← Back
Two stories - detached, small or mid-size
101-32 120 STREET
QUEENS · South Richmond Hill · BIN 4200573
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R4AZoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLANKI ENGINEERING, PC108/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&R CONTRACTING MGMT CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLANKI ENGINEERING, P.C.8451108/29/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (2)
09/11/2025
Signed off — Alteration
REMOVE EXISTING REAR ONE STORY SHED (18'X25'X10') ALONG WITH ROOF AND SUPPORTING POLES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01277071-I1
09/02/2025
Permit issued — General Construction
Q01277071-I1-GC-CX
08/29/2025
Filed — Alteration
REMOVE EXISTING REAR ONE STORY SHED (18'X25'X10') ALONG WITH ROOF AND SUPPORTING POLES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01277071-I1
08/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashray Solanki
08/25/2025
Special inspection requirement — Final
Ashray Solanki
01/09/1998
Violation issued (ECB, closed)
Construction
05/08/1997
Violation issued (ECB, closed)
Construction
05/08/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR&R CONTRACTING MGMT CORP09/02/2025
BISPLISSUEDWOODHAVEN PLUMBING AND HEATING06/29/1998
BIS—ISSUEDBROTHER OF OWNER04/10/1998
1 project · most recent 09/12/2025
FiledStatusContractorScope
09/12/2025CompleteVILLAGE ELECTL CONTRS INC—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/25/2025Structural Stability – Alterations of existing buildingsAshray Solankispecial
08/25/2025FinalAshray Solankiprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01277071-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01277071-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01277071-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01277071-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01277071-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01277071-I1Open ↗