← Back
BuildNYC
Zoned commercial or Manhattan residential
1009 2ND AVENUE
MANHATTAN · BIN 1038561
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C1-9Zoning
0 sfGross Floor Area
0Units
4 Active Violations 3 unresolved · 1 paperwork only 8 old, status unconfirmed ▸
Zoned commercial or Manhattan residential · Owner of record: LFL Partners · 3,508 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNal Management CORPUnder Construction8 filings
RoofRoof protection shedUnder Construction2p · 3 filings · 4 docs
Floor 1CGI Strategies in Real Estate2p · 2 filings
CellarCGI Strategies in Real Estate1p · 1 filing
Site & exteriorCGI Strategies in Real EstateUnder Construction7 filings · 16 docs
Filed — no permit issuedLfl Partners, LLC1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1009 Second Ave Associates2203/21/2026
Amazon1104/21/2026
LFL Partners1003/21/2026
1009 2nd A303/21/2026
Smart Consulting NY203/21/2026
Midtown203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2014$14.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1403/21/2026
JM Zoning1403/21/2026
Sierra Safety203/21/2026
Expedite Dem603/21/2026
Affinity Associates403/21/2026
BMG Group USA103/21/2026
Milrose Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1310/04/2026
New York Certified InternationalGeneral Contractor704/09/2026
N Tech Design of AmericaScaffold607/08/2026
F.S. WorksFire Protection407/08/2026
P.H. WorksPlumbing208/07/2026
N Tech Design of AmericaGeneral Contractor207/08/2026
Dynamix Scaffold GroupScaffold207/08/2026
New York Major ConstructionScaffold207/08/2026
Doria ScaffoldingScaffold104/09/2026
Jam ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Rigging7880310/09/2026
Big Apple Group NY A Rma91681004/17/2026
Philibert Engineering223109/20/2024
South Bay Engineering PLL6682101/16/2024
Building Lifecycle
All (189)Filed (36)Permit Issued (36)Signed Off (2)Violation (60)Inspection (6)Objection (19)Special Inspection (30)
10/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01367213-P2
10/09/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
09/28/2026
Permit issued — Sidewalk Shed
M01250601-I1-SH
09/28/2026
Permit issued — Protection and Mechanical Methods
M01288664-I1-PMM
09/09/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/08/2026
Permit issued — Protection and Mechanical Methods
M01284256-I1-PMM
08/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01250697-P1
08/06/2026
Permit issued — Plumbing
M00267386-I1-PL
08/06/2026
Violation issued (ECB, closed)
Construction
08/06/2026
Violation issued (ECB, closed)
Construction
08/06/2026
Violation issued (ECB, closed)
Unknown
08/06/2026
Violation issued (ECB, closed)
Construction
08/06/2026
Violation issued (ECB, open)
Unknown
08/06/2026
Violation issued (ECB, closed)
Construction
08/06/2026
Violation issued (ECB, closed)
Construction
08/03/2026
Permit issued — Supported Scaffold
M01250697-I1-SF
07/02/2026
Permit issued — Sidewalk Shed
M01250601-I1-SH
06/29/2026
Permit issued — Protection and Mechanical Methods
M01250577-I1-PMM
06/29/2026
Permit issued — Protection and Mechanical Methods
M01250576-I1-PMM
06/09/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
06/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01367213-P1
06/05/2026
Signed off — Alteration
Underpinning work as per plans filed. Filed in conjunction with NB #121206569.
M01183252-I1
05/14/2026
Permit issued — Construction Fence
M01223543-I1-FN
05/06/2026
Permit issued — Standpipe
M00270817-I1-EW-SD
05/05/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
04/17/2026
Filed — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB #121206569
M00267386-P3
04/10/2026
Filed — Alteration
STRUCTURAL WORK TYPE FOR RELATED NEW 19-STORY CAST-IN-PLACEFLAT SLAB REINFORCED CONCRETE BUILDING WITH CELLAR. Filed in conjunction with NB #121206569.
M00307582-P4
04/02/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
04/02/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
03/27/2026
Filed — Alteration
Underpinning work as per plans filed. Filed in conjunction with NB #121206569.
M01183252-P2
03/13/2026
Violation issued (ECB, closed)
Construction
03/05/2026
Permit issued — Suspended Scaffold
M01367213-I1-SC
03/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01367213-I1
03/02/2026
Special inspection requirement — Footing and Foundation
SOORJBALLY HARILALL
03/02/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
SOORJBALLY HARILALL
03/02/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
03/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
03/02/2026
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
03/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SOORJBALLY HARILALL
02/12/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Violation issued (ECB, closed)
Unknown
02/11/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Violation issued (ECB, closed)
Site Safety
02/11/2026
Violation issued (ECB, closed)
Construction
02/05/2026
Permit issued — Foundation
M01183252-I1-FO
01/27/2026
Violation issued (ECB, closed)
Construction
01/27/2026
Violation issued (ECB, closed)
Unknown
01/27/2026
Violation issued (ECB, closed)
Unknown
01/08/2026
Permit issued — Structural
M00307582-I1-ST
01/08/2026
Violation issued (ECB, closed)
Construction
01/06/2026
Permit issued — Foundation
M01183252-I1-FO
01/06/2026
Permit issued — Mechanical Systems
M00265563-I1-MS
12/26/2025
Violation issued (ECB, closed)
Construction
12/22/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
12/22/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
12/18/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems09/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems09/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems09/08/2026
DOB NOWPlumbingPermit IssuedP.H. Works08/06/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems08/03/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems07/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/29/2026
DOB NOWConstruction FencePermit IssuedNew York Major Construction05/14/2026
DOB NOWStandpipePermit IssuedF.S. Works05/06/2026
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding03/05/2026
DOB NOWFoundationSigned-offNew York Certified International02/05/2026
DOB NOWStructuralPermit IssuedNew York Certified International01/08/2026
DOB NOWFoundationSigned-offNew York Certified International01/06/2026
DOB NOWMechanical SystemsPermit IssuedNew York Certified International01/06/2026
DOB NOWStandpipePermit IssuedF.S. Works11/26/2025
DOB NOWSprinklersPermit IssuedF.S. Works11/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems10/10/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems09/10/2025
DOB NOWPlumbingPermit IssuedP.H. Works08/08/2025
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems08/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems07/03/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems07/03/2025
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems07/03/2025
DOB NOWFoundationSigned-offNew York Certified International07/03/2025
DOB NOWMechanical SystemsPermit IssuedNew York Certified International06/11/2025
DOB NOWStructuralPermit IssuedNew York Certified International06/10/2025
DOB NOWConstruction FencePermit IssuedNew York Major Construction05/22/2025
DOB NOWStandpipePermit IssuedF.S. Works05/08/2025
DOB NOWConstruction FenceSigned-offN Tech Design of America02/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offN Tech Design of America02/07/2025
DOB NOWSupported ScaffoldPermit IssuedDynamix Scaffold Group01/02/2025
DOB NOWSidewalk ShedPermit IssuedDynamix Scaffold Group01/02/2025
DOB NOWFull DemolitionSigned-offN Tech Design of America11/20/2024
DOB NOWConstruction FenceSigned-offN Tech Design of America11/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offN Tech Design of America11/08/2024
DOB NOWFull DemolitionSigned-offN Tech Design of America—
BIS—ISSUEDNew York Certified International12/16/2025
BIS—ISSUEDNew York Certified International08/21/2025
BIS—ISSUEDNew York Certified International08/21/2025
+ 34 more permits on file
1 project · most recent 07/24/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2024Permit IssuedNew York Certified InternationalAir Conditioning Systems, Heating Systems, Ventilation Systems
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×105
MUH03-8 10,200 BTU · Unit Heater ×24
Lg ×3
Ventilation
Greenheck G-097-VG 200 CFM · Exhaust Fan ×9
G-103-VG 720 CFM · Exhaust Fan ×9
G-098-VG 360 CFM · Exhaust Fan ×6
Renewaire HE1.5XRT 1,040 CFM · Erv ×3
2 projects · most recent 07/11/2024
FiledStatusContractorScope
07/11/2024Permit IssuedF.S. Works2 outlets
07/11/2024Permit IssuedF.S. Works536 heads, 1 outlets
2 projects · most recent 04/17/2026
Storm Gas Water/Sanitary
FiledStatusContractorScope
04/17/2026Permit IssuedP.H. WorksGas, Storm, Water/Sanitary
02/19/2025——Storm
7 projects · most recent 01/19/2026
General Wiring
FiledStatusContractorScope
01/19/2026Permit IssuedJam Electrical—
01/11/2026Permit IssuedReliable Electrical Contractors—
09/17/2025Permit IssuedSolas Electrical—
07/02/2025Permit IssuedSolas Electrical—
06/22/2025Permit IssuedReliable Electrical ContractorsGeneral Wiring
03/12/2025Permit IssuedHigh Quality Electric of NYC—
12/10/2024Permit IssuedS&R Electrical & Mechanical1 meters, 1 new_meters
2 projects · most recent 04/10/2026
Concrete
FiledStatusContractorScope
04/10/2026Permit IssuedNew York Certified InternationalConcrete
03/27/2026Signed-offNew York Certified International4 scope_items
3 projects · most recent 08/12/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/12/2026Permit IssuedCore Scaffold SystemsScaffold
11/11/2025Permit IssuedCore Scaffold SystemsSidewalk Shed
09/20/2024Signed-offN Tech Design of AmericaFence
1 project · most recent 10/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/09/2026Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/09/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/22/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
12/22/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
10/09/2026Post-installed AnchorsZELJKO STEVANOVICspecial
06/09/2026Post-installed AnchorsZELJKO STEVANOVICspecial
05/05/2026FinalSOORJBALLY HARILALLprogress
05/05/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
04/02/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
04/02/2026FinalSOORJBALLY HARILALLprogress
03/02/2026Subgrade InspectionsSOORJBALLY HARILALLspecial
03/02/2026Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
03/02/2026Footing and FoundationSOORJBALLY HARILALLprogress
03/02/2026FinalSOORJBALLY HARILALLprogress
03/02/2026Underpinning and alternate methods of support of buildings and adjacent propertySOORJBALLY HARILALLspecial
03/02/2026Subsurface Conditions – Fill Placement & In-Place DensitySOORJBALLY HARILALLspecial
08/06/2025Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
08/06/2025FinalSOORJBALLY HARILALLprogress
08/06/2025Footing and FoundationSOORJBALLY HARILALLprogress
08/06/2025Underpinning and alternate methods of support of buildings and adjacent propertySOORJBALLY HARILALLspecial
08/06/2025Subsurface Conditions – Fill Placement & In-Place DensitySOORJBALLY HARILALLspecial
08/06/2025Subgrade InspectionsSOORJBALLY HARILALLspecial
08/06/2025Prestressed Rock and Soil AnchorsSOORJBALLY HARILALLspecial
02/28/2025Final—progress
02/28/2025Concrete - Cast-In-Place—special
09/19/2024Structural Stability – Alterations of existing BuildingsJacky Philibertspecial
08/20/2024Standpipe SystemsSOORJBALLY HARILALLspecial
08/06/2024HVAC insulation and sealing SOORJBALLY HARILALLenergy_progress
08/06/2024Heating SystemsSOORJBALLY HARILALLspecial
Latest 25 of 65.
▾Documents — 413 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch19
08/27/2026M00989229-S3Request digital key ↗
08/27/2026M00989229-S1Request digital key ↗
08/27/2026M00989229-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
08/26/2026M00261304-I1Request digital key ↗
08/15/2026M00261304-P1Request digital key ↗
08/15/2026M00270817-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/17/2026M00307582-I1Request digital key ↗
08/17/2026M00307582-P1Request digital key ↗
08/17/2026M00307582-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/26/2026M00265563-I1Request digital key ↗
08/26/2026M00265563-P3Request digital key ↗
08/26/2026M00265563-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/17/2026M00267386-I1Request digital key ↗
08/17/2026M00267386-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026M00261304-I1Request digital key ↗
08/15/2026M00261304-P1Request digital key ↗
▸Applications & Permits84
▸BISPLAN / WORK APPROVAL APPLICATION51
08/13/2025121206569Open ↗
02/26/2025140878352Open ↗
02/26/2025121206569Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION27
12/17/2025121206569Open ↗
08/26/2025121206569Open ↗
08/26/2025121206569Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
06/04/2012110426496Open ↗
06/04/2012110426496Open ↗
04/25/2012110426496Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/27/2020140878352Open ↗
11/22/2019140878352Open ↗
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
05/22/2025121206569Open ↗
10/14/2020121206569Open ↗
09/02/2020121206569Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/18/2020121206569Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/14/2020121206569Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
08/12/2020121206569Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/18/2020121206569Open ↗
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature34
10/11/2026M01367213-P2Open ↗
08/27/2026M00989229-P1Open ↗
08/27/2026M00989229-S3Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
05/27/2025121206569Open ↗
05/27/2025121206569Open ↗
06/24/2014121007258Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
06/25/2012121108513Open ↗
06/21/2012121108522Open ↗
06/07/2012121088223Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
06/25/2012121108513Open ↗
06/21/2012121108522Open ↗
06/07/2012121088223Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/18/2026M00261304-I1Open ↗
10/11/2026M01367213-P2Open ↗
08/31/2026M00270817-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026M01183252-P2Open ↗
08/29/2026M00267386-I1Open ↗
08/29/2026M00307582-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/22/2019140878352Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING10
07/30/2012120863057Open ↗
07/30/2012120863057Open ↗
Showing 2 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
09/07/2012120863057Open ↗
08/23/2012120863057Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
06/24/2014121007258Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M00989229-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M00989229-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M00989229-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M00989229-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
07/21/2020140878352Open ↗
02/06/2020121206569Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/27/2025121206569Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/21/2020140878352Open ↗
▸Environmental & Asbestos20
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
04/25/2012121016603Open ↗
04/25/2012121051814Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
04/25/2012121016603Open ↗
04/25/2012121051814Open ↗
04/25/2012121051814Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWACP5/20/21 or V53
08/26/2026M00265563-P1Open ↗
08/26/2026M00265563-I1Open ↗
08/13/2026M00265563-P2Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026M00989229-I1Open ↗
08/14/2026M00989229-P1Open ↗
▸DOB NOWRodent Control1
08/13/2026M00989229-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY5
04/25/2012121016603Open ↗
04/25/2012121051814Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/15/2021121206569Open ↗
06/15/2021121206569Open ↗
06/18/2020121206569Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/27/2025121206569Open ↗
▸BISEN2 - As Built Energy Analysis1
02/09/2012120677605Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/22/2025121206569Open ↗
06/15/2021121206569Open ↗
06/15/2021121206569Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/27/2025121206569Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/18/2020121206569Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/27/2025121206569Open ↗
▸BISSOIL REPORT1
06/18/2020121206569Open ↗
▸Approvals, Objections & Sign-offs51
▸BISSCHEDULE A - OCCUPANCY / USE14
07/21/2021121206569Open ↗
07/16/2021121206569Open ↗
07/14/2021121206569Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/04/2014110456122Open ↗
06/24/2014121007258Open ↗
04/10/2014110456122Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/25/2012121108513Open ↗
06/21/2012121108522Open ↗
06/07/2012121088223Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/27/2025121206569Open ↗
05/27/2025121206569Open ↗
05/27/2025121206569Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER4
12/17/2025121206569Open ↗
08/26/2025121206569Open ↗
08/26/2025121206569Open ↗
Showing 3 of 4 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
06/18/2020121206569Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
06/24/2014121007258Open ↗
09/04/2012121051814Open ↗
06/25/2012121108513Open ↗
Showing 3 of 15 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/27/2025121206569Open ↗
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION20
08/21/2025121206569Open ↗
05/27/2025121206569Open ↗
05/09/2025121206569Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET15
11/15/2019121206569Open ↗
11/15/2019121206569Open ↗
01/03/2019123154228Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/22/2019140878352Open ↗
▸Other Documents20
▸DOB NOWManufacturer's Specifications3
10/11/2026M01367213-P2Open ↗
08/16/2026M01367213-P1Open ↗
08/13/2026M01367213-I1Open ↗
▸DOB NOWCalculations3
10/11/2026M01367213-P2Open ↗
08/16/2026M01367213-P1Open ↗
08/13/2026M01367213-I1Open ↗
▸BISPlot Diagram2
06/18/2020121206569Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStructure Photographs2
08/13/2026M00989229-I1Open ↗
08/13/2026M00989229-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026M00989229-I1Open ↗
08/14/2026M00989229-P1Open ↗
▸BISHPD: COMPLETION NOTICE1
05/11/2020121206569Open ↗
▸BISINR11
08/18/2021121206569Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/09/2020140878352Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
04/10/2020121206569Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M00989229-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M00989229-I1Open ↗