← Back
BuildNYC
Elevator apt, fireproof without stores
Pacific House
1010 PACIFIC STREET · BIN 3428849
💬 Discuss this project
2022Year Built
9Stories
D3Building Class
M1-2A/R6AZoning
165,024 sfGross Floor Area
175Units
LL97 CoveredRent Stabilized2 Active Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 1010 Pacific Owner · 25,869 sf lot · 6.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTwin Group Associates INC8 filings
RoofTwin Group Associates INC2 filings
Floor 9Twin Group Associates INC1 filing
Floor 8Twin Group Associates INC1 filing
Floor 7Twin Group Associates INC1 filing
Floor 6Twin Group Associates INC1 filing
Floor 5Twin Group Associates INC1 filing
Floor 4
Floor 3
Floor 2Twin Group Associates INC1p · 1 filing
Floor 1Twin Group Associates INC1p · 2 filings
CellarTwin Group Associates INC2p · 2 filings
Site & exteriorTwin Group Associates INC7 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Twin Group Associates9107/08/2026
1010 Pacific Owner1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patuxent Engineering1203/21/2026
Lombardo Building Consultants203/21/2026
Speedy Expediting2403/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Twin Group AssociatesGeneral Contractor907/08/2026
Manhattan D EnterprisesScaffold907/08/2026
Tristate Fire SprinklersFire Protection607/08/2026
Mmi Plumbing & HeatingPlumbing607/08/2026
International Concrete C*Scaffold303/21/2026
GWT EnterprisesScaffold303/21/2026
Net Power ElectricElectrical203/21/2026
Twin Group AssociatesScaffold207/08/2026
Net Power ElectricGeneral Contractor103/22/2026
Silvercup Scaffolding IScaffold107/08/2026
V. Vass ElectricElectrical103/22/2026
Fqe ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM Engineering1514902/23/2023
M. International Engineering3129102/10/2020
Building Lifecycle
All (166)Filed (28)Permit Issued (29)Signed Off (19)Violation (46)Inspection (12)Objection (14)Special Inspection (18)
05/14/2026
Violation issued (ECB, closed)
Elevators
03/08/2026
Violation issued (HPD, closed)
B
03/08/2026
Violation issued (HPD, closed)
B
03/08/2026
Violation issued (HPD, closed)
C
03/08/2026
Violation issued (HPD, closed)
A
02/17/2026
Violation issued (FDNY_ORDER, closed)
09/10/2025
Violation issued (HPD, open)
B
09/10/2025
Violation issued (HPD, closed)
B
09/10/2025
Violation issued (HPD, closed)
A
09/10/2025
Violation issued (HPD, closed)
B
09/10/2025
Violation issued (HPD, closed)
B
03/16/2025
Violation issued (HPD, open)
B
03/16/2025
Violation issued (HPD, closed)
C
08/04/2023
Violation issued (HPD, closed)
A
08/04/2023
Violation issued (HPD, closed)
A
08/04/2023
Violation issued (HPD, closed)
B
08/04/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
A
06/12/2023
Signed off — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB #321590328.
B00365528-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2023
Objection resolved — Addressed
02/24/2023
Objection raised — Admin
02/23/2023
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB #321590328.
B00365528-P3
02/08/2023
Signed off — Alteration
Combined Sprinkler/Standpipe with Siamese Connection installed on dedicated Fire Sprinkler Service in conjunction with NB # 321590328
B00365560-I1
02/07/2023
Signed off — Alteration
TEMPORARY AIR PRESSURIZED STANDPIPE SYSTEM IN CONJUNCTION WITH NB # 321590328
B00412243-I1
02/01/2023
Signed off — Alteration
B00365527-I1
02/01/2023
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB #321590328.
B00365528-P2
02/01/2023
Objection resolved — Addressed
02/01/2023
Objection resolved — Addressed
02/01/2023
Objection resolved — Addressed
01/31/2023
Signed off — Alteration
B00287466-I1
01/26/2023
Objection raised — Mechanical
01/26/2023
Objection raised — Scope
01/26/2023
Objection raised — Structural
01/25/2023
Signed off — Alteration
B00571632-I1
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
01/25/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
01/24/2023
Filed — Alteration
Combined Sprinkler/Standpipe with Siamese Connection installed on dedicated Fire Sprinkler Service in conjunction with NB # 321590328
B00365560-P1
01/24/2023
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590328 .
B00365531-I1
01/18/2023
Special inspection requirement — Standpipe Systems
RAUL VELASQUEZ MARTINEZ
01/18/2023
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
01/10/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
01/03/2023
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
01/03/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2022
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
12/28/2022
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
12/23/2022
Signed off — Alteration
INSTALLATION OF NEW CURB CUT IN CONJUNCTION WITH NB #321590328.
B00367799-I1
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTwin Group Associates12/16/2022
DOB NOWStructuralSigned-offTwin Group Associates09/16/2022
DOB NOWStandpipeSigned-offTristate Fire Sprinkler08/16/2022
DOB NOWSprinklersSigned-offTristate Fire Sprinkler08/16/2022
DOB NOWMechanical SystemsSigned-offTwin Group Associates08/10/2022
DOB NOWPlumbingSigned-offMichael Itskovich07/20/2022
DOB NOWPlumbingSigned-offMichael Itskovich07/19/2022
DOB NOWPlumbingSigned-offMichael Itskovich06/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offGWT Enterprises06/15/2022
DOB NOWPlumbingSigned-offMichael Itskovich04/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises03/17/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises03/17/2022
DOB NOWPlumbingSigned-offMichael Itskovich03/16/2022
DOB NOWConstruction FenceSigned-offTwin Group Associates02/22/2022
DOB NOWStandpipeSigned-offTristate Fire Sprinkler01/25/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises12/22/2021
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises10/25/2021
DOB NOWProtection and Mechanical MethodsSigned-offSilvercup Scaffolding I10/13/2021
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises10/12/2021
DOB NOWStructuralSigned-offTwin Group Associates10/12/2021
DOB NOWMechanical SystemsSigned-offTwin Group Associates08/31/2021
DOB NOWStandpipeSigned-offTristate Fire Sprinkler08/20/2021
DOB NOWSprinklersSigned-offTristate Fire Sprinkler08/20/2021
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises08/19/2021
DOB NOWProtection and Mechanical MethodsSigned-offInternational Concrete C*08/09/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises04/28/2021
DOB NOWPlumbingSigned-offMichael Itskovich04/23/2021
DOB NOWStandpipeSigned-offTristate Fire Sprinkler01/26/2021
DOB NOWConstruction FenceSigned-offTwin Group Associates01/13/2021
BIS—ISSUEDTwin Group Associates05/02/2022
BIS—ISSUEDTwin Group Associates08/13/2021
BIS—ISSUEDTwin Group Associates03/12/2021
BIS—ISSUEDTwin Group Associates02/04/2021
BISSPISSUEDUnited Fire Protection CRP12/03/2007
BISMHISSUEDAffinity Creations10/10/2007
8 projects · most recent 04/11/2024
General Wiring
FiledStatusContractorScope
04/11/2024CompleteNet Power ElectricGeneral Wiring
01/18/2023CompleteFqe Electric178 meters, 178 new_meters
04/08/2022CompleteFqe ElectricGeneral Wiring
10/27/2021CompleteFqe Electric—
04/14/2021CompleteV. Vass Electric—
04/14/2021CompleteV. Vass Electric—
02/14/2020CompleteV. Vass Electric—
02/14/2020CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/10/2023Pass-Final SD - Fire PumpPassView ↗
01/03/2023Fail-Final SD - Fire PumpFailView ↗
01/03/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/28/2022Pass-Final SD - More than 10 Requested FloorsPassView ↗
12/28/2022Pass-Final SP - More than 10 Requested FloorsPassView ↗
12/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/25/2023Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
01/25/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
01/18/2023Standpipe SystemsRAUL VELASQUEZ MARTINEZspecial
01/18/2023Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
01/18/2023Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
10/12/2021FinalJOHN O'CONNOR, P.E.progress
04/20/2021FinalJOSEPH BADINTERprogress
04/20/2021Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
04/20/2021Structural Steel - WeldingRAUL VELASQUEZ MARTINEZspecial
04/20/2021MasonryRAUL VELASQUEZ MARTINEZspecial
04/20/2021Structural Steel - High Strength BoltingRAUL VELASQUEZ MARTINEZspecial
04/20/2021Structural Steel - DetailsRAUL VELASQUEZ MARTINEZspecial
03/24/2021Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
03/24/2021FinalJOSEPH BADINTERprogress
03/24/2021Structural Steel - WeldingJOSEPH BADINTERspecial
03/24/2021Structural Steel - High Strength BoltingJOSEPH BADINTERspecial
03/24/2021Structural Steel - DetailsJOSEPH BADINTERspecial
03/24/2021MasonryRAUL VELASQUEZ MARTINEZspecial
▾Documents — 278 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch11
09/01/2026B00505103-I1Request digital key ↗
09/01/2026B00505103-P1Request digital key ↗
09/01/2026B00571632-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00287466-I1Request digital key ↗
09/02/2026B00365528-I1Request digital key ↗
09/02/2026B00365528-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026B00365560-I1Request digital key ↗
09/02/2026B00412243-I1Request digital key ↗
08/14/2026B00365560-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00287466-I1Request digital key ↗
09/02/2026B00365560-I1Request digital key ↗
08/14/2026B00365560-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence3
09/02/2026B00286451-I1Request digital key ↗
08/15/2026B00286451-P2Request digital key ↗
08/15/2026B00286451-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00365531-I1Request digital key ↗
08/15/2026B00365531-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/15/2026B00367799-P1Request digital key ↗
08/14/2026B00367799-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00312321-I1Request digital key ↗
09/02/2026B00312320-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00365527-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION16
05/17/2023321590328Open ↗
04/21/2023321590328Open ↗
01/10/2023321590328Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION8
08/13/2021321590328Open ↗
05/28/2021340811429Open ↗
03/16/2021321590328Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/21/2021340749364Open ↗
07/31/2020340749364Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/18/2023340749364Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
01/13/2023321590328Open ↗
12/28/2020321590328Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/28/2020321590328Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/28/2020321590328Open ↗
▸BISVERIFY TAX LOT1
01/16/2023321590328Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/28/2020321590328Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/20/2022321590328Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00412243-I1Open ↗
09/01/2026B00505103-P1Open ↗
09/01/2026B00505103-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/24/2026B00365560-P1Open ↗
08/23/2026B00365531-P1Open ↗
08/23/2026B00365531-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00609987-I1Open ↗
08/23/2026B00365531-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/17/2021340811429Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/31/2020340749364Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2020340749364Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE2
05/22/2008310031364Open ↗
05/14/2008310031364Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
01/13/2025321590328Open ↗
12/28/2020321590328Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/02/2023321590328Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/24/2023321590328Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/24/2023321590328Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/28/2020321590328Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026B00287466-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
09/24/2020321590328Open ↗
07/31/2020340749364Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/27/2021321590328Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/31/2020340749364Open ↗
▸Environmental & Asbestos27
▸DOB NOWOER: Notice to Proceed16
09/02/2026B00412243-I1Open ↗
08/13/2026B00365560-P1Open ↗
08/13/2026B00286451-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B00287466-I1Open ↗
08/13/2026B00312321-I1Open ↗
08/13/2026B00312320-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
05/17/2021340811429Open ↗
09/29/2020321590328Open ↗
07/31/2020340749364Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
03/22/2023321590328Open ↗
10/25/2022340811429Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/26/2007310031364Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00287466-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/28/2023321590328Open ↗
01/27/2021321590328Open ↗
12/28/2020321590328Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/08/2020321590328Open ↗
▸BISINTERIOR LIGHTING POWER1
01/24/2023321590328Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/24/2023321590328Open ↗
▸BISFENESTRATION AREAS1
01/24/2023321590328Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/24/2023321590328Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/24/2023321590328Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/24/2023321590328Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00365527-I1Open ↗
▸Inspections & Test Reports42
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/28/2023321590328Open ↗
11/23/2021321590328Open ↗
05/17/2021340811429Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
07/07/2021321590328Open ↗
07/07/2021321590328Open ↗
07/06/2021321590328Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
03/28/2023321590328Open ↗
03/28/2023321590328Open ↗
03/28/2023321590328Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/24/2023321590328Open ↗
01/24/2023321590328Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/25/2023321590328Open ↗
01/27/2021321590328Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/24/2023321590328Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/05/2022321590328Open ↗
▸BISMASONRY1
01/24/2023321590328Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/07/2022321590328Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/07/2022321590328Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
04/21/2023321590328Open ↗
01/10/2023321590328Open ↗
12/29/2022321590328Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/29/2023321590328Open ↗
05/25/2021340749364Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/31/2022340811429Open ↗
▸BISFINAL1
10/25/2022340811429Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT3
12/03/2007310031364Open ↗
10/10/2007310031364Open ↗
10/10/2007310031364Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/24/2022321590328Open ↗
02/10/2021321590328Open ↗
01/27/2021321590328Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
01/24/2022321590328Open ↗
01/27/2021321590328Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/18/2023340749364Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION11
01/02/2025321590328Open ↗
06/22/2023321590328Open ↗
03/29/2023321590328Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/17/2021340811429Open ↗
07/31/2020340749364Open ↗
▸BISEFILING COVER SHEET1
05/04/2020321590328Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION4
01/18/2023340749364Open ↗
01/18/2023340749364Open ↗
01/18/2023340749364Open ↗
Showing 3 of 4 on file for this type
▸BISSHUTOFF DAMPERS1
01/24/2023321590328Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/28/2020321590328Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
01/24/2023321590328Open ↗
▸BISMAINTENANCE INFORMATION1
01/24/2023321590328Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/24/2023321590328Open ↗