ECB09/04/2026FAILED TO NOTIFY THE DEPT OF A INCIDENT THAT RESULTED IN A FATALITY OR INJURY. AT TIME OF MY INSPECTION UPON REVIEWOF DEPT RECORDS IT REVEALED THAT THERE WERE NO ELECTRONICALLY FILING OF AN INCIDENT WITHIN 3 BU$10K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/23/2024FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
DOB04/22/2023FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
DOB02/23/2023EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXP4(SOUTH ELEV)OBSERV DETERIORATED/CRACK STUCCO AT THE PARAPET WALL AT MULTIPLE LOCATIONS AND DAMAGED MORTAR JOINT/PEELING OFF STUCCO WITHOUT ANY SAFETY MEASURES FOR ROOF OF ADJ BLDG. REMEDY: IMMED PROVIDE SAFETY MEASURES FOR EXP4(SOUTH ELEV)FOR ADJ BLDG 99 LAFAYETTE ST TO PROTECT THE PEOPLE
DOB02/21/2023CYCLE 9B UNSAFE REPORT FILED
DOB08/21/2022FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
DOB06/20/2021FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
DOB06/29/2020FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB03/18/2019FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB03/27/2018FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2017
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB01/01/2012FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB03/21/2008V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB08/08/2002V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/19/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB03/08/1996V-DOB VIOLATION - ACTIVE
DOB04/17/1995V-DOB VIOLATION - ACTIVE
DOB03/18/1994V-DOB VIOLATION - ACTIVE
DOB03/22/1993VP-VIOLATION UNSERVED ECB-ACTIVE
DOB03/22/1993VP-VIOLATION UNSERVED ECB-ACTIVE
DOB03/22/1993V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
DOB04/25/19913
DOB06/29/19903
DOB03/30/1990V-DOB VIOLATION - ACTIVE
DOB03/29/1990V-DOB VIOLATION - ACTIVE
DOB10/12/19893
ECB08/03/200450A 50B 50C 50D FUCTON V.T. BOILER, 15HP, NB59823, GAS, 1990 50A NO HANGER ON THE FLUE PIPE INSTALL HAGER TO BOILR ROOM CEILING 50B IMPROPER ARRANGEMENT OF THE BLOWDOWN VALVES 50C NO SLAIN LINE ON THE GAUGE GLANothing owed — awaiting certificate of correction
ECB08/03/200450 FUCTON V.T. BOILER, 10HP, NB54880, GAS, 1998 50 HIGH PRESSURE BOILER INSTALLED & IN OPERATION ON AN OPEN FL INSTALL/CONSTRUCT A BOILER ROOM FOR CODE COMPLIANCENothing owed — awaiting certificate of correction
ECB06/14/200249A 49B. 49A NO DISCHARGE PIPE ON SAFETY VALVE. 49B EXCESSIVE LINT DEPOSITS IN BOILER ROOM.Nothing owed — awaiting certificate of correction
ECB06/14/200218A, 18B, 49A, 49B. 49A- BOILER ANDSURROUNDINGS DIRTY 18A,B- HANDHOLES CORRODED. 49B SAFETY VALVE DISCHARGE TOO SHORT AND WITH SHREADED END.Nothing owed — awaiting certificate of correction
ECB06/14/200230A, 49A, 49B, 49C. 30A WATER COLUMN DRAIN LINE CORRODED 49A NO DISCHARGE PIPING ON SAFETY VALVE 49B PRESSURE GAUGE FACE GLASS BROKEN. 49C BOILER SURROUNDINGS CONGESTED AND DIRTY.Nothing owed — awaiting certificate of correction
ECB06/14/200249 NO DISCHARGE PIP ON SAFETY VALVE.Nothing owed — awaiting certificate of correction
ECB03/24/19983A,3B,18A,18B,Nothing owed — awaiting certificate of correction
ECB01/05/19983A,12B,18A,18B,48A,48B. 3A-FLUE PIPE CORRODED. 12B-COMBUSTION CHAMBERTARGETWALL. 18A-HANDHOLES CORRODED. 18B-HANDHOLES LEAKING. 48A-WATERGAUGE GLASS DIRTY. 48B-WATER GAUGE GLASS LEAKING.Nothing owed — awaiting certificate of correction
ECB04/08/199346A,32. VALVE HANDLE MISSING FROM SIGHT GLASS WATER END.DIRTY GLASS REPLACE SAME.Nothing owed — awaiting certificate of correction
ECB04/08/199311C. 1"BLOW DOWN VALVE LEAKING REPLACE OR REPAIR SAME.Nothing owed — awaiting certificate of correction
ECB01/20/199336Nothing owed — awaiting certificate of correction
ECB01/20/199336Nothing owed — awaiting certificate of correction
ECB12/29/19923C,17B,46A,46A,32. SLOW OPENING VALVE IN BLOW DOWN AND WATER DRAIN TO FIT. GAGE GLASS TO BE FITTED WITH STOP VALVE AND DRAIN PIPE FOOD BAGS LAYING ON TOP OF THE BOILER HAZARD.Nothing owed — awaiting certificate of correction
ECB10/20/1989ALL FIXTURES & TABLES SHALL BE REMOVED FROM REAR THE BOILER ATLEAST 24 INCHES B) GAGE GLASS TO BE FITTED WITH DRAIN PIPENothing owed — awaiting certificate of correction
ECB12/09/1988BOILER AREA CONGESTED WITH REFUSE ON ONE SIDE AND WORKING BENCH ON THE OTHER SIDE COMPLETE INSPECTION CAN'T BE DONE AREA TO BE CLEANED FREE FOR INSPECTIONNothing owed — awaiting certificate of correction