RoofUnder Construction46p · 4 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Structural
Structural work related to facade replacement as per plans. No change to use, egress, or occupancy. Related Job numbers: M01277287, M01283766
On file for this job
11 documents
Partial Demolition of facade for building, interior demolition for facade demolition and removal of roofing at all roofs. This is a subsequent filing as per the approved application M01277287-I1.
On file for this job
9 documents · 2 drawing sheets
Filing for new streetscape improvements around building frontage and within PAA space at the corner of Murray Street and West Street. Improvements include new landscaping with seating and new security infrastructure. No change in use, egress, or occupancy
On file for this job
20 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 25Under Construction30p · 2 filings · 20 docs
Structural
Issued Permit Scope
Structural
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Structural work related to column reinforcement on floors 19 -24, and structural perimeter reinforcement and derrick reinforcement, from floors 19- Roof as per updated plans. No change to use, egress, or occupancy.
On file for this job
21 documents
Floor 24Under Construction21p · 2 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural work related to column reinforcement on floors 19 -24, and structural perimeter reinforcement and derrick reinforcement, from floors 19- Roof as per updated plans. No change to use, egress, or occupancy.
On file for this job
21 documents
Floor 23Under Construction25p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Structural
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
Weather wall on floors 1 -23, as per plans. Filed and fees paid in conjunction with DOBNOW # M01308436-I1. No change to use, egress, or occupancy.
On file for this job
2 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 22Under Construction154p · 25 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Application filed herewith for the removal of existing Sprinkler Heads and installation of Sprinkler Temp loop as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 21Under Construction117p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Latest 3 of 8 filings on this floor.
Floor 20Under Construction112p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 19Under Construction104p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 8 filings on this floor.
Floor 18Under Construction103p · 7 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 7 filings on this floor.
Floor 17150p · 25 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Application filed for interior work only with a change of occupancy for the new PA space. NO CHANGE TO ZONING BULK PROPSED UNDER THIS APPLICATION.
On file for this job
8 documents · 3 drawing sheets
Removal and relocation of plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Installation of new ductwork, VAVs, air outlets, thermostats, and (1) FCU and its corresponding piping.
On file for this job
10 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 16Under Construction112p · 10 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Latest 3 of 8 filings on this floor.
Floor 15Under Construction120p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 14Under Construction103p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 7 filings on this floor.
Floor 13Under Construction103p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 7 filings on this floor.
Floor 12Under Construction13p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 8 filings on this floor.
Floor 11130p · 19 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Installation on non bearing partitions and finishes as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this job
8 documents · 11 drawing sheets
SCOPE OF WORK UNDER THIS CONTRACT SHALL INCLUDE REMOVAL OF EXISTING SPRINKLER HEADS, BRANCH PIPING AND MAIN, AND INSTALLATION OF NEW TEMPORARY SPRINKLER LOOP.
On file for this job
6 documents · 1 drawing sheet
REMOVE DUCTWORK, PIPING, HVAC EQUIPMENT, CONTROLS, EXHAUST FANS, AIR OUTLETS, ETC., CURRENTLY SERVING THE PREMISES. EQUIPMENT, PIPING, AND DUCTWORK WITHIN THE PREMISES BUT SERVING OTHER SPACES ARE TO REMAIN AND BE PROTECTED.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 10Under Construction132p · 12 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 9Under Construction104p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 7 filings on this floor.
Floor 8Under Construction13p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 8 filings on this floor.
Floor 7Under Construction143p · 14 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 2 drawing sheets
Modification of existing sprinkler system on 7th floor.
On file for this job
4 documents · 1 drawing sheet
Demolition of existing ductwork, VAVs, and air outlets, back to existing shaft. Reconnection to existing supply shaft for new ductwork distribution.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 6Under Construction104p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Latest 3 of 7 filings on this floor.
Floor 5Under Construction121p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Modifications to the existing Sprinkler / Standpipe system on the BNY Lobby Level (1st Floor Entry) and atrium, as per plans. No change to use, egress, or occupancy.
On file for this job
10 documents
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Latest 3 of 8 filings on this floor.
Floor 4Under Construction108p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Modifications to the existing Sprinkler / Standpipe system on the BNY Lobby Level (1st Floor Entry) and atrium, as per plans. No change to use, egress, or occupancy.
On file for this job
10 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Latest 3 of 8 filings on this floor.
Floor 3Under Construction107p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents
Modifications to the existing Sprinkler / Standpipe system on the BNY Lobby Level (1st Floor Entry) and atrium, as per plans. No change to use, egress, or occupancy.
On file for this job
10 documents
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Latest 3 of 8 filings on this floor.
Floor 2Under Construction210p · 14 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 4 drawing sheets
Removal and installation of air conditioning systems, fans, and related piping as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.
Floor 1Under Construction196p · 18 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors.
On file for this job
17 documents
Modifications to the existing sprinkler and standpipe systems on the Cellar (A Level), as per plans. No change to use, egress, or occupancy.
On file for this job
8 documents
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction118p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
Modifications and additions of plumbing fixtures and piping on the BNY Facade as per plans. No change to use, egress, of occupancy.
On file for this job
3 documents
Modifications to HVAC system in Cellar (A Level), including alteration to ducts and piping, and the addition of new units, as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Modifications to the existing sprinkler and standpipe systems on the Cellar (A Level), as per plans. No change to use, egress, or occupancy.
On file for this job
8 documents
Latest 3 of 8 filings on this floor.
CellarUnder Construction201p · 19 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
Alt CO to establish new uses and Amenity Public Assembly Space on Cellar floor.
On file for this job
18 documents
Modifications to HVAC system in Cellar (A Level), including alteration to ducts and piping, and the addition of new units, as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents
Structural modifications to the Cellar (Level A) as per plans. No change to use, egress, or occupancy.
On file for this job
5 documents
Latest 3 of 8 filings on this floor.
BasementUnder Construction3p · 3 filings · 20 docs
ArchitectureMechanicalStructural
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
On file for this job
15 documents · 1 drawing sheet
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Interior renovation of the Cellar (A Level), including ceilings, partitions, floors and finishes as per plans. No change to use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Sub-BasementUnder Construction1 filing · 3 docs
Issued Permit Scope
Protection and Mechanical Methods
FILING PLANS FOR PMM MECHANICAL DEMOLITION IN BASEMENT
On file for this job
3 documents