← Back
Five to six families
101 ST NICHOLAS AVENUE
BROOKLYN · Bushwick (West) · BIN 3073704
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R4Zoning
4,275 sfGross Floor Area
6Units
Rent Stabilized38 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: A&A LIN ASSOCIATES INC · 2,250 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A A LIN ASSOCIATES1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2023$1.2M—Private party → A&A LIN ASSOCIATES INC$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC502/19/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATSON'S PLUMBING HEATINGGeneral Contractor303/21/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506402/19/2024
Building Lifecycle
All (84)Filed (5)Permit Issued (2)Signed Off (2)Violation (60)Inspection (6)Special Inspection (9)
05/06/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2025
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-S1
10/01/2025
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-I1
06/11/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
04/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/01/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2024
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-P3
02/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
02/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
02/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/19/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
02/19/2024
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
02/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
02/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
01/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
XIAOHONG ZHAO
01/10/2024
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-P2
01/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/28/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-P1
09/27/2023
Violation issued (ECB, closed)
Construction
09/27/2023
Violation issued (ECB, closed)
Construction
09/27/2023
Violation issued (ECB, closed)
Construction
08/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/13/2023
Permit issued — Plumbing
B00901234-S1-PL
07/13/2023
Permit issued — General Construction
B00901234-I1-GC
07/07/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-S1
07/07/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B00901234
B00901234-I1
03/27/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
04/21/2020
Violation issued (HPD, open)
A
04/21/2020
Violation issued (HPD, open)
A
04/21/2020
Violation issued (HPD, open)
C
04/21/2020
Violation issued (HPD, closed)
C
04/21/2020
Violation issued (HPD, open)
A
10/31/2019
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
09/01/2017
Violation issued (HPD, open)
C
09/01/2017
Violation issued (HPD, open)
A
08/24/2017
Violation issued (HPD, open)
C
08/24/2017
Violation issued (HPD, open)
A
08/24/2017
Violation issued (HPD, open)
A
08/24/2017
Violation issued (HPD, closed)
C
07/14/2017
Violation issued (HPD, open)
B
07/14/2017
Violation issued (HPD, open)
A
07/14/2017
Violation issued (HPD, open)
B
07/14/2017
Violation issued (HPD, open)
A
07/14/2017
Violation issued (HPD, open)
B
07/14/2017
Violation issued (HPD, open)
A
07/14/2017
Violation issued (HPD, open)
A
07/14/2017
Violation issued (HPD, open)
A
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG07/13/2023
DOB NOWGeneral ConstructionSigned-offWATSON'S PLUMBING HEATING07/13/2023
1 project · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/19/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/19/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/19/2024Tenant Protection Plan Compliance—special
02/19/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/19/2024Maintenance informationXIAOHONG ZHAOenergy_progress
02/19/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
02/19/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
01/11/2024Tenant Protection Plan ComplianceXIAOHONG ZHAOspecial
01/04/2024Tenant Protection Plan Compliance—special
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00901234-P1Request digital key ↗
08/27/2026B00901234-S1Request digital key ↗
08/27/2026B00901234-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00901234-S1Open ↗
08/27/2026B00901234-I1Open ↗
08/27/2026B00901234-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026B00901234-P3Open ↗
08/27/2026B00901234-P3Open ↗
08/27/2026B00901234-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00901234-S1Open ↗
08/27/2026B00901234-P3Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00901234-P3Open ↗
08/27/2026B00901234-I1Open ↗
08/27/2026B00901234-P1Open ↗