← Back
Over six families without stores
1008 SUMMIT AVENUE
BRONX · BIN 2091259
💬 Discuss this project
1916Year Built
5Stories
C1Building Class
R7-1Zoning
41,500 sfGross Floor Area
42Units
Rent Stabilized52 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: HIGHBRIDGE CATCH LIMITED PARTNERSHI · 9,500 sf lot · 4.37 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE CATCH LIMITED PARTNERSHI103/22/2026
HIGHBRIDGE CATCH LP103/22/2026
HPD1003/21/2026
HIGHBRIDGE CATCH LP DEVELOPMENT CORPORATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CTA ARCHITECTS P.C.111/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PEREIRA, EURIPEDESElectrical403/21/2026
THORNE, LAWRENCEElectrical403/21/2026
JANKUC, JONELElectrical103/21/2026
JOSE NUNEZElectrical103/21/2026
MALDONADO, WElectrical103/21/2026
NUNEZ, JOSEElectrical103/21/2026
Building Lifecycle
All (69)Filed (1)Violation (60)Objection (2)Special Inspection (6)
07/04/2026
Violation issued (HPD, open)
A
07/04/2026
Violation issued (HPD, open)
B
07/04/2026
Violation issued (HPD, open)
C
07/04/2026
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
12/13/2023
Violation issued (HPD, open)
B
12/13/2023
Violation issued (HPD, open)
B
11/20/2023
Violation issued (HPD, closed)
C
11/20/2023
Violation issued (HPD, closed)
C
11/20/2023
Violation issued (HPD, closed)
C
11/20/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, open)
C
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
C
10/20/2023
Violation issued (HPD, closed)
C
09/22/2023
Violation issued (HPD, closed)
C
09/22/2023
Violation issued (HPD, closed)
C
08/01/2023
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, closed)
A
08/01/2023
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
C
05/26/2023
Violation issued (HPD, open)
C
05/22/2023
Violation issued (HPD, closed)
A
05/22/2023
Violation issued (HPD, closed)
C
05/11/2023
Violation issued (HPD, closed)
B
05/11/2023
Violation issued (HPD, open)
A
05/11/2023
Violation issued (HPD, open)
C
05/11/2023
Violation issued (HPD, closed)
C
05/11/2023
Violation issued (HPD, closed)
B
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
12/07/2021
Violation issued (HPD, closed)
C
12/07/2021
Violation issued (HPD, closed)
C
11/24/2021
Objection raised — Other
11/24/2021
Objection resolved — Addressed
11/09/2021
Filed — Alteration
MASONRY RESTORATION AND ROOF REPLACEMENT, WATERPROOFING INSTALLATION, LINTEL REPLECEMENT, LOCALIZEDMASONRY REPAIR, STUCCO FINISH REPLACEMENT, RAILING INSTALLATION, COATING INSTALLATION. NOCHANGE: USE, EGRESS, OCCUPANCY.
X00596209-I1
09/27/2021
Violation issued (HPD, open)
C
09/20/2021
Violation issued (HPD, open)
C
09/20/2021
Violation issued (HPD, open)
C
09/20/2021
Violation issued (HPD, closed)
B
09/20/2021
Violation issued (HPD, closed)
C
09/20/2021
Violation issued (HPD, closed)
C
09/20/2021
Violation issued (HPD, closed)
A
09/20/2021
Violation issued (HPD, closed)
A
09/17/2021
Special inspection requirement — Masonry
09/17/2021
Special inspection requirement — Post-installed Anchors
09/17/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/17/2021
Special inspection requirement — Final
09/17/2021
Special inspection requirement — Energy Code Compliance Inspections
09/17/2021
Special inspection requirement — Air barrier - visual inspection
05/20/2021
Violation issued (HPD, open)
A
03/11/2021
Violation issued (HPD, closed)
A
03/11/2021
Violation issued (HPD, closed)
C
03/11/2021
Violation issued (HPD, closed)
B
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISSPISSUEDDNA PLUMBING CONTR. INC08/20/2004
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/28/2003
BISPLISSUEDW.G.PL & HTG11/19/2002
BISSPISSUEDRIGHTWAY PLBG AND HTG INC11/19/2002
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/17/2021Masonry—special
09/17/2021Post-installed Anchors—special
09/17/2021Structural Stability – Alterations of existing buildings—special
09/17/2021Final—progress
09/17/2021Energy Code Compliance Inspections—progress
09/17/2021Air barrier - visual inspection—energy_progress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026X00596209-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X00596209-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00596209-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X00596209-I1Open ↗