← Back
Elevator cooperative
1003 LEXINGTON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1042845
💬 Discuss this project
1923Year Built
15Stories
D4Building Class
R10AZoning
56,126 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 141 EAST 72 STREET INC · 4,597 sf lot · 12.21 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentOther
Cellar4p · 1 filing · 8 docs
Sub-Cellar2p · 1 filing · 8 docs
Site & exterior3p · 1 filing · 2 docs
Filed — no permit issued5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUMLEY HAFT1108/28/2026
141 EAST 72 STREET703/22/2026
NEW FORCE CONSTRUCTION1503/22/2026
141 EAST 72ND STREET2903/22/2026
141 E 72 ST INC503/22/2026
HABER103/21/2026
PHOENIX 132 SUTTON STREET, INC303/21/2026
141 E 72 ST INC % GUMLEY-HAFT503/21/2026
BROWN HARRIS STEVENS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWLESS & MANGIONE107/29/2026
MERRITT ENGINEERING CONSULTANTS, DPC111/16/2022
BAILEYS ENGINEERING PC103/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALEXANDER LEVINElectrical203/21/2026
JEFFREY SOLOMONElectrical203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
PERFORMANCE MECHANCIALGeneral Contractor203/21/2026
NEIL CABERAElectrical103/21/2026
RAMDATHSINGH, PURANElectrical103/21/2026
EREGITANO, JElectrical103/21/2026
SCHNABOLK, CHARLESElectrical103/21/2026
MILLENNIUM ELEVATOR GROUPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327111/16/2022
MERRITT ENGINEERING CONSU460111/16/2022
Building Lifecycle
All (88)Filed (3)Permit Issued (2)Signed Off (2)Facade (FISP) (14)Violation (44)Objection (10)Special Inspection (13)
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Scope
08/05/2026
Objection raised — Other
07/29/2026
Filed — Alteration
FACADE REPAIRS TO INCLUSE REPOINTING, BRICK MASONRYREPLACEMENT, SPANDREL REPAIR, LINTEL REPAIR, COPINGREPLACEMENT, SILL REPLACEMENT, COPING JOINTSREPOINTING, TERRACOTTA REPLACEMENT, LIMESTONE PATCHING REPAIR, NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01427512-I1
07/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2026
Special inspection requirement — Post-installed Anchors
07/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/22/2026
Special inspection requirement — Masonry
07/07/2026
Special inspection requirement — Final
OSAMA YAKOUT
07/24/2024
Signed off — Alteration
M00645695-I1
09/14/2023
Permit issued — Mechanical Systems
M00645695-I1-MS
03/15/2023
Violation issued (HPD, closed)
A
03/09/2023
Cycle 9 facade report signed — SWARMP
01/09/2023
Cycle 9 facade report submitted
01/05/2023
Cycle 9 facade inspection completed
11/16/2022
Filed — Alteration
M00645695-I1
11/16/2022
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
11/02/2022
Violation issued (HPD, closed)
I
12/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Krepcio
12/10/2021
Special inspection requirement — Maintenance information
Christopher Krepcio
12/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Krepcio
12/10/2021
Special inspection requirement — Mechanical Systems
Christopher Krepcio
12/10/2021
Special inspection requirement — Final
Christopher Krepcio
12/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Krepcio
12/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Krepcio
04/01/2021
Violation issued (HPD, closed)
A
10/20/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/13/2019
Signed off — Alteration
M00135251-I1
03/11/2019
Permit issued — Sidewalk Shed
M00135251-I1-SH
03/08/2019
Filed — Alteration
M00135251-I1
03/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2017
Violation issued (HPD, closed)
I
08/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2016
Violation issued (HPD, closed)
I
12/31/2015
Violation issued (ECB, closed)
Construction
12/03/2015
Cycle 8 facade report submitted
12/03/2015
Cycle 7 facade report submitted
08/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2015
Cycle 7 facade report submitted
07/01/2015
Cycle 8 facade report submitted
07/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2015
Cycle 7 facade report signed — UNSAFE
06/18/2015
Cycle 8 facade report signed — UNSAFE
06/05/2015
Cycle 7 facade inspection completed
06/05/2015
Cycle 8 facade inspection completed
11/28/2014
Violation issued (ECB, closed)
Cranes and Derricks
11/28/2014
Violation issued (ECB, closed)
Construction
11/28/2014
Violation issued (ECB, closed)
Construction
11/28/2014
Violation issued (ECB, closed)
Cranes and Derricks
11/10/2014
Violation issued (ECB, closed)
Local Law
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL09/14/2023
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/11/2019
BISEQISSUEDEVEREST SCAFFOLDING INC05/28/2019
BISPLISSUEDSMART PLBG & HTG CORP05/07/2019
BISMHISSUEDCAPITAL BUILDERS NYC INC05/02/2019
BISEQISSUEDNEW FORCE CONSTRUCTION CORP11/17/2015
BISPLISSUEDWILLIAM C. GERAKARIS P&H09/09/2015
BISEQISSUEDNEW FORCE CONSTRUCTION CORP06/05/2015
BISOTISSUEDNEW FORCE CONSTRUCTION CORP03/17/2015
BISOTISSUEDNEW FORCE CONSTRUCTION CORP02/11/2015
BISOTISSUEDNEW FORCE CONSTRUCTION CORP09/04/2014
BISEQISSUEDNEW FORCE CONSTRUCTION CORP06/13/2014
BISPLISSUEDWILLIAM C. GERAKARIS P&H04/15/2014
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION03/20/2014
BISOTISSUEDTHE VENETIAN GROUP LLC10/02/2012
BISMHISSUEDTHE VENETIAN GROUP LLC10/02/2012
BISOTISSUEDANTHONY STRIANO11/07/2011
BISMHISSUEDRETCON MECHANICAL CORP10/26/2011
BISOTISSUEDANTHONY STRIANO08/25/2011
BISPLISSUEDMARATHON MECHANICAL LLC08/24/2011
BISMHISSUEDRD-WRIGHT INC08/19/2011
BISOTISSUEDUNIVERSAL CONSTRUCTION IN08/15/2011
BISPLISSUEDBENT MECHANICAL CORP02/08/2011
BISOTISSUEDRD-WRIGHT INC12/21/2010
BISMHISSUEDTHE RENOVATED HOME 1 LTD12/20/2010
BISPLISSUEDM BURTON P & H CORP10/14/2010
BISMHISSUEDTHE RENOVATED HOME 1 LTD09/15/2010
BISMHISSUEDLENNIE CONSTRUCTION CORP04/09/2010
BISPLISSUEDBYPASS MECHANICAL CORP01/20/2010
BISMHISSUEDLENNIE CONSTRUCTION CORP11/12/2009
BISMHISSUEDEXCEL INTERIOR CONSTRUCTION08/24/2008
BISMHISSUEDEXCEL INTERIOR CONSTRUCTION07/24/2008
BISPLISSUEDTAYLOR GROUP PLBG,HTG MEC07/02/2008
BISOTISSUEDATLAS & DESIGN CONTRACTORS06/30/2008
BISEQISSUEDPHOENIX 132 SUTTON ST., INC.01/18/2008
BISEQISSUEDPHOENIX 132 SUTTON ST., INC.12/07/2007
BISOTISSUEDABILENE INC05/09/2006
BISOTISSUEDTEAMWORK CONTR. DEVELOPMENT, INC05/09/2005
BISPLISSUEDF.S. SITE CORP12/23/2003
BISOTISSUEDIVY WALK CONSTRUCTION COMPANY IN12/19/2003
+ 9 more permits on file
3 projects · most recent 02/02/2022
General Wiring
FiledStatusContractorScope
02/02/2022CompleteUNITY ELECTRIC CO INC—
12/05/2019CompleteA.L. ELECTRICAL CORP.General Wiring
02/28/2019CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/22/2026Tenant Protection Plan Compliance—special
07/22/2026Post-installed Anchors—special
07/22/2026Structural Stability – Alterations of existing buildings—special
07/22/2026Masonry—special
07/07/2026FinalOSAMA YAKOUTprogress
11/16/2022Tenant Protection Plan ComplianceYongho Kimspecial
12/10/2021HVAC-R and service water heating system controlsChristopher Krepcioenergy_progress
12/10/2021Maintenance informationChristopher Krepcioenergy_progress
12/10/2021Fire-Resistant Penetrations and JointsChristopher Krepciospecial
12/10/2021Mechanical SystemsChristopher Krepciospecial
12/10/2021FinalChristopher Krepcioprogress
12/10/2021HVAC-R and service water heating equipmentChristopher Krepcioenergy_progress
12/10/2021HVAC-R and service water piping design and insulationChristopher Krepcioenergy_progress
▾Documents — 368 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026M00645695-I1Request digital key ↗
08/15/2026M01427512-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135251-I1Request digital key ↗
▸Applications & Permits84
▸BISPLAN / WORK APPROVAL APPLICATION42
07/01/2020123758451Open ↗
05/20/2020123758451Open ↗
12/20/2019123758451Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION40
12/20/2019123758451Open ↗
05/24/2019140850032Open ↗
05/08/2019123123592Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWLPC Approval/Permit2
08/15/2026M01427512-I1Open ↗
08/13/2026M00645695-I1Open ↗
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
12/10/2019123758451Open ↗
12/09/2019123123592Open ↗
12/09/2019123123592Open ↗
Showing 3 of 53 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
12/10/2019123758451Open ↗
12/07/2015122606787Open ↗
06/18/2014122040647Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/07/2012121345277Open ↗
09/05/2012121345277Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/10/2019123758451Open ↗
05/24/2019140850032Open ↗
12/07/2015122606787Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026M01427512-I1Open ↗
08/13/2026M00135251-I1Open ↗
08/13/2026M00645695-I1Open ↗
▸BISApplicant / Owner Signature2
02/06/2014140155098Open ↗
01/21/2014140152509Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M00645695-I1Open ↗
09/23/2026M00645695-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00645695-I1Open ↗
09/23/2026M00645695-I1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/24/2019140850032Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2019140850032Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE15
11/04/2015140155098Open ↗
10/29/2015140155098Open ↗
07/08/2014140155098Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING14
06/09/2015140155098Open ↗
05/08/2015140155098Open ↗
05/05/2015140155098Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/22/2019123123592Open ↗
07/08/2014122028741Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
12/10/2019123758451Open ↗
01/16/2019123123592Open ↗
05/24/2019140850032Open ↗
▸Environmental & Asbestos22
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/20/2019123758451Open ↗
01/16/2019123123592Open ↗
12/07/2015122606787Open ↗
Showing 3 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
03/14/2014140152509Open ↗
02/06/2014140155098Open ↗
12/07/2012121450474Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00645695-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M01427512-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
12/10/2019123758451Open ↗
01/26/2016140155098Open ↗
05/12/2015140152509Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
04/07/2014140155098Open ↗
03/20/2014140152509Open ↗
02/06/2014140155098Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
01/16/2019123123592Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/19/2020123758451Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/19/2020123758451Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/24/2019140850032Open ↗
▸Approvals, Objections & Sign-offs44
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/17/2020123758451Open ↗
12/09/2019123123592Open ↗
12/09/2019123123592Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
12/07/2012121450474Open ↗
09/05/2012121345277Open ↗
Showing 2 of 11 on file for this type
▸BISLANDMARKS APPROVAL11
12/20/2019123758451Open ↗
05/24/2019140850032Open ↗
04/02/2019123123592Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSHED LETTER2
06/12/2015122040647Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
01/16/2019123123592Open ↗
▸BISLANDMARKS SIGNOFF1
08/13/2020123758451Open ↗
▸BISSUPERSEDING LETTER1
03/24/2015121450474Open ↗
▸BISFINAL1
07/19/2020123758451Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
12/19/2019123758451Open ↗
12/09/2019123123592Open ↗
01/16/2019123123592Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/19/2020123758451Open ↗
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION17
04/18/2019123123592Open ↗
04/18/2019123123592Open ↗
01/16/2019123123592Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET14
12/10/2019123758451Open ↗
01/16/2019123123592Open ↗
01/16/2019123123592Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM9
12/09/2019123123592Open ↗
12/09/2019123123592Open ↗
12/09/2019123123592Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet7
01/21/2014140152509Open ↗
05/24/2019140850032Open ↗
02/06/2014140155098Open ↗
Showing 3 of 7 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type