← Back
Two family frame
1005 EDISON AVENUE
BRONX · BIN 2076397
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R3AZoning
2,070 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 5,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 13 docs
Cellar4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2021$750K—— → —$362/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION509/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TEN STARS BUILD CONTRACTGeneral Contractor603/21/2026
OSSO PLUMBING & HEATINGPlumbing607/08/2026
SPIRO SINANISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781509/29/2022
Building Lifecycle
All (33)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (5)Special Inspection (17)
12/20/2022
Signed off — Alteration
Remove partition on the 1st floor. Convert kitchen to bedroom and convert living room to kitchen on the 2nd floor. Partition changes on cellar and 1st floors.
X00623409-I1
12/20/2022
Signed off — Alteration
Install new one (1) gas meter, replace boiler and water heater with two (2) boilers and two (2) water heaters in cellar. Install one (1) dishwasher at 2nd floor and one (1) laundry sink at cellar. Re-pipe gas piping throughout building.
X00623401-I1
09/30/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/30/2022
Special inspection requirement — Permanent certificate
Steven Bendoraitis
09/30/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/29/2022
Filed — Alteration
Install new one (1) gas meter, replace boiler and water heater with two (2) boilers and two (2) water heaters in cellar. Install one (1) dishwasher at 2nd floor and one (1) laundry sink at cellar. Re-pipe gas piping throughout building.
X00623401-P2
09/29/2022
Permit issued — General Construction
X00623409-I1-GC
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/27/2022
Special inspection requirement — Permanent certificate
Steven Bendoraitis
09/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/27/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/07/2022
Filed — Alteration
Install new one (1) gas meter, replace boiler and water heater with two (2) boilers and two (2) water heaters in cellar. Install one (1) dishwasher at 2nd floor and one (1) laundry sink at cellar. Re-pipe gas piping throughout building.
X00623401-P1
07/07/2022
Filed — Alteration
Remove partition on the 1st floor. Convert kitchen to bedroom and convert living room to kitchen on the 2nd floor. Partition changes on cellar and 1st floors.
X00623409-P1
07/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/06/2022
Special inspection requirement — Final
Steven Bendoraitis
05/12/2022
Permit issued — Plumbing
X00623401-I1-PL
05/03/2022
Permit issued — General Construction
X00623409-I1-GC
12/01/2021
Filed — Alteration
Remove partition on the 1st floor. Convert kitchen to bedroom and convert living room to kitchen on the 2nd floor. Partition changes on cellar and 1st floors.
X00623409-I1
12/01/2021
Filed — Alteration
Install new one (1) gas meter, replace boiler and water heater with two (2) boilers and two (2) water heaters in cellar. Install one (1) dishwasher at 2nd floor and one (1) laundry sink at cellar. Re-pipe gas piping throughout building.
X00623401-I1
05/24/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTEN STARS BUILD CONTRACT09/29/2022
DOB NOWPlumbingSigned-offOSSO PLUMBING & HEATING05/12/2022
DOB NOWGeneral ConstructionSigned-offTEN STARS BUILD CONTRACT05/03/2022
BISOTISSUEDN/A09/14/2006
1 project · most recent 03/08/2022
General Wiring
FiledStatusContractorScope
03/08/2022CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/30/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/30/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/30/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/30/2022HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/30/2022Permanent certificateSteven Bendoraitisenergy_progress
09/30/2022Maintenance informationSteven Bendoraitisenergy_progress
09/30/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/27/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/27/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/27/2022Permanent certificateSteven Bendoraitisenergy_progress
09/27/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/27/2022HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/27/2022Maintenance informationSteven Bendoraitisenergy_progress
09/27/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
07/06/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/06/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/06/2022FinalSteven Bendoraitisprogress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026X00623401-I1Request digital key ↗
08/25/2026X00623401-P1Request digital key ↗
08/25/2026X00623401-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 15
08/25/2026X00623409-I1Open ↗
08/13/2026X00623409-P1Open ↗
08/13/2026X00623401-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
08/25/2026X00623409-I1Open ↗
08/13/2026X00623409-P1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026X00623401-P2Open ↗
09/01/2026X00623401-P2Open ↗
09/01/2026X00623401-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00623409-I1Open ↗
08/25/2026X00623409-P1Open ↗
08/13/2026X00623401-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00623401-P2Open ↗
09/01/2026X00623401-I1Open ↗
08/31/2026X00623409-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026X00623409-P1Open ↗
08/25/2026X00623409-I1Open ↗
08/13/2026X00623401-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00623401-I1Open ↗