ECB02/05/2021A EXTERNAL EXHAUST APPROX TWO FT WIDE & EXTENDING TWO FT OUT FROM THE REAR WALL OF A BAKERY ON THE GROUND FLOOR IS LOCATED APPROX 8FT OFF THE GROUND & APPROX 4FT FROM A SECOND FLOOR WINDOW, AT THE REAR OF THE B$6K due
HPD04/26/2016§ 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE WHOLE ITEM BLOCKING SCUTTLE AT PUBLIC HALL, 3rd STORY
HPD04/26/2016§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT WEST WALL AT PUBLIC HALL, 2nd STORY
HPD04/26/2016§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING CEILING AT PUBLIC HALL, 2nd STORY
HPD04/26/2016§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT PUBLIC HALL, 3rd STORY
HPD08/29/2009§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING ***MINIMUM 100 WATTS REQUIRED***
HPD09/03/2004§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING GLASS LOWER SASH KITCHEN 3 STY. APT.
HPD09/03/2004§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE NORTH ROOM 3 STY. APT.
ECB01/09/2020WORK WITHOUT PERMIT.NOTE:STRUCTURE WITH ROOF BUILT AT REAR ATTACHED TOEXISTING STRUCTURE PLYWOOD 2X3 WOD AND METAL ZINC FOR ROOFING MAKESHIFT WOD AND METAL STRUCTURE ERECTED AT REAR OF BUILDING NO PERMIT.REMEDYNothing owed — awaiting certificate of correction
ECB03/07/2007WORK W/O PERMIT. NOTED: DOOR OPENING CUT INTO BEARING WALL AT 1ST FL PUBLIC HALLWAY CREATING NEW ENTRANCE LEADING TO CELLAR PARTITIONS ERECTED AT 1ST FL COMMERCIAL SPACE CREATING A CORRIDOR/ HALLWAY LEADING TONothing owed — awaiting certificate of correction
ECB10/31/1992WORK WITHOUT A PERMIT. PARTITIONS ERECTED AT CELLAR CREATING (2) BEDROOMS, ONE (1) KITCHEN, (1) TOILET, OPEN SPACE AND (1) CLOSET. REMEDY: OBTAIN PERMITNothing owed — awaiting certificate of correction