← Back
Predominantly retail with other uses
101-20 LIBERTY AVENUE
QUEENS · South Ozone Park · BIN 4201975
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R6BZoning
3,500 sfGross Floor Area
6Units
Rent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 10120 LIBERTY AVENUE LLC · 2,025 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 3 filings · 20 docs
Cellar11p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
101-20 LIBERTY AVENUE1707/08/2026
QUINTUNA SERVICES807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2020$1.2M—— → —$349/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANKAR K MANDAL P.E209/29/2021
S & S ARCHITECTURAL DESIGN,LLC501/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES503/21/2026
SOL SON CONTRACTOR ASSOCIATE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUINTUNA SERVICE CORPGeneral Contractor207/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
FRANK FODERAElectrical103/21/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519209/29/2021
S&S ARCHITECTURTAL DESIGN2840501/13/2021
Building Lifecycle
All (91)Filed (7)Permit Issued (5)Signed Off (1)Violation (60)Inspection (3)Objection (4)Special Inspection (11)
11/25/2025
Violation issued (HPD, closed)
I
12/05/2024
Violation issued (HPD, closed)
I
03/25/2024
Violation issued (HPD, closed)
C
11/29/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/18/2022
Violation issued (HPD, closed)
I
03/17/2022
Violation issued (HPD, closed)
I
01/20/2022
Permit issued — General Construction
Q00580445-I1-GC
01/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/21/2021
Permit issued — Plumbing
Q00580454-I1-PL
10/08/2021
Permit issued — General Construction
Q00580445-I1-GC
09/29/2021
Filed — Alteration
Q00580454-I1
09/23/2021
Filed — Alteration
FILE PROPOSED BEAUTY SALON WITH MINOR INTERIOR RENOVATION AT EXISTINGCOMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.
Q00580445-I1
08/05/2021
Violation issued (HPD, open)
B
08/05/2021
Violation issued (HPD, open)
B
08/05/2021
Violation issued (HPD, open)
B
08/05/2021
Violation issued (HPD, open)
B
08/05/2021
Violation issued (HPD, open)
B
01/20/2021
Objection resolved — Addressed
01/20/2021
Objection resolved — Addressed
01/15/2021
Objection raised — Scope
01/15/2021
Objection raised — Scope
01/13/2021
Filed — Alteration
INSTALL THREE NEW HOT WATER HEATER WITH ONE NEW BOILER ON EXISTING GAS LINE
Q00428375-P1
01/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAWN STILES
01/12/2021
Special inspection requirement — Energy Code Compliance Inspections
SHAWN STILES
01/07/2021
Permit issued — Plumbing
Q00428375-I1-PL
12/14/2020
Signed off — Alteration
filing to address violation #39022138n,#39022112p, #039022137l, 32076588j, to address the partial vacate order #4201975 in removing capping existing showers, kitchen sinks,hand sinks. also replacing plumbing fixtures wc, lav on existing roughing
Q00354210-I1
11/16/2020
Filed — Alteration
INSTALL THREE NEW HOT WATER HEATER WITH ONE NEW BOILER ON EXISTING GAS LINE
Q00428375-I1
11/06/2020
Special inspection requirement — Fire-Resistance Rated Construction
SHAWN STILES
11/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAWN STILES
11/06/2020
Special inspection requirement — Energy Code Compliance Inspections
SHAWN STILES
10/31/2020
Filed — Alteration
filing to address violation #39022138n,#39022112p, #039022137l, 32076588j, to address the partial vacate order #4201975 in removing capping existing showers, kitchen sinks,hand sinks. also replacing plumbing fixtures wc, lav on existing roughing
Q00354210-P2
10/30/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAWN STILES
10/30/2020
Special inspection requirement — Energy Code Compliance Inspections
SHAWN STILES
10/30/2020
Special inspection requirement — Fire-Resistance Rated Construction
SHAWN STILES
10/01/2020
Filed — Alteration
filing to address violation #39022138n,#39022112p, #039022137l, 32076588j, to address the partial vacate order #4201975 in removing capping existing showers, kitchen sinks,hand sinks. also replacing plumbing fixtures wc, lav on existing roughing
Q00354210-P1
09/21/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAWN STILES
09/21/2020
Special inspection requirement — Energy Code Compliance Inspections
SHAWN STILES
09/21/2020
Special inspection requirement — Fire-Resistance Rated Construction
SHAWN STILES
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2020
Permit issued — Plumbing
Q00354210-I1-PL
06/17/2020
Filed — Alteration
filing to address violation #39022138n,#39022112p, #039022137l, 32076588j, to address the partial vacate order #4201975 in removing capping existing showers, kitchen sinks,hand sinks. also replacing plumbing fixtures wc, lav on existing roughing
Q00354210-I1
06/02/2020
Violation issued (HPD, closed)
B
05/28/2020
Violation issued (HPD, closed)
I
05/26/2020
Violation issued (HPD, open)
B
05/26/2020
Violation issued (HPD, open)
C
05/26/2020
Violation issued (HPD, closed)
B
05/26/2020
Violation issued (HPD, open)
B
05/26/2020
Violation issued (HPD, open)
C
05/11/2020
Violation issued (ECB, closed)
Construction
05/11/2020
Violation issued (ECB, closed)
Quality of Life
05/11/2020
Violation issued (ECB, closed)
Construction
05/11/2020
Violation issued (ECB, closed)
Quality of Life
05/11/2020
Violation issued (ECB, closed)
Construction
05/11/2020
Violation issued (ECB, closed)
Quality of Life
05/11/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedQUINTUNA SERVICE CORP01/20/2022
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP12/21/2021
DOB NOWGeneral ConstructionPermit IssuedQUINTUNA SERVICE CORP10/08/2021
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT01/07/2021
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT08/07/2020
BISOTISSUEDBEST NY CONSTRUCTION INC08/11/2020
1 project · most recent 01/13/2021
Gas
FiledStatusContractorScope
01/13/2021Permit IssuedHORBRIDGE PLUMBING & HEATGas
4 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC7 meters
11/14/2021Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
10/06/2020CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/02/2020Permit IssuedJOSEPH WEINSTEIN ELECTRIC7 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/12/2021Fire-Resistant Penetrations and JointsSHAWN STILESspecial
01/12/2021Energy Code Compliance InspectionsSHAWN STILESprogress
11/06/2020Fire-Resistance Rated ConstructionSHAWN STILESprogress
11/06/2020Fire-Resistant Penetrations and JointsSHAWN STILESspecial
11/06/2020Energy Code Compliance InspectionsSHAWN STILESprogress
10/30/2020Fire-Resistant Penetrations and JointsSHAWN STILESspecial
10/30/2020Energy Code Compliance InspectionsSHAWN STILESprogress
10/30/2020Fire-Resistance Rated ConstructionSHAWN STILESprogress
09/21/2020Fire-Resistant Penetrations and JointsSHAWN STILESspecial
09/21/2020Energy Code Compliance InspectionsSHAWN STILESprogress
09/21/2020Fire-Resistance Rated ConstructionSHAWN STILESprogress
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing5
08/28/2026Q00354210-I1Request digital key ↗
08/27/2026Q00428375-I1Request digital key ↗
08/15/2026Q00354210-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch2
08/27/2026Q00580445-I1Request digital key ↗
08/27/2026Q00580454-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
06/29/2020421216972Open ↗
06/16/2020421216972Open ↗
06/12/2020421216972Open ↗
▸BISWORK PERMIT APPLICATION2
09/17/2020421216972Open ↗
08/12/2020421216972Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/10/2020421216972Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00354210-P1Open ↗
08/31/2026Q00354210-P1Open ↗
08/29/2026Q00354210-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00354210-I1Open ↗
08/28/2026Q00354210-P1Open ↗
08/28/2026Q00354210-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q00354210-P1Open ↗
08/29/2026Q00354210-P2Open ↗
08/25/2026Q00354210-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026Q00354210-P2Open ↗
08/13/2026Q00354210-P1Open ↗
08/13/2026Q00354210-I1Open ↗
▸BISTenant Protection Plan and Notes1
06/10/2020421216972Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026Q00354210-P2Open ↗
08/28/2026Q00354210-I1Open ↗
08/28/2026Q00354210-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/31/2020421216972Open ↗
06/30/2020421216972Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/13/2020421216972Open ↗
08/06/2020421216972Open ↗
06/26/2020421216972Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/13/2020421216972Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/19/2020421216972Open ↗
11/13/2020421216972Open ↗
08/06/2020421216972Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/19/2020421216972Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/13/2020421216972Open ↗
07/31/2020421216972Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
06/02/2020421216972Open ↗
▸BISADDITIONAL INFORMATION1
08/04/2020421216972Open ↗
▸BISBOROUGH INTAKE FORM1
06/02/2020421216972Open ↗