1001 PARK AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1047668
💬 Discuss this project
1929Year Built
14Stories
D4Building Class
R10Zoning
68,569 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Elevator cooperative · 5,823 sf lot · 11.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 12 docs
Penthouse2 filings · 20 docs
Floor 172p · 2 filings · 20 docs
Floor 162p · 2 filings · 20 docs
Floor 152 filings · 16 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 61 filing · 8 docs
Floor 5
Floor 41p · 3 filings · 8 docs
Floor 33 filings · 8 docs
Floor 2
Floor 1Under Construction4p · 1 filing · 18 docs
Site & exterior4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1001 TENANTS3603/21/2026
1001 PARK TENANTS2003/21/2026
CORE DEVELOPMENT GROUP1207/08/2026
CEPRINE CONSTRUCTION607/08/2026
BROWN HARRIS STEVENS403/21/2026
1001 TENNE203/21/2026
MATTHEW ADAMS PROPERTIES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RMBA LLC603/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION1003/21/2026
BOYD CONSULTING403/21/2026
J CALLAHAN CONSULTING803/21/2026
OUTSOURCE CONSULTANTS, INC.603/21/2026
RIP CC203/21/2026
BLANCO DESIGN, INC1003/21/2026
SOL BUILDING CONSULTING SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor2207/08/2026
ALPHACRAFT CONSTRUCTION*General Contractor707/08/2026
VELOCITY PLUMBING & HEATPlumbing607/08/2026
A TO Z CONST GROUP INCGeneral Contractor403/21/2026
FANUKA INCGeneral Contractor307/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
MCCORMACK CONTRACTING INC.General Contractor209/23/2026
RG DECORATING & PAINTINGGeneral Contractor104/09/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
METROTECH MECHANICAL CORPPlumbing110/03/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
BASIL, OMARElectrical103/21/2026
K & G ELECTRIC CO., INC.Electrical103/22/2026
LEVINE, GARYElectrical103/21/2026
MOSCATI, MICHAELElectrical103/21/2026
NORMAN TCHERNOFFElectrical103/21/2026
BANNER ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALLEN+KILLCOYNE ARCHITECT2697207/16/2026
O'ROURKE ENGINEERING, LLC5873105/12/2025
HYKE ENGINEERING & MANAGE2422503/21/2024
CES ENGINEERING LLC1277105/12/2021
TSF ENGINEERING, PC1274104/15/2020
WILLIAM MADDEN ENGINEER C4423503/23/2020
OUTSOURCE SPECIAL INSPECT2827112/06/2019
Building Lifecycle
All (185)Filed (31)Permit Issued (30)Signed Off (12)Facade (FISP) (12)Violation (32)Inspection (4)Objection (34)Special Inspection (30)
10/02/2026
Permit issued — Plumbing
M01411021-S1-PL
09/22/2026
Permit issued — Mechanical Systems
M01411021-S2-MS
09/21/2026
Permit issued — General Construction
M01411021-I1-GC
09/11/2026
Objection resolved — Addressed
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Allen
09/08/2026
Special inspection requirement — Lighting controls
Daniel Allen
09/08/2026
Special inspection requirement — Interior lighting power
Daniel Allen
09/08/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Allen
08/20/2026
Objection resolved — Addressed
08/06/2026
Objection raised — Admin
08/04/2026
Filed — Alteration CO
CHANGE OCCUPANCY OF ONE APARTMENT ON 1ST FLOOR TO TENANT AMENITY USE. WORK LIMITED TO INTERIOR PARTITIONS AND FINISH WORK. PLUMBING AND MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS.
M01411021-S2
07/27/2026
Objection raised — Other
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/27/2026
Special inspection requirement — Shutoff dampers
07/27/2026
Special inspection requirement — Maintenance information
07/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/24/2026
Objection raised — Other
07/24/2026
Objection raised — Scope
07/24/2026
Objection raised — Other
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Filed — Alteration CO
CHANGE OCCUPANCY OF ONE APARTMENT ON 1ST FLOOR TO TENANT AMENITY USE. WORK LIMITED TO INTERIOR PARTITIONS AND FINISH WORK. PLUMBING AND MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS.
M01411021-S1
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Allen
07/14/2026
Special inspection requirement — Final
07/14/2026
Special inspection requirement — Mechanical Systems
06/24/2026
Objection raised — Other
06/17/2026
Objection raised — Admin
06/09/2026
Filed — Alteration CO
CHANGE OCCUPANCY OF ONE APARTMENT ON 1ST FLOOR TO TENANT AMENITY USE. WORK LIMITED TO INTERIOR PARTITIONS AND FINISH WORK. PLUMBING AND MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS.
M01411021-I1
08/20/2025
Permit issued — General Construction
M01170514-I1-GC
05/12/2025
Filed — Alteration
INSTALLATION OF A NEW FIRE-RATED ENCLOSURE FOR AN ELECTRICAL CONDUIT IN A STAIRWELL.
M01170514-I1
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN O'ROURKE
01/22/2025
Special inspection requirement — Final
jamal taha
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
jamal taha
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
01/07/2025
Signed off — Alteration
Installation of HVAC System, as per plans file herewith no change to use, occupancy or egress
M00269737-I1
01/07/2025
Signed off — Alteration
Installation of Plumbing Fixtures as per plans file herewith, no change to use, occupancy or egress.
M00269711-I1
06/22/2024
Cycle 9 facade report signed — SWARMP
04/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Gene Hu
04/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gene Hu
04/01/2024
Special inspection requirement — Post-installed Anchors
Gene Hu
03/21/2024
Filed — Alteration
Installation of Plumbing Fixtures as per plans file herewith, no change to use, occupancy or egress.
M00269711-P4
02/15/2024
Cycle 9 facade report submitted
01/28/2024
Cycle 9 facade inspection completed
01/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00756319-I1
01/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00756331-I1
01/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00756302-I1
12/20/2023
Signed off — Alteration
EXTERIOR MASONRY FACADE REPAIRS & PARTIAL RECONSTRUCTION OF TOP 30 FEET OF BRICK CHIMNEY ENCLOSURE AND AS PER DRAWINGS. NO CHANGE TO CHIMNEY DESIGN, CONFIGURATION, HEIGHT, USE OR MATERIALS IS PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00693496-I1
08/10/2023
Filed — Alteration
Installation of Plumbing Fixtures as per plans file herewith, no change to use, occupancy or egress.
M00269711-P3
08/08/2023
Signed off — Alteration
M00518627-I1
07/24/2023
Signed off — Alteration
MINOR PLUMBING WORK AND REMOVAL OF 1 GAS DRYER AS PER PLANS. NO CHANGE OF EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
M00518640-I1
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gene Hu
07/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Gene Hu
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP10/02/2026
DOB NOWMechanical SystemsPermit IssuedMCCORMACK CONTRACTING INC.09/22/2026
DOB NOWGeneral ConstructionPermit IssuedMCCORMACK CONTRACTING INC.09/21/2026
DOB NOWGeneral ConstructionPermit IssuedRG DECORATING & PAINTING08/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE07/05/2023
DOB NOWGeneral ConstructionSigned-offNOVA CONSTRUCTION SERVICE07/05/2023
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE07/01/2023
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/23/2023
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT02/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE07/22/2022
DOB NOWGeneral ConstructionSigned-offNOVA CONSTRUCTION SERVICE07/15/2022
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE07/12/2022
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE07/01/2022
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT04/19/2022
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*02/21/2022
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*11/10/2021
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT07/21/2021
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*05/28/2021
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT05/27/2021
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT04/08/2021
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*02/11/2021
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC01/25/2021
DOB NOWMechanical SystemsSigned-offFANUKA11/20/2020
DOB NOWMechanical SystemsSigned-offA TO Z CONST GROUP INC06/08/2020
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*02/14/2020
DOB NOWMechanical SystemsSigned-offFANUKA02/13/2020
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT02/13/2020
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC01/21/2020
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP11/27/2019
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC03/09/2019
BISOTISSUEDALPHACRAFT CONSTRUCTION*02/24/2022
BISOTISSUEDALPHACRAFT CONSTRUCTION*02/08/2021
BISPLISSUEDPACE PLUMBING CORP12/09/2020
BISOTISSUEDFANUKA INC11/18/2020
BISOTISSUEDGDC CONTRACTING LLC08/27/2020
BISMHISSUEDGDC CONTRACTING LLC08/27/2020
BISOTISSUEDROYAL RENOVATION CORP03/03/2020
BISOTISSUEDALPHACRAFT CONSTRUCTION*02/11/2020
BISOTISSUEDALPHACRAFT CONSTRUCTION*02/07/2020
BISPLISSUEDWALTER J.GRANDE P & H INC01/24/2020
+ 40 more permits on file
1 project · most recent 03/23/2020
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2020——Air Conditioning Systems, Heating Systems
Cooling
Samsung AMO36 60,000 BTU · Vrf Indoor ×10
2 projects · most recent 08/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedMETROTECH MECHANICAL CORPGas, Water/Sanitary
03/23/2020Permit IssuedDPH PLUMBING & HTG CORPGas, Water/Sanitary
19 projects · most recent 08/27/2026
General Wiring Lighting
FiledStatusContractorScope
08/27/2026CompleteP.S. MARCATO ELEV. CO INC—
06/02/2025CompleteJ.G.C. ELECTRIC, LLCGeneral Wiring
03/14/2025CompleteK & G ELECTRIC CO., INCGeneral Wiring
11/26/2024Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
08/05/2024Permit IssuedL.J.F. & SONS ELECL CONTSGeneral Wiring
08/03/2022Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
07/18/2022CompleteABILENE ELECTRIC INC—
05/28/2021CompleteBANNER ELECTRIC INCGeneral Wiring
06/24/2020CompleteACCURATE ELEC'L CORP.General Wiring
02/14/2020CompleteK & G ELECTRIC CO., INC.28 meters, 28 new_meters
02/10/2020CompleteASTER ELECTRIC, INCGeneral Wiring
02/05/2020CompleteBANNER ELECTRIC INCGeneral Wiring
01/08/2020CompleteAMRA ELECTRICAL CORPGeneral Wiring
11/12/2019CompleteAPOLLO ELECTRIC INC.General Wiring, Lighting
11/07/2019CompleteROME ELECTRICAL CONTS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
09/08/2026Post-installed AnchorsMAURICIO ANDRADEspecial
09/08/2026Lighting controlsDaniel Allenenergy_progress
09/08/2026Interior lighting powerDaniel Allenenergy_progress
09/08/2026Energy Code Compliance InspectionsDaniel Allenprogress
09/08/2026Fire-Resistant Penetrations and JointsDaniel Allenspecial
07/27/2026Maintenance information—energy_progress
07/27/2026Shutoff dampers—energy_progress
07/27/2026Energy Code Compliance Inspections—progress
07/27/2026HVAC-R and service water piping design and insulation—energy_progress
07/27/2026Duct leakage testing, insulation and design—energy_progress
07/27/2026HVAC-R and service water heating system controls—energy_progress
07/27/2026HVAC-R and service water heating equipment—energy_progress
07/21/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Fire-Resistant Penetrations and JointsDaniel Allenspecial
07/14/2026Mechanical Systems—special
07/14/2026Final—progress
01/22/2025Fire-Resistance Rated Constructionjamal tahaprogress
01/22/2025Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
01/22/2025Tenant Protection Plan ComplianceBRIAN O'ROURKEspecial
01/22/2025Finaljamal tahaprogress
04/01/2024Fire-Resistant Penetrations and JointsGene Huspecial
04/01/2024Post-installed AnchorsGene Huspecial
04/01/2024Energy Code Compliance InspectionsGene Huprogress
07/19/2023Post-installed AnchorsGene Huspecial
07/19/2023Energy Code Compliance InspectionsGene Huprogress
Latest 25 of 61.
▾Documents — 682 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch15
09/03/2026M00518640-P1Request digital key ↗
09/03/2026M00518640-I1Request digital key ↗
09/03/2026M00518640-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/05/2026M00219528-S1Request digital key ↗
09/03/2026M00240843-P1Request digital key ↗
09/03/2026M00240843-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00219528-I1Request digital key ↗
09/05/2026M00341346-I1Request digital key ↗
08/15/2026M00269737-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00120591-I1Request digital key ↗
08/15/2026M00120591-P1Request digital key ↗
▸Applications & Permits131
▸BISWORK PERMIT APPLICATION62
05/06/2021140995369Open ↗
12/09/2020104466203Open ↗
03/09/2020123772293Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION46
03/15/2024101980616Open ↗
12/24/2020140995369Open ↗
10/30/2020104466203Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWLPC Approval/Permit23
09/03/2026M00240843-P1Open ↗
09/03/2026M00240843-I1Open ↗
08/16/2026M01411021-I1Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications172
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
01/27/2020123479084Open ↗
01/27/2020123479084Open ↗
01/27/2020123479084Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/05/2026M00120591-P1Open ↗
09/05/2026M00120591-I1Open ↗
09/05/2026M00242983-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/25/2026M01411021-I1Open ↗
09/25/2026M01411021-I1Open ↗
09/25/2026M01411021-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026M01411021-I1Open ↗
09/25/2026M01411021-I1Open ↗
09/01/2026M00269711-P2Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/24/2020140995369Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2020140995369Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
12/12/2019123479084Open ↗
06/12/2019100983884Open ↗
06/10/2019123479084Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/09/2020123275730Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection27
▸DOB NOWTenant Protection Plan11
09/03/2026M00240843-I1Open ↗
09/03/2026M00240843-P1Open ↗
08/15/2026M00242983-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTenant Protection Plan and Notes10
06/12/2020123739393Open ↗
10/23/2019123881442Open ↗
08/23/2019123772293Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
01/25/2019123479084Open ↗
Showing 1 of 2 on file for this type
▸BISTENANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/06/2021140995369Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/15/2018122831980Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026M01411021-I1Open ↗
▸Environmental & Asbestos45
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
12/24/2020140995369Open ↗
11/04/2019123739393Open ↗
12/06/2018122831980Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00518627-I1Open ↗
09/02/2026M00693496-P1Open ↗
08/27/2026M00269711-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/05/2026M00219528-S1Open ↗
09/05/2026M00219528-I1Open ↗
09/03/2026M00240843-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/10/2020123881442Open ↗
08/23/2019123772293Open ↗
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
01/27/2020123479084Open ↗
01/27/2020123479084Open ↗
01/27/2020123479084Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
09/09/2020123275730Open ↗
07/07/2020140233968Open ↗
01/27/2020123479084Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/09/2020123275730Open ↗
07/07/2020140233968Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/26/2024101980616Open ↗
03/26/2024101980616Open ↗
03/25/2024101980616Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/13/2022140995369Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/13/2022140995369Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/25/2024101980616Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
03/27/2024101980616Open ↗
06/15/2022140995369Open ↗
12/08/2021123881442Open ↗
Showing 3 of 27 on file for this type
▸BISLANDMARKS APPROVAL14
01/28/2020123479084Open ↗
12/23/2019123437780Open ↗
11/26/2019123881442Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
10/23/2019123881442Open ↗
08/21/2019123479084Open ↗
Showing 2 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
06/14/2022140995369Open ↗
10/22/2021123881442Open ↗
▸BISSUPERSEDING LETTER2
12/09/2020104466203Open ↗
06/03/2019100983884Open ↗
▸BISSHED LETTER1
07/02/2018140663075Open ↗
▸BISFINAL1
06/13/2022140995369Open ↗
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT42
10/22/2021123881442Open ↗
03/09/2021104466203Open ↗
12/24/2020140995369Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/13/2022140995369Open ↗
07/07/2020140233968Open ↗
▸Filing & Intake Forms71
▸BISEFILING COVER SHEET23
11/04/2019123739393Open ↗
10/23/2019123881442Open ↗
08/23/2019123772293Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION23
01/26/2021123739393Open ↗
06/19/2020123739393Open ↗
06/12/2020123739393Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM20
06/19/2020123739393Open ↗
06/12/2020123739393Open ↗
03/24/2020123772293Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/24/2020140995369Open ↗
Showing 1 of 5 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/15/2018122831980Open ↗
Showing 1 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
07/30/2018123275730Open ↗
07/30/2018123275730Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00693496-I1Open ↗
08/13/2026M00693496-P1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/16/2026M01411021-I1Open ↗