1005 1 AVENUE
MANHATTAN · BIN 1039972
💬 Discuss this project
1907Year Built
20Stories
W3Building Class
R10Zoning
398,214 sfGross Floor Area
2Units
LL97 Covered19 Open Violations 16 unresolved · 3 paperwork only ▸FISP: SAFE
School or academy · Owner of record: X11 FIRST AVE LLC · 35,681 sf lot · 11.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction33p · 4 filings · 20 docs
Floor 28Under Construction2 filings · 8 docs
Floor 27Under Construction2 filings · 8 docs
Floor 26Under Construction25p · 3 filings · 20 docs
Floor 25Under Construction53p · 3 filings · 20 docs
Floor 24Under Construction29p · 3 filings · 20 docs
Floor 23Under Construction81p · 3 filings · 20 docs
Floor 22Under Construction60p · 4 filings · 20 docs
Floor 21Under Construction39p · 2 filings · 20 docs
Floor 20Under Construction44p · 3 filings · 20 docs
Floor 19Under Construction44p · 3 filings · 20 docs
Floor 18Under Construction99p · 3 filings · 20 docs
Floor 17Under Construction70p · 3 filings · 20 docs
Floor 16Under Construction63p · 3 filings · 20 docs
Floor 15Under Construction64p · 3 filings · 20 docs
Floor 14Under Construction47p · 3 filings · 20 docs
Floor 13Under Construction99p · 4 filings · 20 docs
Floor 12Under Construction47p · 3 filings · 20 docs
Floor 11Under Construction47p · 3 filings · 20 docs
Floor 10Under Construction91p · 3 filings · 20 docs
Floor 9Under Construction48p · 4 filings · 20 docs
Floor 8Under Construction74p · 5 filings · 20 docs
Floor 7Under Construction120p · 3 filings · 20 docs
Floor 6Under Construction48p · 3 filings · 20 docs
Floor 5Under Construction47p · 3 filings · 20 docs
Floor 4Under Construction45p · 3 filings · 20 docs
Floor 3Under Construction46p · 3 filings · 20 docs
Floor 2Under Construction51p · 4 filings · 20 docs
Floor 1Under Construction49p · 2 filings · 20 docs
CellarUnder Construction103p · 2 filings · 20 docs
2 jobs · most recent 05/08/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Permit IssuedX11 FIRST AVE LLCAir Conditioning Systems, Heating Systems
Cooling
Daikin RXYA120AAYDA 114,000 BTU · Vrf Outdoor ×7
RXYA96AAYDA 89,000 BTU · Vrf Outdoor ×6
RXYA144AAYDA 144,000 BTU · Vrf Outdoor ×3
RX30NMVJUA 24,000 BTU · Vrf Outdoor ×2
RXYA72AAYDA 71,800 BTU · Vrf Outdoor ×2
RXYA168AAYDA 162,000 BTU · Vrf Outdoor ×1
RXYA192AAYDA 192,000 BTU · Vrf Outdoor ×1
Aaon M2H-018 239,400 BTU · Rooftop Unit ×2
RN-007-03-0-HBAC-VI-21-000-A 81,100 BTU · Rooftop Unit ×1
RNA-015-B-A-3 131,700 BTU · Rooftop Unit ×1
RQA-005-A-A-3 61,800 BTU · Rooftop Unit ×1
Dectron DS-080 172,300 BTU ×1
Heating
Ephoca APK 10,000 BTU · Ptac ×582
Aaon EDH 50 kW · Electric Heater ×15
M2H-018 164,100 BTU · Rooftop Unit ×2
RN-007-03-0-HBAC-VI-21-000-A 39,300 BTU · Rooftop Unit ×1
RNA-015-B-A-3 77,200 BTU · Rooftop Unit ×1
RQA-005-A-A-3 30,500 BTU · Rooftop Unit ×1
Daikin RXYA120AAYDA 84,000 BTU · Vrf Outdoor ×7
RXYA96AAYDA 79,300 BTU · Vrf Outdoor ×6
RXYA144AAYDA 138,000 BTU · Vrf Outdoor ×3
RXYA72AAYDA 61,900 BTU · Vrf Outdoor ×2
RXYA168AAYDA 156,000 BTU · Vrf Outdoor ×1
RXYA192AAYDA 184,000 BTU · Vrf Outdoor ×1
Berko MSCSSAR4808 5 kW · Electric Heater ×15
QTS1104 1 kW · Electric Heater ×1
Indeeco QUZ 75 kW · Electric Heater ×2
07/20/2020——Air Conditioning Systems
Cooling
York YMC-S1758AB 500 tons · Chiller ×1
2 jobs · most recent 07/31/2026
Sprinkler System
FiledStatusContractorScope
07/31/2026Permit IssuedRAEL AUTOMATIC SPR.CO INC48 outlets
05/08/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSprinkler System
2 jobs · most recent 07/31/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
07/31/2026Signed-offDONATO PLUMBING GROUP INCWater/Sanitary
05/08/2026Permit IssuedDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
7 jobs · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedTOP SHELF ELECTRIC CORPGeneral Wiring
10/10/2025Permit IssuedSOLAS ELECTRICAL CORP—
10/10/2025Permit IssuedSOLAS ELECTRICAL CORP—
10/10/2025Permit IssuedSOLAS ELECTRICAL CORP—
09/15/2025Permit IssuedTRANSFORM ELECTL CONTRS I—
11/09/2021CompleteKGB ELEC'L CONTR'G CORPGeneral Wiring
06/14/2021Permit IssuedSTAR ELEC'L CONTRACTORS C—
2 jobs · most recent 07/31/2026
Steel Concrete
FiledStatusContractorScope
07/31/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSteel, Concrete
05/08/2026Permit IssuedX11 FIRST AVE LLCSteel, Concrete
2 jobs · most recent 05/28/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
05/28/2026Permit IssuedARSENAL SCAFFOLD INCFence, Sidewalk Shed
05/16/2026Permit IssuedARSENAL SCAFFOLD INCScaffold
Building Lifecycle
All (227)Filed (50)Permit Issued (42)Signed Off (2)Facade (FISP) (13)Violation (60)Inspection (20)Objection (10)Special Inspection (30)
09/29/2026
Permit issued — Protection and Mechanical Methods
M01276327-I1-PMM
09/29/2026
Permit issued — Protection and Mechanical Methods
M01276322-I1-PMM
09/18/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/12/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/11/2026
Violation issued (ECB, closed)
Unknown
08/11/2026
Violation issued (ECB, open)
Unknown
08/11/2026
Violation issued (ECB, open)
Unknown
08/06/2026
Violation issued (ECB, open)
Unknown
08/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Sprayed fire-resistant materials
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
07/31/2026
Filed — Alteration
Plumbing work as shown on the plans.
M01241994-P2
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Sprayed fire-resistant materials
SEBASTIAN SETTEDUCATE JR., P.E
07/30/2026
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
07/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/22/2026
Permit issued — Structural
M01216837-S4-ST
07/21/2026
Permit issued — General Construction
M01216837-I1-GC
07/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/15/2026
Permit issued — Construction Fence
M01250783-I1-SH
06/26/2026
Violation issued (ECB, open)
Unknown
06/26/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2026
Objection resolved — Addressed
06/23/2026
Violation issued (ECB, open)
Unknown
06/17/2026
Violation issued (ECB, closed)
Unknown
06/17/2026
Violation issued (ECB, closed)
Unknown
06/03/2026
Filed — Alteration
Use of temporary mini crane construction equipment as per plans filed herewith.
M01397315-P1
06/03/2026
Filed — Alteration
Use of temporary mini crane construction equipment as per plans filed herewith.
M01407277-P1
05/29/2026
Filed — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01399039-P1
05/28/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01250783-P5
05/27/2026
Permit issued — Protection and Mechanical Methods
M01407277-I1-PMM
05/26/2026
Filed — Alteration
Use of temporary mini crane construction equipment as per plans filed herewith.
M01407277-I1
05/22/2026
Permit issued — Construction Fence
M01250783-I1-FN
05/18/2026
Objection raised — Other
05/16/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01356009-P3
05/16/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01250783-P4
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Permit issued — Protection and Mechanical Methods
M01397315-I1-PMM
05/11/2026
Violation issued (ECB, closed)
Construction
05/11/2026
Violation issued (ECB, closed)
Construction
05/11/2026
Violation issued (ECB, closed)
Construction
05/11/2026
Violation issued (ECB, closed)
Construction
05/11/2026
Violation issued (ECB, closed)
Construction
05/08/2026
Filed — Alteration
Use of temporary mini crane construction equipment as per plans filed herewith.
M01397315-I1
05/08/2026
Filed — Alteration CO
Plumbing work in conjunction with Alt-CO as shown on plans.
M01216837-P7
Latest 60 of 227 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
X11 FIRST AVE13009/30/2026
ARCHDIOCESE1307/08/2026
ARCHDIOCESE OF NEW YORK903/22/2026
ECCLESIASTICAL ASSISTANCE CORP3703/22/2026
THE DAVID BROWN REALTY203/22/2026
E.A.C INC.103/22/2026
ECCLESIASTICAL ASSISTANT CORP1703/21/2026
ECCLESIAST203/21/2026
ECCLESI203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/09/2025$103.0M—— → —$259/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors2403/21/2026
KD DESIGNS1103/21/2026
RIGGING CONSULTANTS203/21/2026
JAM CONSULTANTS, INC.203/21/2026
FRIEDMAN ASSOCIATES II203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor1309/30/2026
X11 FIRST AVE LLCGeneral Contractor1207/23/2026
CASTELLANO, MICHAELElectrical603/21/2026
TAYLOR, ERROLElectrical603/21/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor607/08/2026
KG SPRINKLER CORPFire Protection307/08/2026
BARONE STEEL INCGeneral Contractor307/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection306/28/2026
DONATO PLUMBING GROUP INCPlumbing207/08/2026
SUGARMAN, IRAElectrical103/21/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
SALAZAR, PEDROElectrical103/21/2026
PARISI, ROBERTElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
COLGATE RESTORATION CORPGeneral Contractor107/08/2026
JOSEPH SORTINOElectrical103/21/2026
SKYLINE WINDOWS LLCGeneral Contractor104/09/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
AGUILAR, JOSEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16882007/31/2026
PCS ENGINEERING3745102/13/2025
VINCENT J. LIOTTA P. E.1974107/20/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC09/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC09/29/2026
DOB NOWStructuralPermit IssuedX11 FIRST AVE LLC07/22/2026
DOB NOWGeneral ConstructionPermit IssuedX11 FIRST AVE LLC07/21/2026
DOB NOWConstruction FencePermit IssuedARSENAL SCAFFOLD INC07/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBARONE STEEL INC05/27/2026
DOB NOWConstruction FencePermit IssuedARSENAL SCAFFOLD INC05/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBARONE STEEL INC05/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC05/08/2026
DOB NOWStructuralPermit IssuedX11 FIRST AVE LLC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedX11 FIRST AVE LLC03/30/2026
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC03/27/2026
DOB NOWGeneral ConstructionPermit IssuedX11 FIRST AVE LLC03/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC02/09/2026
DOB NOWSupported ScaffoldPermit IssuedARSENAL SCAFFOLD INC02/06/2026
DOB NOWStructuralPermit IssuedX11 FIRST AVE LLC01/30/2026
DOB NOWGeneral ConstructionPermit IssuedX11 FIRST AVE LLC01/30/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC01/30/2026
DOB NOWMechanical SystemsPermit IssuedX11 FIRST AVE LLC01/27/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC01/27/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC01/27/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC01/27/2026
DOB NOWStructuralPermit IssuedX11 FIRST AVE LLC11/26/2025
DOB NOWGeneral ConstructionSigned-offX11 FIRST AVE LLC11/25/2025
DOB NOWGeneral ConstructionPermit IssuedX11 FIRST AVE LLC11/25/2025
DOB NOWMechanical SystemsSigned-offX11 FIRST AVE LLC11/25/2025
DOB NOWGeneral ConstructionPermit IssuedSKYLINE WINDOWS LLC11/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC10/01/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedARSENAL SCAFFOLD INC10/01/2025
DOB NOWMechanical SystemsSigned-offNORTHEAST SPECIALIST GROUP09/29/2025
DOB NOWStructuralPermit IssuedBARONE STEEL09/24/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC08/27/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC08/27/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC08/20/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC08/20/2025
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP08/06/2025
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC07/17/2025
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC07/17/2025
DOB NOWMechanical SystemsSigned-offNORTHEAST SPECIALIST GROUP07/03/2025
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP06/26/2025
+ 52 more permits on file
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/12/2026Fail-Final General Construction Non-Directive 14FailView ↗
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
07/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/23/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 139
DateRequirementInspectorRole
08/03/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/03/2026Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
08/03/2026Sprayed fire-resistant materialsSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/30/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Sprayed fire-resistant materialsSEBASTIAN SETTEDUCATE JR., P.Especial
07/30/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
05/08/2026Exterior Insulation and Finish Systems (EIFS)SEBASTIAN SETTEDUCATE JR., P.Especial
05/08/2026Fenestration and door U-factor and product ratingsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Air barrier — testing SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Air barrier continuity plan testingSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Fenestration areasSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/08/2026VestibulesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 139.
▾Documents — 313 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch49
08/24/2026M01174191-I1Request digital key ↗
08/23/2026M01220072-I1Request digital key ↗
08/22/2026M01245138-I1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00331452-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION16
03/20/2020123308811Open ↗
08/10/2011120461874Open ↗
10/28/2010120461865Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION10
12/11/2010120461856Open ↗
12/11/2010120461856Open ↗
11/22/2010120461865Open ↗
Showing 3 of 10 on file for this type
▸BISPLACE OF ASSEMBLY5
09/17/2020123308811Open ↗
03/28/2018123308811Open ↗
01/08/2018123308811Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026M01216837-P7Open ↗
08/13/2026M01216837-I1Open ↗
08/13/2026M01216837-P5Open ↗
▸Seals & Professional Certifications104
▸DOB NOWDPL-1: Design Professional Seal & Signature49
08/21/2026M01241994-S5Open ↗
08/21/2026M01241994-P2Open ↗
08/21/2026M01276322-P1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
11/30/2017123308811Open ↗
07/05/2017122019760Open ↗
06/05/2014122019760Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M01241994-S4Open ↗
09/01/2026M01216837-S3Open ↗
09/01/2026M01241994-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M01241994-P1Open ↗
08/29/2026M01272769-P1Open ↗
08/28/2026M01220072-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/05/2014122019760Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/05/2014122019760Open ↗
▸Trade Schedules & Equipment29
▸BISEQUIPMENT USE PERMITS14
02/11/2010120125453Open ↗
02/11/2010120125453Open ↗
02/11/2010120125453Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING6
08/10/2011120461874Open ↗
09/13/2010120461874Open ↗
09/11/2010120461847Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
03/01/2011120461847Open ↗
03/01/2011120461874Open ↗
11/30/2009120125444Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
03/01/2011120461847Open ↗
03/01/2011120461874Open ↗
11/30/2009120125444Open ↗
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026M01216837-S3Open ↗
08/13/2026M01216837-P3Open ↗
08/13/2026M01241994-S6Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/17/2026M01216837-P5Open ↗
08/15/2026M01216837-I1Open ↗
08/14/2026M01216837-P7Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01216837-I1Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
08/21/2026M01241994-S5Open ↗
08/21/2026M01241994-P2Open ↗
08/21/2026M01308758-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
09/11/2010120461865Open ↗
09/11/2010120461856Open ↗
09/11/2010120461865Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
09/30/2010120461847Open ↗
09/20/2010120461874Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01220072-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS6
09/13/2010120461874Open ↗
09/11/2010120461856Open ↗
09/11/2010120461847Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/05/2017122019760Open ↗
10/25/2010120461865Open ↗
06/19/2010120125453Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/05/2017122019760Open ↗
06/19/2010120125453Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01220072-I1Open ↗
08/13/2026M00331452-I1Open ↗
▸DOB NOWDCLA Approval of Artwork2
08/17/2026M01250783-I1Open ↗
08/17/2026M01250783-P5Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01220072-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
09/13/2010120461874Open ↗
09/11/2010120461865Open ↗
09/11/2010120461856Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
09/11/2010120461865Open ↗
09/11/2010120461856Open ↗
09/11/2010120461856Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
03/20/2020123308811Open ↗
03/20/2018123308811Open ↗
08/29/2011120461856Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet1
09/13/2010120461874Open ↗
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/05/2017122019760Open ↗
07/05/2017122019760Open ↗
06/05/2014122019760Open ↗
▸DOB NOWSite Survey: Initial3
08/14/2026M01216837-P7Open ↗
08/13/2026M01216837-P5Open ↗
08/13/2026M01216837-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026M01216837-P7Open ↗
08/13/2026M01216837-P5Open ↗
08/13/2026M01216837-I1Open ↗
▸DOB NOWPlot Diagram3
08/14/2026M01216837-P7Open ↗
08/13/2026M01216837-P5Open ↗
08/13/2026M01216837-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026M01216837-P5Open ↗
08/15/2026M01216837-I1Open ↗
08/14/2026M01216837-P7Open ↗
▸DOB NOWCalculations1
08/13/2026M01174191-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01174191-I1Open ↗