Walk-up apt, over six families with stores
101-16 101 AVENUE
QUEENS · BIN 4625162
💬 Discuss this project
2024Year Built
4Stories
C7Building Class
R6BZoning
8,743 sfGross Floor Area
9Units
1 Open Violation ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: J & K 116TH STREET LLC · 4,383 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof32p · 2 filings · 20 docs
Floor 431p · 2 filings · 20 docs
Floor 331p · 2 filings · 20 docs
Floor 232p · 3 filings · 20 docs
Floor 132p · 2 filings · 20 docs
Cellar32p · 2 filings · 20 docs
3 jobs · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteK.A.B. ELECTRIC CORPGeneral Wiring
02/20/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
10/25/2024CompleteRICHARD NEU—
Building Lifecycle
All (110)Filed (10)Permit Issued (12)Signed Off (5)Violation (37)Inspection (10)Objection (6)Special Inspection (30)
01/22/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/20/2026
Signed off — Alteration
Q00503945-I1
01/20/2026
Signed off — Alteration
Q00246548-I1
01/20/2026
Violation issued (ECB, open)
Construction
11/18/2025
Signed off — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NB APPLICATION JOB # Q00957403-I1 FILED IN DOB NOW
Q00212967-I1
11/18/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/21/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/16/2025
Signed off — Alteration
Q00206657-I1
08/07/2025
Permit issued — Mechanical Systems
Q00246548-I1-MS
07/24/2025
Signed off — Alteration
Q01126907-I1
06/04/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
06/04/2025
Special inspection requirement — HVAC insulation and sealing
SERGEY BOLOTOV
06/04/2025
Special inspection requirement — HVAC and service water heating equipment
SERGEY BOLOTOV
06/04/2025
Special inspection requirement — Sprinkler Systems
SERGEY BOLOTOV
06/04/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SERGEY BOLOTOV
06/04/2025
Special inspection requirement — HVAC and service water heating system controls
SERGEY BOLOTOV
05/16/2025
Filed — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NB APPLICATION JOB # Q00957403-I1 FILED IN DOB NOW
Q00212967-P2
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2025
Objection resolved — Addressed
04/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2025
Permit issued — Plumbing
Q00212967-I1-EW-SP
03/19/2025
Objection raised — Scope
03/07/2025
Filed — New Building
PROPOSED 4 STORY, 8 FAMILY MIXED USE NEW BUILDING WITH CELLAR. 1ST FLOOR HAS 3 COMMERCIAL STORES AND 1 APARTMENT. 2ND AND 3RD FLOORS CONSIST OF 2 APARTMENTS EACH AND THE 4TH FLOOR HAS 3 APARTMENTS.
Q00957403-P1
01/17/2025
Violation issued (ECB, closed)
Unknown
01/17/2025
Violation issued (ECB, closed)
Construction
01/16/2025
Violation issued (ECB, closed)
Unknown
01/16/2025
Violation issued (ECB, closed)
Construction
12/31/2024
Violation issued (ECB, closed)
Unknown
12/31/2024
Violation issued (ECB, closed)
Construction
12/31/2024
Violation issued (ECB, closed)
Construction
12/31/2024
Violation issued (ECB, closed)
Unknown
12/31/2024
Violation issued (ECB, closed)
Construction
12/31/2024
Violation issued (ECB, closed)
Unknown
12/31/2024
Violation issued (ECB, closed)
Unknown
12/23/2024
Permit issued — General Construction
Q00957403-I1-GC
12/23/2024
Permit issued — Construction Fence
Q00206657-I1-FN
12/20/2024
Permit issued — Structural
Q00503945-I1-ST
12/12/2024
Permit issued — General Construction
Q00957403-I1-GC
11/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/28/2024
Permit issued — Sidewalk Shed
Q01126907-I1-SH
10/22/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Younes Abouyaala
10/22/2024
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Preliminary
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Air barrier — testing
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Air barrier - visual inspection
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Fenestration areas
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Fenestration air leakage
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Metering
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY BOLOTOV
10/22/2024
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AREA CONSTRUCTION1607/08/2026
ALPHA SCAFFOLDING INC503/22/2026
J & K 116TH STREET LLC103/22/2026
PRIME CONSTRUCTION USA1503/22/2026
OWNER OF 114-20 101 AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2015$571K—Private party → J & K 116TH STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.605/16/2025
ARQUITECTURA VARELA110/15/2024
DAVID REYHAN PE106/03/2024
ROYAL ENGINEERING, P.C108/12/2019
MEHRABAN AHOURAIE108/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PIROOZ ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME CONSTRUCTION USAGeneral Contractor1407/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor303/21/2026
NEW AREA CONSTRUCTION INCGeneral Contractor203/21/2026
RICHARD NEUElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519305/16/2025
SJS INSPECTIONS AND CONSU8286705/16/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNEW AREA CONSTRUCTION INC08/07/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC04/16/2025
DOB NOWGeneral ConstructionPermit IssuedPRIME CONSTRUCTION USA12/23/2024
DOB NOWConstruction FenceSigned-offPRIME CONSTRUCTION USA12/23/2024
DOB NOWStructuralSigned-offPRIME CONSTRUCTION USA12/20/2024
DOB NOWGeneral ConstructionPermit IssuedPRIME CONSTRUCTION USA12/12/2024
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC10/28/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C09/17/2024
DOB NOWStructuralSigned-offPRIME CONSTRUCTION USA07/12/2024
DOB NOWGeneral ConstructionPermit IssuedPRIME CONSTRUCTION USA07/12/2024
DOB NOWCurb CutPermit IssuedPRIME CONSTRUCTION USA07/12/2024
DOB NOWConstruction FenceSigned-offPRIME CONSTRUCTION USA02/29/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/22/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
11/18/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/21/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/04/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
06/04/2025HVAC insulation and sealing SERGEY BOLOTOVenergy_progress
06/04/2025HVAC and service water heating equipment SERGEY BOLOTOVenergy_progress
06/04/2025Sprinkler SystemsSERGEY BOLOTOVspecial
06/04/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSERGEY BOLOTOVspecial
06/04/2025HVAC and service water heating system controls SERGEY BOLOTOVenergy_progress
10/22/2024Subsurface Investigations (Borings/Test Pits)Younes Abouyaalaspecial
10/22/2024Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
10/22/2024Fire-Resistance Rated ConstructionSERGEY BOLOTOVprogress
10/22/2024PreliminarySERGEY BOLOTOVprogress
10/22/2024Air barrier — testing SERGEY BOLOTOVenergy_progress
10/22/2024Air barrier - visual inspectionSERGEY BOLOTOVenergy_progress
10/22/2024Lighting in dwelling unitsSERGEY BOLOTOVenergy_progress
10/22/2024Fenestration and door U-factor and product ratingsSERGEY BOLOTOVenergy_progress
10/22/2024Maintenance informationSERGEY BOLOTOVenergy_progress
10/22/2024HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
10/22/2024Fenestration areasSERGEY BOLOTOVenergy_progress
10/22/2024Fenestration air leakageSERGEY BOLOTOVenergy_progress
10/22/2024MeteringSERGEY BOLOTOVenergy_progress
10/22/2024HVAC-R and service water heating system controlsSERGEY BOLOTOVenergy_progress
10/22/2024HVAC-R and service water heating equipmentSERGEY BOLOTOVenergy_progress
10/22/2024Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
10/22/2024Protection of exposed foundation insulationSERGEY BOLOTOVenergy_progress
10/22/2024Lighting controlsSERGEY BOLOTOVenergy_progress
10/22/2024Interior lighting powerSERGEY BOLOTOVenergy_progress
Latest 25 of 39.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch4
08/22/2026Q00503945-I1Request digital key ↗
08/21/2026Q01126907-I1Request digital key ↗
08/20/2026Q00957403-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/20/2026Q00212967-P2Request digital key ↗
08/20/2026Q00212967-P1Request digital key ↗
08/20/2026Q00212967-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/20/2026Q00212967-P2Request digital key ↗
08/20/2026Q00212967-I1Request digital key ↗
08/15/2026Q00212967-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00206679-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00206657-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION9
09/11/2025401612288Open ↗
08/22/2025421737936Open ↗
05/16/2025421912265Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/21/2025421912265Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00957403-P1Open ↗
08/13/2026Q00957403-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00957403-I1Open ↗
08/13/2026Q00957403-P1Open ↗
▸BISZONING DIAGRAM1
06/08/2020421737936Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00957403-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00206679-I1Open ↗
08/28/2026Q00206657-I1Open ↗
08/22/2026Q00503945-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00957403-P1Open ↗
09/02/2026Q00957403-P1Open ↗
09/02/2026Q00957403-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00957403-P1Open ↗
09/02/2026Q00957403-P1Open ↗
09/01/2026Q00503945-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/12/2019421737936Open ↗
11/12/2019421737936Open ↗
08/01/2019421737936Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00957403-I1Open ↗
08/13/2026Q00957403-P1Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
04/28/2020421737936Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
11/01/2019421912265Open ↗
08/22/2019421737936Open ↗
08/01/2019421737936Open ↗
▸DOB NOWStreet Tree Checklist2
08/20/2026Q00957403-I1Open ↗
08/15/2026Q00957403-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00957403-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/28/2020421737936Open ↗
04/28/2020421737936Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/21/2019421737936Open ↗
08/01/2019421737936Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026Q00957403-P1Open ↗
08/13/2026Q00957403-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/12/2019421737936Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/28/2020421737936Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00957403-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/08/2020421737936Open ↗
06/08/2020421737936Open ↗
11/07/2019421912265Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
06/03/2020421737936Open ↗
05/04/2020421737936Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/01/2019421912265Open ↗
08/01/2019421737936Open ↗
▸BISBOROUGH INTAKE FORM1
05/04/2020421737936Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
05/21/2025421912265Open ↗
04/23/2020421912265Open ↗
▸BISPLOT DIAGRAM2
08/22/2019421737936Open ↗
08/01/2019421737936Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00957403-P1Open ↗
08/13/2026Q00957403-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00957403-P1Open ↗
08/13/2026Q00957403-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q00957403-I1Open ↗
08/15/2026Q00957403-P1Open ↗