← Back
Zoned residential, not Manhattan
10021 AVENUE N
BROOKLYN · Canarsie · BIN 3428789
💬 Discuss this project
1915Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: THE PINK FISH LLC · 896 sf lot · 0 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALBEUT ELRINGTON 1103/22/2026
ALBERT ELERINGTON 1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2024$41K—— → —— not available
10/14/2014$40K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHAQ106/18/2026
JOSE A VELASQUEZ, PE109/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSE A VELASQUEZ PE203/21/2026
Building Lifecycle
All (59)Filed (2)Violation (5)Objection (22)Special Inspection (30)
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
07/13/2026
Objection raised — Scope
07/13/2026
Objection raised — Energy
07/13/2026
Objection raised — Scope
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Zoning
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Zoning
07/13/2026
Objection raised — Zoning
07/13/2026
Objection raised — Scope
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Admin
06/18/2026
Filed — New Building
Proposed two story building
B01411060-I1
06/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/02/2026
Special inspection requirement — Smoke Control Systems Testing
06/02/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Lowest Floor Elevation
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/02/2026
Special inspection requirement — Maintenance information
06/02/2026
Special inspection requirement — Permanent certificate
06/02/2026
Special inspection requirement — Air barrier — testing
06/02/2026
Special inspection requirement — Mechanical Systems
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/02/2026
Special inspection requirement — Air barrier - visual inspection
06/02/2026
Special inspection requirement — Interior lighting power
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/02/2026
Special inspection requirement — Fenestration air leakage
06/02/2026
Special inspection requirement — Lighting controls
06/02/2026
Special inspection requirement — Fenestration areas
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/02/2026
Special inspection requirement — Metering
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/02/2026
Special inspection requirement — Ventilation and air distribution system
06/02/2026
Special inspection requirement — Insulation placement and R values
09/12/2024
Filed — New Building
B01095771-I1
09/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/08/2024
Special inspection requirement — Structural Steel - Details
09/08/2024
Special inspection requirement — Structural Cold-Formed Steel
09/08/2024
Special inspection requirement — Energy Code Compliance Inspections
08/16/2024
Special inspection requirement — Permanent certificate
08/16/2024
Special inspection requirement — Air barrier - visual inspection
08/16/2024
Special inspection requirement — Insulation placement and R values
07/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2015
Violation issued (ECB, closed)
Construction
04/01/2015
Violation issued (ECB, open)
Construction
05/03/2013
Violation issued (ECB, open)
Unknown
12/14/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDGDY PROPERTIES, LLC12/10/2003
BISEQISSUEDGDY PROPERTIES, LLC12/10/2003
BISEQISSUEDGDY PROPERTIES, LLC11/06/2003
BIS—ISSUEDGDY PROPERTIES, LLC11/06/2003
1 project · most recent 06/18/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-FS12NA SEER 12,000 BTU · Split System ×3
MSZ-FS09NA SEER 9,000 BTU · Split System ×1
MXZ-SM48NAMHZ-U1 48,000 BTU · Split System ×1
Ventilation
Greenheck SP-A70-QD 50 BTU · Exhaust Fan ×2
SP-LP0810WL 150 BTU · Kitchen Exhaust ×1
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/02/2026Electric vehicle service equipment requirements—energy_progress
06/02/2026Fire-Resistant Penetrations and Joints—special
06/02/2026Smoke Control Systems Testing—special
06/02/2026Final—progress
06/02/2026Lowest Floor Elevation—progress
06/02/2026Energy Code Compliance Inspections—progress
06/02/2026Fire-Resistance Rated Construction—progress
06/02/2026Maintenance information—energy_progress
06/02/2026Permanent certificate—energy_progress
06/02/2026Air barrier — testing —energy_progress
06/02/2026Mechanical Systems—special
06/02/2026HVAC-R and service water heating system controls—energy_progress
06/02/2026Air barrier - visual inspection—energy_progress
06/02/2026Interior lighting power—energy_progress
06/02/2026Fenestration and door U-factor and product ratings—energy_progress
06/02/2026Fenestration air leakage—energy_progress
06/02/2026Lighting controls—energy_progress
06/02/2026Fenestration areas—energy_progress
06/02/2026HVAC-R and service water piping design and insulation—energy_progress
06/02/2026Metering—energy_progress
06/02/2026HVAC-R and service water heating equipment—energy_progress
06/02/2026Ventilation and air distribution system—energy_progress
06/02/2026Insulation placement and R values—energy_progress
09/08/2024Fire-Resistance Rated Construction—progress
09/08/2024Structural Steel - Details—special
Latest 25 of 42.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01095771-I1Request digital key ↗
08/14/2026B01411060-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026B01411060-I1Open ↗
08/13/2026B01095771-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01095771-I1Open ↗
08/16/2026B01411060-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial2
08/14/2026B01411060-I1Open ↗
08/13/2026B01095771-I1Open ↗