← Back
BuildNYC
Public elementary, junior or senior high
101-01 ROCKAWAY BOULEVARD
QUEENS · South Ozone Park · BIN 4202849
💬 Discuss this project
1929Year Built
4Stories
W1Building Class
R4Zoning
552,216 sfGross Floor Area
1Units
LL97 Covered23 Active Violations 0 unresolved · 23 paperwork only 1 likely answered 3 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 410,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority10803/21/2026
National Grid103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Consulting Engineering Group304/09/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Charan Electrical Enterp'sElectrical203/22/2026
Manda Electric CompanyElectrical203/21/2026
P J Dempsey & Co ElectricalElectrical103/21/2026
Everest ElectricElectrical103/22/2026
A & S ElectricElectrical103/21/2026
Kelleher ElectriciansElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351304/09/2024
Building Lifecycle
All (224)Filed (3)Violation (200)Special Inspection (2)
10/07/2026
Elevator Category 1 inspection report filed
04/22/2026
Failure to maintain building in code-compliant manner. At the time of inspection observed and noted at stair way-8 between 1ST and 2ND floorstair…
ECB violation · open
04/22/2026
28-301.1. Reissue: 35691783Z date of issue: 04/14/2025. Failure to provide ventilation to gas meter room per P115.6.(1968 code) fgc appendix(E4)…
ECB violation · open
04/22/2026
Exit door not self-closing properly. At the time of inspection observed and not at 3R door exit-9, 6, 1 all places one exit door and 2ND floor,…
ECB violation · open
04/22/2026
Reissue: 35691786Y date of issue: 04/14/2025. Failure to maintain building in code-compliant manner. At the time of inspection observed and noted…
ECB violation · open
02/19/2026
Boiler inspection report filed
Initial · defects found · Accepted
12/29/2025
VC19: failed to prepare/produce/submit required documentation: department of buildings certificate of compliance
FDNY_NOV violation · closed
12/16/2025
Elevator Category 1 inspection report filed
11/07/2025
Reissue #35677155R. Failure to maintain building in code-compliant manner. Noted at stair 3 and 4 bulkhead, spalling/missing plaster and cement…
ECB violation · open
11/07/2025
Reissue #35402456H. Failure to maintain building wall(s) or appurtenances. Noted at scattered locations of masonry facade vertical cracks inbrick…
ECB violation · open
10/23/2025
ADM-02-01: Failed to provide a Certificate of Occupancy or other authorization or approval issued by the Department of Building or other agency…
FDNY_ORDER violation · closed
10/23/2025
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
09/29/2025
EG-21-12: Failed to maintain required illumination level for means of egress, in violation of FC107.1, FC1027.1, 1938 BC 26-280.0, 1968 BC 27-381,…
FDNY_ORDER violation · closed
09/29/2025
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
09/29/2025
PA-21-01b: Failed to comply with the provisions of the construction codes, Fire Code, Fire Department rules, and applicable standards associated…
FDNY_ORDER violation · closed
06/13/2025
Boiler inspection report filed
Initial · defects found · Accepted
06/13/2025
Boiler inspection report filed
Initial · no defects · Accepted
04/14/2025
28-301.1. Reissue #35677157K. Failure to provide ventilation to gas meter room per P115.6(1968 code), fgc appendix e(E4)(2014 code). Noted at…
ECB violation · open
04/14/2025
Failure to maintain building in code-compliant manner. Noted at sub-cellar level, water leaking from swimming pool above. Approx 1" of standing…
ECB violation · open
07/11/2024
Elevator Category 5 inspection report filed
06/20/2024
VC19: failed to prepare/produce/submit required documentation: department of buildings certificate of compliance.
FDNY_NOV violation · closed
06/03/2024
Closed: Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
DOB violation · closed on the city's record
06/03/2024
Closed: Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
DOB violation · closed on the city's record
06/03/2024
Closed: Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
DOB violation · closed on the city's record
04/25/2024
Failure to maintain building in code-compliant manner. Illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. At 3…
ECB violation · closed
04/25/2024
Failure to maintain building in code-compliant manner. At bulkhead at stair 3 and 4 spalling concrete in auditorium ceiling leak water and at exit…
ECB violation · open
04/25/2024
27-misc. 28-misc, rc-misc. Miscellaneous violations. Reissue #35650872J. Failure to provide natural or mechanical ventilation to gas meter room per…
ECB violation · open
04/12/2024
Boiler inspection report filed
Initial · no defects · Accepted
04/12/2024
Boiler inspection report filed
Initial · defects found · Accepted
04/09/2024
Filed — Alteration
UPGRADE ELEVATOR MACHINE ROOMS - PROVIDING 4.0 TON HEAT PUMP SYSTEMS FOR ELEVATOR MACHINE ROOMS.
Q00787813-P1
04/08/2024
FES-02-01: Failed to obtain approval from Fire Department for special hazard fire extinguishing system listed in the comments, in violation of…
FDNY_ORDER violation · closed
04/08/2024
CC-21-01a: Failed to comply with provisions of the New York City codes, rules, standards, listing, or other approvals associated with the operation…
FDNY_ORDER violation · closed
09/15/2023
BF35:
FDNY_NOV violation · closed
05/26/2023
28-301.1 reissue#35650872J failure to provide natural or mechanical ventilation to gas meter room per P115.6(1968 code)fgc appendix E4 (2014CODE)at…
ECB violation · open
05/26/2023
Reissue#35650873L:exit door not self-closing at multiple level at various classrooms not close proerly does to defective hardware inches of door…
ECB violation · closed
03/24/2023
Boiler inspection report filed
Initial · no defects · Accepted
03/24/2023
Boiler inspection report filed
Initial · defects found · Accepted
12/16/2022
BF35:
FDNY_NOV violation · closed
09/28/2022
Closed: Cease use
DOB violation · closed on the city's record
08/05/2022
Filed — Alteration
UPGRADE ELEVATOR MACHINE ROOMS - PROVIDING 4.0 TON HEAT PUMP SYSTEMS FOR ELEVATOR MACHINE ROOMS.
Q00787813-I1
06/16/2022
Closed: Failure to submit an eer per ad. Code sec. 28-308.4 in 2020
DOB violation · closed on the city's record
05/20/2022
Filed — Alteration
VENT PIPE INSTALLATION FOR GAS METER ROOM IN ACCORDANCE WITH NYC FGC APPENDIX E.
Q00742998-I1
05/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
05/19/2022
Special inspection requirement — Final
Asma Hashmi
04/22/2022
28-301.1 failure to maintain building in code compliant manner.noted:observed at cellar electrical meter room has excessive amount of storage…
ECB violation · closed
04/22/2022
Exit door not self-closing.noted:observed at various locations each floor entire building numerous (fpsc) classroom doors not closing properly due…
ECB violation · closed
04/22/2022
28-301.1 re-issued #5555759M failure to provide ventilation to gas meter room per P115.6(1968 code)fgc appendix e(E4)(2014 code)noted:observed at…
ECB violation · open
03/30/2022
Boiler inspection report filed
Initial · defects found · Accepted
03/11/2022
BF35:
FDNY_NOV violation · closed
01/27/2022
BF35:
FDNY_NOV violation · closed
12/29/2021
Closed: Elevator: elevatorrequired (DOB violation)
DOB violation · closed on the city's record
10/06/2021
Cease use
DOB violation · closed · Issued 2021; DOB's record still lists it as active
10/06/2021
Elevator: elevatorrequired (DOB violation)
DOB violation · open · Issued 2021; DOB's record still lists it as active
10/06/2021
Elevator: elevatorrequired (DOB violation)
DOB violation · closed · Issued 2021; DOB's record still lists it as active
09/16/2021
3301.2 failure to safeguard all persons and property affected by construction operations.observed workers working on pipe scaffold along EXP1 and 2…
ECB violation · closed
07/02/2021
Boiler inspection report filed
Initial · no defects · Accepted
07/02/2021
Boiler inspection report filed
Initial · defects found · Accepted
06/20/2021
Failure to submit an eer per ad. Code sec. 28-308.4 in 2020
DOB violation · closed · Issued 2021; DOB's record still lists it as active
06/19/2021
BC3307.6.59 inspection following an adjustment or repair.at time of re-inspection for complaint #54848277 and #4848058. Observed vertical member…
ECB violation · closed
06/14/2021
Bc 3307.10 failure to maintain sidewalk shed is obstructin construction of rain gurdens.note:at time of inspection observed sidewalk shed installed…
ECB violation · closed
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Annex Masonry Restoration—
BIS—Varsity Plumbing and Heating—
BIS—Varsity Plumbing and Heating—
BIS—Ansu Construction—
BIS—Tameer—
BIS—Triangle Enterprise NYC I—
BIS—Triangle Enterprise NYC I—
BIS—Ansu Construction—
BIS—Varsity Plumbing and Heating—
BIS—Ansu Construction—
BIS—Tameer—
BIS—Tribeca Electrical—
BIS—Annex Masonry Restoration—
BIS—Varsity Plumbing and Heating—
BIS—Annex Masonry Restoration—
BIS—Tameer—
BIS—Triangle Enterprise NYC I—
BIS—Triangle Enterprise NYC I—
BIS—Ansu Construction—
BIS—Ansu Construction—
BIS—Varsity Plumbing and Heating—
BIS—Ansu Construction—
BIS—Tameer—
BIS—Triangle Enterprise NYC I—
BIS—Triangle Enterprise NYC I—
BIS—Tameer—
BIS—Ansu Construction—
BIS—Ansu Construction—
BIS—Tameer—
BIS—Varsity Plumbing and Heating—
BIS—Ansu Construction—
BIS—Tameer—
BIS—Varsity Plumbing and Heating—
BIS—Ansu Construction—
BIS—Triangle Enterprise NYC I—
BIS—Triangle Enterprise NYC I—
BIS—Mar-Sal Plumbing & Heating—
BIS—Tri State Construction & Mason—
BIS—Tri State Construction & Mason—
BIS—Tribeca Electrical—
+ 10 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00742998-I1Request the plans ↗
08/23/2026Q00787813-P1Request the plans ↗
08/23/2026Q00787813-I1Request the plans ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026Q00787813-P1Open ↗
08/23/2026Q00787813-I1Open ↗
08/13/2026Q00742998-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00787813-P1Open ↗
08/23/2026Q00787813-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/23/2026Q00787813-P1Open ↗
08/23/2026Q00787813-I1Open ↗
08/13/2026Q00742998-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026Q00742998-I1Open ↗