| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | SHAPEL GENERAL CONTRACTIN | Heating and Air Conditioning Systems, Heating Systems | Heat / Cool |
| 04/16/2026 | Signed-off | THE SCI CONSTRUCTION | Air Conditioning Systems | Cooling Multistack Multistack chiller MSS030KCH 150 tons · Chiller ×20 |
| 07/10/2025 | Signed-off | CJS INDUSTRIES INC | Air Conditioning Systems, Heating Systems | Cooling Carrier CARRIER - 50BVT034GTD62EDB 398,000 BTU · Wshp ×4 CARRIER - 50VQP3000A16CALM 365,000 BTU · Wshp ×4 CARRIER - 50WCB060PBMB5 55,000 BTU · Wshp ×4 CARRIER - 50HQP150MA16CAFV 139,000 BTU · Wshp ×2 CARRIER - 50BVT034GTCG2 399,000 BTU · Wshp ×2 CARRIER - 50BVT044GHC62EDB 559,000 BTU · Wshp ×2 CARRIER -50VQP181BA16 160,000 BTU · Vrf Outdoor ×2 Heating Carrier CARRIER - 50WCF0485BNE 47,000 BTU · Heat Pump Outdoor ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2025 | Signed-off | KG SPRINKLER CORP | 2 heads |
| 07/10/2025 | Signed-off | STANDARD FIRE PROTECT LLC | 359 heads |
| 08/27/2024 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/21/2026 | Permit Issued | J. CAIAZZO PLBG & HTG COR | Gas |
| 10/16/2025 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| 07/10/2025 | Signed-off | STANDARD PLBG SVS LLC | Water/Sanitary |
| 08/27/2024 | Signed-off | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Complete | NORCAL ELECTRIC LLC | — |
| 09/15/2026 | Permit Issued | AE ELECTRIC INC | General Wiring |
| 08/30/2026 | Permit Issued | LEBO ELECTRIC LLC | General Wiring |
| 07/02/2026 | Complete | FAMULARO ELEC'L CONTR'G C | — |
| 02/02/2026 | Permit Issued | DENALI ELECTRIC CORP | — |
| 04/15/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 03/21/2025 | Complete | T. DIRUSSO ELEC'L CONT IN | General Wiring |
| 12/11/2024 | Complete | STANCO SYSTEM ELEC'L CONT | — |
| 11/27/2024 | Complete | A & S ELECTRIC INC. | — |
| 10/30/2024 | Complete | PROFF ELECTRICAL LLC | — |
| 10/29/2024 | Complete | PROFF ELECTRICAL LLC | — |
| 10/29/2024 | Complete | PROFF ELECTRICAL LLC | — |
| 10/29/2024 | Complete | PROFF ELECTRICAL LLC | — |
| 10/11/2024 | Complete | ZIN ELECTRICAL, INC | — |
| 09/05/2024 | Complete | DAVEN ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/12/2026 | — | — | Steel |
| 07/10/2025 | Signed-off | CJS INDUSTRIES INC | Steel |
| 08/27/2024 | Signed-off | M&T PLBG AND HTG CO., INC | 1 scope_items |
| Owner | Filings | Most Recent |
|---|---|---|
| AKAM ASSOCIATES | 37 | 09/13/2026 |
| EDWARD MINSKOFF EQUITIES, INC | 211 | 09/07/2026 |
| 89 MURRAY STREET ASSOCIATES | 17 | 07/08/2026 |
| NEW YORK CITY PRIME | 3 | 07/08/2026 |
| RELATED MANAGEMENT | 6 | 07/08/2026 |
| CONSTRUCTED | 4 | 04/09/2026 |
| 270 GREENWICH STREET | 34 | 03/22/2026 |
| HRH CONSTRUCTION | 20 | 03/22/2026 |
| HKS CONSTRUCTION | 4 | 03/22/2026 |
| ARH CONSTRUCTION | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| KMB DESIGN GROUP, LLC | 3 | 08/25/2026 |
| WARE MALCOMB | 1 | 08/25/2026 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 10 | 07/27/2026 |
| VOLUME SPACE CONSULTING INC. | 1 | 04/15/2026 |
| HNY CONSULTING ENGINEERS LLC | 2 | 03/12/2026 |
| JAM ARCHITECTS, D.P.C. | 1 | 03/12/2026 |
| WITHDRAWN | 1 | 03/12/2026 |
| OSPINO ENGINEERING PLLC | 1 | 01/16/2026 |
| AMA CONSULTING ENGINEERS, PC | 9 | 10/16/2025 |
| ANDREW MAASS | 9 | 06/20/2025 |
| KAHN ARCHITECTURE & DESIGN PC | 3 | 04/10/2025 |
| TITAN ENGINEERS PC | 1 | 04/10/2025 |
| LEON SKVIRSKY PE | 10 | 04/08/2025 |
| STONEFIELD ENGINEERING & DESIGN | 2 | 12/02/2024 |
| SLADE ARCHITECTURE | 3 | 11/13/2024 |
| NIC 88 CORP | 1 | 09/23/2024 |
| ROBERT DERECTOR ASSOCIATES | 4 | 08/27/2024 |
| CSR ASSOCIATES, PA | 2 | 08/27/2024 |
| GGA STUDIOS, DPC | 1 | 06/27/2024 |
| LUKE LICALZI, P.E., P.C. | 2 | 06/20/2024 |
| KAHN ASSOCIATES, INC | 1 | 06/30/2021 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 1 | 06/07/2021 |
| MCALPINE ASSOCIATES ARCHITECTS PC | 1 | 05/27/2021 |
| KZ ENGINEERING, P.C | 2 | 03/06/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILMAN CONSULTANT | 26 | 03/21/2026 |
| LOUIS STRIAR | 20 | 03/21/2026 |
| GILLMAN CONSULTING | 16 | 03/21/2026 |
| RPO | 12 | 03/21/2026 |
| HOWARD L ZIMMERMAN ARCHITECTS | 10 | 03/21/2026 |
| ANDREW MAASS | 7 | 03/21/2026 |
| GRS CONSULTING SERVICES | 4 | 03/21/2026 |
| BASIC GROUPS | 2 | 03/21/2026 |
| DVA Advisors | 3 | 03/21/2026 |
| HIERARCH-E | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| COLGATE ENTERPRISE CORP | General Contractor | 13 | 07/08/2026 |
| SIGNSTAR NYC | Scaffold | 10 | 07/08/2026 |
| CONSTRUCTION MANAGEMENT & | General Contractor | 9 | 03/21/2026 |
| GREGOR INDUSTRIES INC | General Contractor | 4 | 07/08/2026 |
| NEW ROC CONTRACTING CORP | General Contractor | 4 | 03/21/2026 |
| BRONZE HILL INC | General Contractor | 4 | 03/21/2026 |
| CJS INDUSTRIES INC | General Contractor | 4 | 07/08/2026 |
| MJH ENERGY CONSULTING INC | Plumbing | 3 | 09/13/2026 |
| THE SCI CONSTRUCTION | General Contractor | 3 | 09/13/2026 |
| LI FINISH CONSTRUCTION CO | General Contractor | 3 | 03/21/2026 |
| PLATINUM GENERAL SERVICES | General Contractor | 3 | 03/21/2026 |
| J. CAIAZZO PLBG & HTG COR | Plumbing | 2 | 09/07/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 2 | 07/08/2026 |
| ODYSSIA GLOBAL COMM. CORP | General Contractor | 2 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 2 | 07/08/2026 |
| SHAPEL GENERAL CONTRACTIN | General Contractor | 2 | 09/03/2026 |
| ZOOM CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| PATRIOT ELECTRIC CORP | Electrical | 2 | 03/22/2026 |
| STANDARD PLBG SVS LLC | Plumbing | 1 | 07/08/2026 |
| EUROREMONT INC | General Contractor | 1 | 07/08/2026 |
| APOLLO ELECTRIC USA, INC | Electrical | 1 | 03/22/2026 |
| DAVEN ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| ICONIC ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| JUAN RAMIREZ | Electrical | 1 | 03/21/2026 |
| MAK ELECTRICAL CONTR CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 3 | 08/25/2026 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 7 | 07/27/2026 |
| SYNERGY ENGINEERING | 784 | 14 | 10/16/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 7 | 12/02/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 8 | 10/28/2024 |
| NIC 88 CORP | 8371 | 1 | 09/23/2024 |
| DOMANI INSPECTION SERVICE | 843 | 1 | 06/27/2024 |
| JON LIBASCI | 3068 | 1 | 06/20/2024 |
| MCALPINE ARCHITECTURE PC | 5694 | 1 | 05/27/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Boiler Equipment | Permit Issued | MJH ENERGY CONSULTING INC | 09/11/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THE SCI CONSTRUCTION | 09/11/2026 |
| DOB NOW | Plumbing | Permit Issued | J. CAIAZZO PLBG & HTG COR | 09/03/2026 |
| DOB NOW | General Construction | Permit Issued | SHAPEL GENERAL CONTRACTIN | 09/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SHAPEL GENERAL CONTRACTIN | 09/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THE SCI CONSTRUCTION | 07/21/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | MJH ENERGY CONSULTING INC | 07/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | EMPAC CONTRACTING CORP | 05/20/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | NEW YORK CITY PRIME CORP | 04/16/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | TC ZONE INC | 01/21/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THE SCI CONSTRUCTION | 09/12/2025 |
| DOB NOW | Plumbing | Permit Issued | J. CAIAZZO PLBG & HTG COR | 09/12/2025 |
| DOB NOW | Boiler Equipment | Permit Issued | MJH ENERGY CONSULTING INC | 09/12/2025 |
| DOB NOW | Structural | Signed-off | CJS INDUSTRIES INC | 06/05/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/05/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 04/14/2025 |
| DOB NOW | General Construction | Signed-off | PLATINUM GENERAL SERVICES | 01/31/2025 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MANAGEMENT & | 11/13/2024 |
| DOB NOW | General Construction | Signed-off | CUBE BUILDERS GROUP NY | 11/01/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/22/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/21/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/21/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/21/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/18/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/18/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/18/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/18/2024 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 10/18/2024 |
| DOB NOW | General Construction | Signed-off | ZOOM CONTRACTING INC | 10/07/2024 |
| DOB NOW | Sprinklers | Signed-off | STANDARD FIRE SUPP CORP | 09/25/2024 |
| DOB NOW | Plumbing | Signed-off | A&H PLUMBING,LLC | 09/25/2024 |
| DOB NOW | General Construction | Signed-off | EUROREMONT INC | 09/18/2024 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 09/17/2024 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MANAGEMENT & | 08/14/2024 |
| DOB NOW | General Construction | Signed-off | CJS INDUSTRIES INC | 07/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CJS INDUSTRIES INC | 07/30/2024 |
| DOB NOW | General Construction | Signed-off | BRONZE HILL | 07/15/2024 |
| DOB NOW | Plumbing | Signed-off | ANTHONY DISABATO | 07/10/2024 |
| DOB NOW | General Construction | Signed-off | BRONZE HILL | 07/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CONSTRUCTION MANAGEMENT & | 06/11/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/10/2026 | Under Review Boiler Equipment Inspection | Under Review | View ↗ |
| 08/10/2026 | Under Review Boiler Equipment Inspection | Under Review | View ↗ |
| 07/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/09/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 07/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/27/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/03/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/03/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/27/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/20/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/08/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/03/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 08/10/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 08/10/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 08/10/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 08/10/2026 | Tenant Protection Plan Compliance | — | special |
| 08/10/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 08/10/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/10/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/10/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/10/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 08/10/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/10/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/10/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/03/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 08/03/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 08/03/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 08/03/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Tenant Protection Plan Compliance | Jon Colatrella | special |
| 07/24/2026 | HVAC-R and service water piping design and insulation | Jon Colatrella | energy_progress |
| 07/24/2026 | HVAC-R and service water heating equipment | Jon Colatrella | energy_progress |
| 07/24/2026 | HVAC-R and service water heating system controls | Jon Colatrella | energy_progress |
| 07/24/2026 | Maintenance information | Jon Colatrella | energy_progress |
| 07/24/2026 | Heating Systems | Jon Colatrella | special |
| 07/17/2026 | Maintenance information | Jon Colatrella | energy_progress |