← Back
Walk-up apt, over six families with stores
1003 SOUTHERN BOULEVARD
BRONX · BIN 2005780
💬 Discuss this project
1909Year Built
5Stories
C7Building Class
C4-4Zoning
16,710 sfGross Floor Area
10Units
Rent Stabilized2 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 1003 VIP LLC · 5,200 sf lot · 3.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
Floor 52p · 1 filing · 20 docs
Floor 41 filing · 20 docs
Floor 3Under Construction2p · 1 filing · 20 docs
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1
CellarUnder Construction4p · 1 filing · 20 docs
2 jobs · most recent 06/30/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Signed-offHARROW NY INCHeating Systems, Ventilation Systems
Heating
Berko ×20
Ventilation
06/30/2026Signed-offREDIRECTING LIC INCHeating Systems, Ventilation Systems
Heating
Berko ×20
Ventilation
2 jobs · most recent 06/30/2026
Water/Sanitary
FiledStatusContractorScope
06/30/2026Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
06/30/2026Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
3 jobs · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026CompleteE & M ELECTRICAL NY CORPGeneral Wiring
06/12/2026CompleteE & M ELECTRICAL NY CORP12 meters, 9 new_meters
04/06/2026Permit IssuedRICHARD NEU—
2 jobs · most recent 06/30/2026
Steel Wood
FiledStatusContractorScope
06/30/2026Permit IssuedAMERICAN STANDARD P&H CORSteel, Wood
06/30/2026Signed-offHARROW NY INCSteel, Wood
1 job · most recent 04/06/2026
Sidewalk Shed
FiledStatusContractorScope
04/06/2026Signed-offPARK CONTRACTING GROUPSidewalk Shed
Building Lifecycle
All (74)Filed (13)Permit Issued (9)Signed Off (1)Violation (14)Inspection (11)Objection (26)
09/18/2026
Permit issued — General Construction
X01246973-I1-ST
07/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01381365-I1
07/08/2026
Permit issued — Sidewalk Shed
X01381365-I1-SH
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-P2
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-P3
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-P2
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-P1
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-P3
06/30/2026
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-P1
04/30/2026
Violation issued (HPD, closed)
A
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01381365-I1
04/06/2026
Permit issued — Sidewalk Shed
X01381365-I1-SH
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2025
Permit issued — Plumbing
X01225860-S2-PL
12/18/2025
Permit issued — Plumbing
X01246973-S2-PL
12/15/2025
Permit issued — Mechanical Systems
X01246973-S1-MS
12/15/2025
Permit issued — Structural
X01246973-I1-GC
12/15/2025
Permit issued — Mechanical Systems
X01225860-S1-MS
12/02/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
10/29/2025
Objection raised — Admin
10/29/2025
Objection raised — Code
10/29/2025
Objection raised — Structural
10/29/2025
Objection raised — Code
10/29/2025
Objection raised — Code
10/29/2025
Objection raised — Cost
10/29/2025
Objection raised — Scope
10/27/2025
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-I1
10/27/2025
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-S2
10/27/2025
Filed — Alteration
Mechanical work in conjunction with X01246973-I1
X01246973-S1
10/02/2025
Permit issued — Structural
X01225860-I1-GC-CX
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Cost
07/25/2025
Objection raised — Structural
07/25/2025
Objection raised — Mechanical
07/25/2025
Objection raised — Scope
07/25/2025
Objection raised — Mechanical
07/25/2025
Objection raised — Energy
07/17/2025
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-I1
07/17/2025
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-S2
07/17/2025
Filed — Alteration
Mechanical work in conjunction with X01225860-I1
X01225860-S1
06/05/2025
Violation issued (HPD, closed)
A
02/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/12/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
Latest 60 of 74 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP207/10/2026
1003 VIP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GAD ASHOORI PE1206/30/2026
ALWAYS FAST SERVICES CORP104/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SITE SAFETY BSD603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDIRECTING LIC INCGeneral Contractor404/09/2026
SENAD MEHOVICElectrical203/21/2026
PARK CONTRACTING GROUPGeneral Contractor207/10/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
HARROW NY INCGeneral Contractor109/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161206/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHARROW NY INC09/18/2026
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/08/2026
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP04/06/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/18/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/18/2025
DOB NOWMechanical SystemsSigned-offREDIRECTING LIC INC12/15/2025
DOB NOWStructuralPermit IssuedREDIRECTING LIC INC12/15/2025
DOB NOWMechanical SystemsSigned-offREDIRECTING LIC INC12/15/2025
DOB NOWStructuralSigned-offREDIRECTING LIC INC10/02/2025
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Pass-Final PL - UndergroundPassView ↗
04/12/2024Pass-Final PL - UndergroundPassView ↗
02/06/2024Pass-Final PL - UndergroundPassView ↗
01/30/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
07/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/28/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/28/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
07/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/27/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
07/27/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
07/27/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
07/27/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/27/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
07/27/2026Wood – Seismic Resistance—special
07/27/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
07/27/2026FinalSHAHRIAR QUAYYUMprogress
07/27/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/27/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
07/27/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
07/24/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/24/2026Ventilation and air distribution systemSHAHRIAR QUAYYUMenergy_progress
07/24/2026FinalSHAHRIAR QUAYYUMprogress
07/24/2026Exhaust and Vent Systems in Plenums and DuctsSHAHRIAR QUAYYUMspecial
07/24/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/24/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
07/24/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
07/23/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/23/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 92.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/18/2026X01225860-S1Request digital key ↗
08/18/2026X01225860-I1Request digital key ↗
08/18/2026X01225860-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026X01225860-S1Open ↗
09/23/2026X01225860-S1Open ↗
09/23/2026X01246973-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/18/2026X01225860-I1Open ↗
08/18/2026X01225860-S2Open ↗
08/18/2026X01225860-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026X01246973-S1Open ↗
09/23/2026X01225860-S1Open ↗
09/18/2026X01225860-S2Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/18/2026X01225860-I1Open ↗
08/18/2026X01225860-P3Open ↗
08/18/2026X01225860-S2Open ↗
Showing 3 of 12 on file for this type