Predominantly retail with other uses
101 SOUTH 6 STREET
BROOKLYN · Williamsburg · BIN 3339457
💬 Discuss this project
1920Year Built
4Stories
K4Building Class
C4-3Zoning
20,150 sfGross Floor Area
3Units
Rent Stabilized31 Open Violations 27 unresolved · 4 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 107-109 S6 LLC · 5,525 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 456p · 1 filing · 20 docs
Floor 353p · 1 filing · 20 docs
Floor 251p · 1 filing · 20 docs
Floor 1Under Construction55p · 2 filings · 20 docs
Mezzanine48p · 1 filing · 20 docs
Cellar51p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP3509/01/2026
LION JOINT VENTURES103/22/2026
JOYLAND GROUP103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2024$10.0M—WILLIAMSBURG WORKSHOP LLC → 107-109 S6 LLC$496/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor907/08/2026
TCHORS LLCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
CS BRIDGE CORPGeneral Contractor207/08/2026
YOSEF BLAUElectrical203/21/2026
GLOBAL LUXURY SRVCS INCGeneral Contractor108/07/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161708/04/2026
RAMIREZ ENGINEERING PLLC8679106/11/2026
Building Lifecycle
All (177)Filed (22)Permit Issued (14)Signed Off (9)Violation (60)Inspection (13)Objection (29)Special Inspection (30)
09/03/2026
Objection resolved — Addressed
08/20/2026
Objection raised — Other
08/06/2026
Permit issued — Mechanical Systems
B01374704-I1-MS
08/04/2026
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-A4
07/07/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/02/2026
Objection resolved — Resolved
06/30/2026
Objection raised — Other
06/11/2026
Filed — Alteration
install a kitchen exhaust system and make up fresh air at at a commercial kitchen on the 1st floor.
B01374704-I1
05/21/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/21/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
05/21/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/21/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/21/2026
Special inspection requirement — Metering
FAHAD FATEH
05/21/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/21/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/21/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/21/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/21/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/18/2026
Special inspection requirement — Mechanical Systems
Amauris Ramirez
03/18/2026
Special inspection requirement — Final
Amauris Ramirez
12/08/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/21/2025
Violation issued (HPD, closed)
I
10/16/2025
Signed off — Alteration
B00050372-I1
10/14/2025
Signed off — Alteration
B01166681-I1
10/14/2025
Signed off — Alteration
B01166677-I1
10/03/2025
Objection raised — Other
09/12/2025
Objection raised — Admin
09/11/2025
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-A3
09/05/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/02/2025
Signed off — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-S1
08/14/2025
Signed off — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-S2
08/13/2025
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-P9
08/13/2025
Signed off — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-S3
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/11/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/11/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/11/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/11/2025
Special inspection requirement — Metering
Paul Raymond
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/11/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/11/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/11/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/11/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/11/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
08/11/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/22/2025
Objection raised — Other
07/10/2025
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-P8
06/25/2025
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-P6
06/23/2025
Filed — Alteration CO
PLUMBING SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00977146-I1.
B00977146-P7
06/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/13/2025
Violation issued (HPD, closed)
A
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGLOBAL LUXURY SRVCS INC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP04/09/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/26/2025
DOB NOWFoundationSigned-offMJH CONSTRUCTION CORP02/13/2025
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/14/2025
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP01/14/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/20/2024
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP11/21/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP11/07/2024
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP10/30/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP10/30/2024
DOB NOWConstruction FenceSigned-offMJH CONSTRUCTION CORP10/29/2024
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC09/23/2024
DOB NOWConstruction FenceSigned-offMJH CONSTRUCTION CORP08/14/2020
BISOTISSUEDLION JOINT VENTURES LLC08/15/2018
BIS—ISSUEDEXO INDUSTRIES CORP05/25/2018
BIS—ISSUEDEXO INDUSTRIES CORP03/09/2018
BIS—ISSUEDGABOR HOME IMPROVEMENT08/17/2017
BISPLISSUEDPREMIER PIPE SOLUTIONS08/04/2016
BIS—ISSUEDGABOR HOME IMPROVEMENT06/14/2016
BISOTISSUEDA J IRONWORK INNOVATIONS09/17/2014
BISPLISSUEDHYDROKINETIC PLBG & HTG I11/25/2013
BISOTISSUEDMONACO GROUP USA INC11/14/2013
BISEQISSUEDJ & G GNRL CONTRNG INC05/07/2007
2 projects · most recent 08/04/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Permit IssuedMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXM18AVJU9 18,500 BTU · Condensing Unit ×20
3MXM24AVJU9 24,000 BTU · Condensing Unit ×12
4MXM36AVJU9 36,000 BTU · Condensing Unit ×12
RX12BXVJU 14,400 BTU · Condensing Unit ×12
RX18BXVJU 21,600 BTU · Heat Pump Outdoor ×6
Mitsubishi Electric MXZ-5C42NA4 14,400 BTU · Heat Pump Outdoor ×2
06/11/2026Permit IssuedGLOBAL LUXURY SRVCS INCVentilation Systems—
1 project · most recent 08/04/2026
Sprinkler System
FiledStatusContractorScope
08/04/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Signed-offA M B MECHANICAL INC—
7 projects · most recent 09/30/2025
General Wiring
FiledStatusContractorScope
09/30/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
07/07/2025Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
07/07/2025Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
01/22/2025Permit IssuedNASH ELECTRIC SERVICES IN—
12/19/2024CompleteDENALI ELECTRIC CORP—
09/27/2018Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
07/18/2018Permit IssuedWARREN ELEVATOR SVC COGeneral Wiring
1 project · most recent 08/04/2026
Steel
FiledStatusContractorScope
08/04/2026Permit IssuedMJH CONSTRUCTION CORPSteel
1 project · most recent 08/04/2026
Fence
FiledStatusContractorScope
08/04/2026Permit IssuedMJH CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/07/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2025Fail-Final Boiler Equipment InspectionFailView ↗
09/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/26/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
05/21/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/21/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/21/2026MeteringFAHAD FATEHenergy_progress
05/21/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/21/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/21/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/21/2026Interior lighting powerFAHAD FATEHenergy_progress
05/21/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/21/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/21/2026Air barrier — testing FAHAD FATEHenergy_progress
05/21/2026Lighting controlsFAHAD FATEHenergy_progress
05/21/2026Fenestration areasFAHAD FATEHenergy_progress
05/21/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/18/2026FinalAmauris Ramirezprogress
03/18/2026Mechanical SystemsAmauris Ramirezspecial
08/11/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/11/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/11/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/11/2025Air barrier — testing FAHAD FATEHenergy_progress
08/11/2025Exterior lighting powerFAHAD FATEHenergy_progress
08/11/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/11/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/11/2025Fenestration areasFAHAD FATEHenergy_progress
Latest 25 of 117.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/03/2026B00050372-I1Request digital key ↗
08/23/2026B01166681-I1Request digital key ↗
08/23/2026B01166677-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION14
05/28/2025321632220Open ↗
05/28/2025320522911Open ↗
05/28/2025302323215Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION12
08/07/2019321632220Open ↗
08/16/2018321632220Open ↗
05/29/2018320522911Open ↗
Showing 3 of 12 on file for this type
▸BISPLACE OF ASSEMBLY4
03/09/2016321232386Open ↗
03/09/2016321232377Open ↗
02/08/2016321232377Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/13/2018321632220Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)5
08/21/2026B00977146-A4Open ↗
08/13/2026B00977146-I1Open ↗
08/13/2026B00977146-P9Open ↗
Showing 3 of 5 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/20/2016320522911Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature22
10/01/2026B00977146-S6Open ↗
09/01/2026B01374704-I1Open ↗
08/28/2026B00977146-P9Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/23/2026B01166677-I1Open ↗
08/21/2026B00977146-A4Open ↗
08/16/2026B01374704-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/01/2026B00977146-S6Open ↗
10/01/2026B00977146-S6Open ↗
09/01/2026B01374704-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
08/16/2018321632220Open ↗
08/16/2018321632220Open ↗
02/28/2018321632220Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/10/2014320877342Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/29/2017321632220Open ↗
10/16/2015320522911Open ↗
▸BISSCHEDULE B - PLUMBING1
02/13/2013320715099Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/27/2013320715099Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/21/2026B00977146-A4Open ↗
08/13/2026B00977146-P9Open ↗
08/13/2026B00977146-P6Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
08/29/2012320522911Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/15/2026B01374704-I1Open ↗
08/13/2026B00977146-S5Open ↗
08/13/2026B00977146-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026B00977146-S2Open ↗
08/13/2026B00977146-S3Open ↗
08/13/2026B00977146-S6Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/01/2018321632220Open ↗
02/13/2013320715099Open ↗
08/29/2012320522911Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/14/2011320380397Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
08/16/2018321632220Open ↗
02/21/2017320522911Open ↗
08/15/2016320877342Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/19/2015320715099Open ↗
▸Inspections & Test Reports6
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
08/04/2025302337004Open ↗
08/04/2025302337004Open ↗
▸BISSOIL REPORT2
02/28/2018321632220Open ↗
02/28/2018321632220Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00977146-S6Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00977146-S6Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
09/10/2014320877342Open ↗
02/13/2013320715099Open ↗
08/29/2012320522911Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/05/2025302337004Open ↗
08/15/2016320877342Open ↗
03/19/2015320715099Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/20/2016320522911Open ↗
02/20/2016320522911Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/29/2012320522911Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
12/29/2017321632220Open ↗
08/15/2016320877342Open ↗
02/20/2016320522911Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
12/29/2017321632220Open ↗
10/16/2015320522911Open ↗
09/10/2014320877342Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
06/25/2019321632220Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification5
08/21/2026B00977146-A4Open ↗
08/13/2026B00977146-A3Open ↗
08/13/2026B00977146-P9Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/16/2018321632220Open ↗
▸BISPLOT DIAGRAM1
08/29/2012320522911Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00977146-S6Open ↗