← Back
General warehouse
10014 AVENUE D
BROOKLYN · BIN 3228741
💬 Discuss this project
1959Year Built
1Stories
E1Building Class
M1-1Zoning
10,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
General warehouse · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 2 filings · 14 docs
Floor 11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROWOOD303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/308/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIRE VIOLATIONS SERVICES INC603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027108/18/2025
Building Lifecycle
All (31)Filed (3)Violation (2)Objection (14)Special Inspection (12)
09/16/2025
Objection raised — Energy
09/16/2025
Objection raised — Fire_Protection
09/16/2025
Objection raised — Fire_Protection
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Accessibility
09/16/2025
Objection raised — Fire_Protection
09/16/2025
Objection raised — Fire_Protection
09/16/2025
Objection raised — Accessibility
09/16/2025
Objection raised — Structural
09/16/2025
Objection raised — Fire_Protection
09/16/2025
Objection raised — Accessibility
09/02/2025
Objection raised — Zoning
09/02/2025
Objection raised — Scope
09/02/2025
Objection raised — Zoning
08/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
B01208153-I1
06/03/2025
Filed — Alteration
INSTALLATION OPEN FACE SPRAY BOOTH WITH ASSEMBLY SPRAY ROOM AND MIX ROOM, EXTENSION SP PIPING AND NEW HEADS FOR FIRE SUPPRESSION, DUCT WORK ON ROOF FOR TERMINATION OF EXHAUST, NO CHANGE EGRESS AND ZONING.
B01173354-I1
06/03/2025
Filed — Alteration
EXTENSION OF EXISTING SPRINKLER SYSTEM PIPING AND NEW HEADS FOR FIRE PROTECTION OF OPEN FACE SPRAY BOOTH, SPRAY ROOM AND MIX ROOM AND DUCT EXHAUSTS.
B01173359-I1
04/21/2025
Special inspection requirement — Fenestration air leakage
04/21/2025
Special inspection requirement — Insulation placement and R values
04/21/2025
Special inspection requirement — Air barrier - visual inspection
04/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
04/21/2025
Special inspection requirement — Fenestration areas
04/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
04/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
04/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
04/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
01/29/2025
Special inspection requirement — Mechanical Systems
01/29/2025
Special inspection requirement — Sprinkler Systems
01/29/2025
Special inspection requirement — Final
08/02/2024
Violation issued (FDNY_ORDER, closed)
05/13/2006
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 06/03/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2025——Ventilation Systems
Ventilation
__Junk__ OFB 1000 10 19,000 CFM · Ductwork ×6
1 project · most recent 06/03/2025
FiledStatusContractorScope
06/03/2025——1 heads
2 projects · most recent 07/15/2025
General Wiring
FiledStatusContractorScope
07/15/2025CompleteEVS ELECTRIC CORPGeneral Wiring
01/28/2019CancelledWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/21/2025Fenestration air leakage—energy_progress
04/21/2025Insulation placement and R values—energy_progress
04/21/2025Air barrier - visual inspection—energy_progress
04/21/2025Fenestration and door U-factor and product ratings—energy_progress
04/21/2025Fenestration areas—energy_progress
04/13/2025Fire-Resistance Rated ConstructionAshish Patelprogress
04/13/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
04/13/2025Structural Stability – Alterations of existing buildingsAshish Patelspecial
04/13/2025Energy Code Compliance InspectionsAshish Patelprogress
01/29/2025Mechanical Systems—special
01/29/2025Sprinkler Systems—special
01/29/2025Final—progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01173354-I1Request digital key ↗
08/21/2026B01173354-P1Request digital key ↗
08/21/2026B01173359-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01173354-I1Open ↗
08/21/2026B01173354-P1Open ↗
08/13/2026B01173359-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01208153-I1Open ↗
09/01/2026B01208153-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01208153-I1Open ↗
09/01/2026B01208153-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01173354-I1Open ↗
08/21/2026B01173354-P1Open ↗
08/13/2026B01208153-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026B01208153-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01208153-I1Open ↗