← Back
BuildNYC
Two stories - detached, small or mid-size
101 PORTLAND PLACE
STATEN ISLAND · BIN 5002944
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3AZoning
1,752 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,880 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorProposed curb cut and fence2p · 2 filings · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture204/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ryan Design Architecture103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LL Custom HomesScaffold407/08/2026
A&E Electrical SystemsElectrical103/22/2026
LL Custom HomesGeneral Contractor107/08/2026
Building Lifecycle
09/22/2022
Illegal addition at exposure 3 completed without permits, obtain permit
ECB violation · open
09/14/2022
Signed off — Alteration
TEMPORARY FENCE
S00203027-I1
09/12/2022
Signed off — Alteration
S00159009-I1
03/23/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/19/2021
Permit issued — Curb Cut
S00159009-I1-CC
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLL Custom Homes05/19/2021
DOB NOWConstruction FenceSigned-offLL Custom Homes10/13/2020
DOB NOWConstruction FenceSigned-offLL Custom Homes08/28/2020
DOB NOWConstruction FenceSigned-offLL Custom Homes09/26/2019
BISPLISSUEDPipestylists10/26/2021
BIS—ISSUEDLL Custom Homes10/17/2020
BISPLISSUEDCam Energy Heating and Me06/10/2020
BIS—ISSUEDLL Custom Homes06/03/2020
2 projects · most recent 02/22/2022
General Wiring
FiledStatusContractorScope
02/22/2022CompleteD.R.P. Electrical ContractingGeneral Wiring
06/09/2020Permit IssuedA&E Electrical SystemsGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/23/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/31/2019FinalJIAN DENGprogress
52 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account