← Back
Two stories - detached, small or mid-size
101 HILLCREST TERRACE
STATEN ISLAND · BIN 5045130
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R2Zoning
1,812 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,825 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC110/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMBER ELECTL CONTNG INCElectrical103/22/2026
FICAZZOLA CONSULTING LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176110/30/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/18/2026
Signed off — Alteration
S01310792-I1
11/06/2025
Permit issued — Solar
S01310792-I1-SL
10/30/2025
Filed — Alteration
S01310792-I1
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
10/29/2025
Special inspection requirement — Final
James Clancy
10/29/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING11/06/2025
2 projects · most recent 11/25/2025
FiledStatusContractorScope
11/25/2025CompleteAMBER ELECTL CONTNG INC1 meters
10/25/2025CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/29/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
10/29/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
10/29/2025Energy Code Compliance InspectionsJames Clancyprogress
10/29/2025FinalJames Clancyprogress
10/29/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01310792-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S01310792-I1Open ↗
08/25/2026S01310792-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01310792-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01310792-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01310792-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01310792-I1Open ↗