/15/2013320722063Open ↗
03/05/2013320539707Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/21/2017340511440Open ↗
03/30/2016340364741Open ↗
▸BISADDITIONAL INFORMATION1
09/21/2017340511440Open ↗
▸Other Documents26
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
08/27/2026B00847625-S3Open ↗
08/27/2026B00847625-A1Open ↗
08/27/2026B00847625-P9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProof of Historic Building6
08/18/2026B01365053-I1Open ↗
08/15/2026B00847625-P8Open ↗
08/13/2026B00847625-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/27/2016340364741Open ↗